A & J SOLAR ELECTRIC INC

How many solar installs has A & J SOLAR ELECTRIC INC done in California, and which license number is on its installs?

A & J SOLAR ELECTRIC INC has 225 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Jan 3, 2019 to Aug 20, 2026), most of them in Fresno County (119), Madera County (26) and Tulare County (20). CSLB lists license 1039514 (A & J SOLAR ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
225
Last 24 months
107
Total capacity
2,006.4 kW DC
Median system size
8.3 kW DC
With battery storage
51.6% all time; 89.7% last 24 months
Third-party owned
9.3% of 225 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
121 installs, latest Aug 20, 2026
Ownership types recorded
PPA 21
Median battery size
27 kWh (81 installs list a capacity)
First install
Jan 3, 2019
Latest install
Aug 20, 2026
Counties
19
Utilities
PGE 197, SCE 28
CSLB license
1039514

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
202010
2021100
2022180
2023611
20244032
20255143
2026 (through Aug 31, 2026)4340

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

121 of its 225 interconnected installs (53.8% of the 225 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.062.7%not counted
NEM 2.09843.6%5 (5.1%)
Net Billing Tariff12153.8%106 (87.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 21 of A & J SOLAR ELECTRIC INC’s installs the utility recorded a third-party ownership type: PPA 21, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches A & J SOLAR ELECTRIC INC exactly.

Third-party owner named on its installsInstalls
Goodleap Financial12
Participate Energy7
Goodleap1
GoodLeap Fiancial1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 105 of A & J SOLAR ELECTRIC INC’s 107 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (45, 42.9%) used modules recorded as Qcells.

In the last 24 months, 107 of A & J SOLAR ELECTRIC INC’s 107 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (61, 57.0%) used inverters recorded as Tesla.

In the last 24 months, 70 of A & J SOLAR ELECTRIC INC’s 107 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (39, 55.7%) used batteries recorded as Tesla.

89 of 116 battery-paired PG&E and SCE installs (76.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4569
JinkoSolar3638
JA Solar8not in top list
REC423
Silfab4not in top list
Inverter makerTesla6162
Enphase28114
SolarEdge1646
FranklinWH713
EG44not in top list
Battery makerTesla3939
SolarEdge1221
Enphase812
FranklinWH814
Lunar Energy22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 215 of 225 installs, inverters on 225. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names A & J SOLAR ELECTRIC INC as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 10 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Apr 7, 2025 to Apr 7, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled110$983

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage110$9830$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1039514A & J SOLAR ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorMay 17, 2018May 31, 2028225

License numbers are the ones the utilities recorded on the interconnection applications (225 of 225 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1039514. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno119
Madera26
Tulare20
San Joaquin19
Kern11
Kings8
Santa Clara3
Solano3
Contra Costa2
Mariposa2
Merced2
San Bernardino2
Yolo2
Amador1
Orange1
San Luis Obispo1
Santa Cruz1
Sonoma1
Stanislaus1

Top cities

CityInstalls
Fresno64
Clovis28
Madera15
Stockton11
Bakersfield10
Visalia10
Sanger8
Hanford6
Coarsegold5
Caruthers4
Manteca4
Oakhurst4
Parlier4
Kingsburg3
Tulare3

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A & J SOLAR ELECTRIC INC196
A&J SOLAR ELECTRIC INC28
A & J Solar Electric Inc1

Common questions

Where does A & J SOLAR ELECTRIC INC install solar?

Its installs are spread across 19 counties. The most are in Fresno County (119 installs), followed by Madera County (26).

How often does A & J SOLAR ELECTRIC INC install batteries with solar?

51.6% of its interconnected solar installs include battery storage across all years, and 89.7% in the last 24 months (96 of 107).

How many A & J SOLAR ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

121 of its 225 interconnected installs (53.8% of the 225 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.