Energy Concepts
How many solar installs has Energy Concepts done in California, and which license number is on its installs?
Energy Concepts has 3,361 residential solar installs interconnected in California, active in the records from 2003 through 2026 (May 27, 2003 to Mar 31, 2026), most of them in Fresno County (2,584), Madera County (313) and Tulare County (257). The license number recorded on most of its installs, 660643, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 3,361
- Last 24 months
- 64
- Total capacity
- 29,089.7 kW DC
- Median system size
- 8.1 kW DC
- With battery storage
- 6.1% all time; 85.9% last 24 months
- Third-party owned
- 8.1% of 3,358 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 151 installs, latest Apr 28, 2025
- Ownership types recorded
- PPA 81, lease 191
- Median battery size
- 13.5 kWh (59 installs list a capacity)
- First install
- May 27, 2003
- Latest install
- Mar 31, 2026
- Counties
- 11
- Utilities
- PGE 3,074, SCE 287
- CSLB license
- 660643
Is Energy Concepts still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (1 in all).
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2003 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2003 | 6 | 0 |
| 2004 | 4 | 0 |
| 2005 | 0 | 0 |
| 2006 | 4 | 0 |
| 2007 | 1 | 0 |
| 2008 | 2 | 0 |
| 2009 | 5 | 0 |
| 2010 | 6 | 0 |
| 2011 | 8 | 0 |
| 2012 | 9 | 0 |
| 2013 | 7 | 0 |
| 2014 | 26 | 0 |
| 2015 | 146 | 0 |
| 2016 | 179 | 0 |
| 2017 | 289 | 0 |
| 2018 | 296 | 0 |
| 2019 | 348 | 2 |
| 2020 | 346 | 2 |
| 2021 | 422 | 3 |
| 2022 | 542 | 39 |
| 2023 | 565 | 41 |
| 2024 | 127 | 98 |
| 2025 | 22 | 20 |
| 2026 (through Aug 31, 2026) | 1 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
151 of its 3,361 interconnected installs (4.5% of the 3,361 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The latest Net Billing Tariff install was approved Apr 28, 2025.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 421 | 12.5% | not counted |
| NEM 2.0 | 2,789 | 83.0% | 74 (2.7%) |
| Net Billing Tariff | 151 | 4.5% | 128 (84.8%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 272 of Energy Concepts’s installs the utility recorded a third-party ownership type: PPA 81, lease 191, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Energy Concepts exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| SunPower | 220 |
| SunPower Capital LLC | 34 |
| Sun Power Capital LLC | 4 |
| HDM Capital | 3 |
| Lifestyle Energy Financial LLC | 2 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 54 of Energy Concepts’ 64 installs name a module maker in the “Generator Manufacturer” fields, and most of those (33, 61.1%) used modules recorded as SunPower.
In the last 24 months, 64 of Energy Concepts’ 64 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (38, 59.4%) used inverters recorded as SunPower.
In the last 24 months, 44 of Energy Concepts’ 64 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (32, 72.7%) used batteries recorded as Tesla.
175 of 205 battery-paired PG&E and SCE installs (85.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SunPower | 33 | 2,079 |
| Qcells | 15 | 180 | |
| REC | 3 | 205 | |
| Waaree | 3 | not in top list | |
| Silfab | 1 | not in top list | |
| Inverter maker | SunPower | 38 | 2,033 |
| Tesla | 27 | not in top list | |
| Enphase | 18 | 348 | |
| FranklinWH | 10 | not in top list | |
| SolarEdge | 5 | 811 | |
| Battery maker | Tesla | 32 | 68 |
| FranklinWH | 7 | 7 | |
| Enphase | 3 | 10 | |
| Qcells | 1 | not in top list | |
| SunPower | 1 | 86 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,143 of 3,361 installs, inverters on 3,361. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Energy Concepts as developer on 33 battery storage projects and as installer on 33 (33 name it as both), 33 projects in all with 737 kWh of storage. 14 have the status Paid, with $102,823 in current incentive allocations. Applications were received from Aug 11, 2020 to Aug 30, 2024.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 14 | 255 | $102,823 |
| Cancelled | 16 | 432 | $273,002 |
| RRF Rejected | 3 | 49 | $7,393 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 16 | 268 | $42,942 | 10 | $21,142 |
| Equity Resiliency | 11 | 317 | $303,401 | 3 | $71,781 |
| Large-Scale Storage | 3 | 102 | $29,482 | 1 | $9,900 |
| Not stated | 3 | 49 | $7,393 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 660643 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 3,306 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (3,308 of 3,361 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Counties
| County | Installs |
|---|---|
| Fresno | 2,584 |
| Madera | 313 |
| Tulare | 257 |
| Kings | 142 |
| Merced | 33 |
| San Joaquin | 11 |
| San Luis Obispo | 8 |
| Mariposa | 6 |
| Kern | 5 |
| Santa Clara | 1 |
| Sonoma | 1 |
Top cities
| City | Installs |
|---|---|
| Fresno | 1,338 |
| Clovis | 859 |
| Madera | 208 |
| Visalia | 147 |
| Sanger | 91 |
| Kingsburg | 82 |
| Hanford | 77 |
| Lemoore | 50 |
| Coarsegold | 46 |
| Reedley | 45 |
| Selma | 34 |
| Kerman | 33 |
| Dinuba | 32 |
| Tulare | 29 |
| Friant | 25 |
Names as recorded by the utilities
The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| ENERGY CONCEPTS ENTERPRISES INC | 2,059 |
| Energy Concepts | 917 |
| ENERGY CONCEPTS | 330 |
| Energy Concepts Enterprises Inc | 50 |
| Energy Concepts Enterprises | 2 |
| Energy concepts | 1 |
| Energy Concepts Enterprises Inc. | 1 |
| Energy Concepts Enterprises, Inc | 1 |
Common questions
Where does Energy Concepts install solar?
Its installs are spread across 11 counties. The most are in Fresno County (2,584 installs), followed by Madera County (313).
How often does Energy Concepts install batteries with solar?
6.1% of its interconnected solar installs include battery storage across all years, and 85.9% in the last 24 months (55 of 64).
How many Energy Concepts installs are under NEM 3.0 (the Net Billing Tariff)?
151 of its 3,361 interconnected installs (4.5% of the 3,361 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.