Solar installers in Clovis, California
Most installs here are in Fresno County.
Who installs the most solar in Clovis?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Clovis are Sunrun (593), Citadel Roofing and Solar (348) and SOLAR NEGOTIATORS (253). They account for 1,194 of the 3,101 residential solar installs interconnected there in that window.
In all, 22,925 homes in Clovis have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 160 installers with installs in this window. 74 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 593 | 2,221 |
| 2 | Citadel Roofing and Solar | 348 | 703 |
| 3 | SOLAR NEGOTIATORS | 253 | 1,088 |
| 4 | GAF Energy | 247 | 247 |
| 5 | Leonard's Roofing, Inc. | 223 | 737 |
| 6 | Empower Electric Solar | 115 | 451 |
| 7 | Tesla Energy Operations (formerly SolarCity) | 102 | 2,330 |
| 8 | DICK DONALD P AIR CONDITIONING INC | 100 | 267 |
| 9 | Infinity Energy, Inc | 100 | 588 |
| 10 | SUNNOVA ENERGY CORPORATION | 86 | 90 |
| 11 | SunPower | 69 | 1,095 |
| 12 | FREEDOM FOREVER LLC | 58 | 383 |
| 13 | Quality Home Services | 53 | 1,016 |
| 14 | Evans Energy | 49 | 383 |
| 15 | SUNMADE SMART ROOFING SOLAR & ELECTRIC | 35 | 36 |
| 16 | BRIGHT OPS | 33 | 36 |
| 17 | Sol-Tek Solar | 30 | 39 |
| 18 | NOVA WEST ENERGY SOLUTIONS INC | 26 | 26 |
| 19 | Complete Solar | 24 | 52 |
| 20 | SUPREME SOLAR & ELECTRIC | 21 | 23 |
| 21 | Valley Unique Electric | 21 | 379 |
| 22 | Integrated Energy Group LLC | 20 | 20 |
| 23 | PACIFIC SOLAR | 20 | 89 |
| 24 | A & J SOLAR ELECTRIC INC | 16 | 28 |
| 25 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 15 | 15 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 2,330 | 2,330 |
| 2 | Sunrun | 2,221 | 2,221 |
| 3 | SunPower | 1,095 | 1,095 |
| 4 | SOLAR NEGOTIATORS | 1,088 | 1,088 |
| 5 | Quality Home Services | 1,016 | 1,016 |
| 6 | Vivint Solar Developer, LLC | 1,002 | 1,002 |
| 7 | Energy Concepts | 859 | 859 |
| 8 | Leonard's Roofing, Inc. | 737 | 737 |
| 9 | Citadel Roofing and Solar | 703 | 703 |
| 10 | Infinity Energy, Inc | 588 | 588 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 2,415 | 118 |
| 2023 | 2,549 | 181 |
| 2024 | 1,669 | 785 |
| 2025 | 1,484 | 1,100 |
| 2026 (through Aug 31, 2026) | 910 | 601 |
Under the Net Billing Tariff (NEM 3.0)
2,271 of the 22,925 residential solar installs in Clovis (9.9% of the 22,922 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.9% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Clovis
| 1 | Sunrun | 713 | 709 | 99.4% |
| 2 | SOLAR NEGOTIATORS | 279 | 275 | 98.6% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 123 | 105 | 85.4% |
| 4 | Empower Electric Solar | 114 | 113 | 99.1% |
| 5 | Citadel Roofing and Solar | 79 | 4 | 5.1% |
| 6 | FREEDOM FOREVER LLC | 79 | 76 | 96.2% |
| 7 | GAF Energy | 65 | 65 | 100.0% |
| 8 | Quality Home Services | 60 | 56 | 93.3% |
| 9 | DICK DONALD P AIR CONDITIONING INC | 36 | 14 | 38.9% |
| 10 | BRIGHT OPS | 35 | 33 | 94.3% |
| 11 | Evans Energy | 31 | 28 | 90.3% |
| 12 | Sol-Tek Solar | 28 | 27 | 96.4% |
| 13 | SUNMADE SMART ROOFING SOLAR & ELECTRIC | 28 | 28 | 100.0% |
| 14 | Energy Concepts | 24 | 22 | 91.7% |
| 15 | NOVA WEST ENERGY SOLUTIONS INC | 23 | 22 | 95.7% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 2,902 of Clovis’ 3,101 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,470, 50.7%) used modules recorded as Qcells.
In the last 24 months, 3,101 of Clovis’ 3,101 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1,592, 51.3%) used inverters recorded as Tesla.
In the last 24 months, 1,609 of Clovis’ 3,101 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1,106, 68.7%) used batteries recorded as Tesla.
2,256 of 2,962 battery-paired PG&E and SCE installs (76.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 1,470 | 4,593 |
| JA Solar | 501 | 900 | |
| LONGi | 310 | 1,467 | |
| REC | 110 | 1,444 | |
| Elin Energy | 109 | not in top list | |
| Inverter maker | Tesla | 1,592 | 2,096 |
| Enphase | 1,553 | 8,668 | |
| SolarEdge | 369 | 6,250 | |
| SunPower | 80 | 3,113 | |
| Qcells | 79 | not in top list | |
| Battery maker | Tesla | 1,106 | 1,368 |
| Enphase | 292 | 422 | |
| SolarEdge | 105 | 152 | |
| FranklinWH | 64 | 71 | |
| Lunar Energy | 20 | 20 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 20,538 of 22,925 installs, inverters on 22,923. See the methodology and the equipment index.
ZIP codes in Clovis
ZIP codes with their own page where the utilities recorded Clovis on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Clovis
The SGIP report lists 204 battery storage projects with the city Clovis, 119 with the status Paid ($1,426,362 in current incentive allocations, 2,649 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 119 | 2,649 | $1,426,362 |
| PBI in Process | 1 | 348 | $121,800 |
| Reserved | 11 | 2,109 | $643,388 |
| Pending Reservation | 2 | 57 | $84,383 |
| Cancelled | 62 | 3,693 | $2,138,141 |
| RRF Rejected | 9 | 121 | $19,180 |
Installers named on the most SGIP storage projects in Clovis
22 of the 204 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Clovis is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 22,925
- Last 24 months
- 3,101
- Capacity
- 174.9 MW DC
- Median system size
- 7 kW DC
- With battery storage
- 12.9% all time; 67.9% last 24 months
- Third-party owned
- 28.4% where reported
- Ownership types recorded
- PPA 4,719, lease 1,674, prepaid lease 49, other 75
- Median battery size
- 13.5 kWh
- Earliest install in data
- Feb 16, 2000
Common questions
How many homes in Clovis have solar?
22,925 residential solar systems in Clovis were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 3,101 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Clovis?
160 installer names have at least one install interconnected in Clovis in the last 24 months, and 719 appear in the full record.
How common are batteries with new solar in Clovis?
12.9% of the solar installs interconnected in Clovis include battery storage across all years, and 67.9% in the last 24 months (2,105 of 3,101).
How many solar installs in Clovis are under NEM 3.0?
2,271 of the 22,925 residential solar installs in Clovis (9.9% of the 22,922 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.