Quality Home Services
How many solar installs has Quality Home Services done in California, and which license number is on its installs?
Quality Home Services has 5,735 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Mar 1, 2011 to Aug 28, 2026), most of them in Fresno County (3,727), Kern County (814) and Madera County (391). CSLB lists license 716208 (QUALITY HOME SERVICES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-36, expires Dec 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 5,735
- Last 24 months
- 307
- Total capacity
- 47,983.8 kW DC
- Median system size
- 7.8 kW DC
- With battery storage
- 10.1% all time; 82.4% last 24 months
- Third-party owned
- 13.9% of 5,735 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 442 installs, latest Aug 27, 2026
- Ownership types recorded
- PPA 361, lease 424, prepaid lease 1, other 13
- Median battery size
- 13.5 kWh (297 installs list a capacity)
- First install
- Mar 1, 2011
- Latest install
- Aug 28, 2026
- Counties
- 20
- Utilities
- PGE 5,253, SCE 482
- CSLB license
- 716208
Is Quality Home Services still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (117 in all).
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2011 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2011 | 13 | 0 |
| 2012 | 9 | 0 |
| 2013 | 6 | 0 |
| 2014 | 4 | 0 |
| 2015 | 153 | 0 |
| 2016 | 458 | 0 |
| 2017 | 478 | 0 |
| 2018 | 521 | 0 |
| 2019 | 519 | 1 |
| 2020 | 576 | 13 |
| 2021 | 629 | 24 |
| 2022 | 751 | 47 |
| 2023 | 1,100 | 73 |
| 2024 | 284 | 234 |
| 2025 | 189 | 148 |
| 2026 (through Aug 31, 2026) | 45 | 37 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
442 of its 5,735 interconnected installs (7.7% of the 5,735 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 704 | 12.3% | not counted |
| NEM 2.0 | 4,589 | 80.0% | 158 (3.4%) |
| Net Billing Tariff | 442 | 7.7% | 404 (91.4%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 799 of Quality Home Services’s installs the utility recorded a third-party ownership type: PPA 361, lease 424, prepaid lease 1, other 13. Across all installers, 14 residential systems list a third-party owner name that matches Quality Home Services exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Sunpower | 329 |
| SunPower Capital LLC | 282 |
| BAKER | 67 |
| Sunpower Financing | 32 |
| Baker Energy Services | 20 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 275 of Quality Home Services’ 307 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (125, 45.5%) used modules recorded as Qcells.
In the last 24 months, 307 of Quality Home Services’ 307 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (217, 70.7%) used inverters recorded as Tesla.
In the last 24 months, 200 of Quality Home Services’ 307 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (168, 84.0%) used batteries recorded as Tesla.
479 of 577 battery-paired PG&E and SCE installs (83.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 125 | 154 |
| SunPower | 110 | 4,547 | |
| JA Solar | 58 | not in top list | |
| SolarWorld | 7 | not in top list | |
| Waaree | 6 | 413 | |
| Inverter maker | Tesla | 217 | 281 |
| Enphase | 86 | 827 | |
| SunPower | 63 | 4,304 | |
| SMA | 12 | 466 | |
| Fronius | 5 | not in top list | |
| Battery maker | Tesla | 168 | 219 |
| Enphase | 28 | 31 | |
| FranklinWH | 2 | 2 | |
| SunPower | 2 | 230 | |
| LG | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,279 of 5,735 installs, inverters on 5,735. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Quality Home Services as developer on 36 battery storage projects and as installer on 36 (36 name it as both), 36 projects in all with 908 kWh of storage. 18 have the status Paid, with $98,400 in current incentive allocations. Applications were received from Oct 2, 2019 to Aug 5, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 18 | 462 | $98,400 |
| Cancelled | 16 | 423 | $131,746 |
| RRF Rejected | 2 | 23 | $3,433 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 17 | 259 | $43,794 | 11 | $30,540 |
| Large-Scale Storage | 14 | 551 | $133,258 | 7 | $67,860 |
| Equity Resiliency | 3 | 76 | $53,095 | 0 | $0 |
| Not stated | 2 | 23 | $3,433 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 716208 | QUALITY HOME SERVICES (Corporation) | CLEAR | C-10 Electrical Contractor; C-36 | Dec 11, 1995 | Dec 31, 2027 | 5,681 |
License numbers are the ones the utilities recorded on the interconnection applications (5,687 of 5,735 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 716208. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- B&D Quality Water, Inc. DBA:Quality Home: 429 installs, license 716208
Counties
| County | Installs |
|---|---|
| Fresno | 3,727 |
| Kern | 814 |
| Madera | 391 |
| Tulare | 317 |
| Merced | 230 |
| Kings | 186 |
| Mariposa | 27 |
| Monterey | 10 |
| Tuolumne | 6 |
| Santa Clara | 5 |
| San Luis Obispo | 4 |
| Los Angeles | 3 |
| San Benito | 3 |
| San Joaquin | 3 |
| Stanislaus | 3 |
| San Bernardino | 2 |
| Calaveras | 1 |
| Inyo | 1 |
| Santa Cruz | 1 |
| Ventura | 1 |
Top cities
| City | Installs |
|---|---|
| Fresno | 2,141 |
| Clovis | 1,016 |
| Bakersfield | 636 |
| Madera | 212 |
| Sanger | 150 |
| Visalia | 138 |
| Lemoore | 95 |
| Los Banos | 86 |
| Merced | 76 |
| Hanford | 72 |
| Selma | 67 |
| Reedley | 65 |
| Chowchilla | 59 |
| Tulare | 58 |
| Kingsburg | 54 |
Names as recorded by the utilities
The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| QUALITY HOMES SERVICES | 3,434 |
| quality home services | 954 |
| Quality Home Services | 699 |
| Quality Homes Services | 353 |
| QUALITY HOME SERVICES | 272 |
| Quality Home Services, Inc | 18 |
| Quality home Services | 1 |
| Quality Home Services , Inc | 1 |
| Quality Home Services Inc. | 1 |
| QUALITY HOME SERVICES, INC | 1 |
| Quality Home Services, Inc. | 1 |
Common questions
Where does Quality Home Services install solar?
Its installs are spread across 20 counties. The most are in Fresno County (3,727 installs), followed by Kern County (814).
How often does Quality Home Services install batteries with solar?
10.1% of its interconnected solar installs include battery storage across all years, and 82.4% in the last 24 months (253 of 307).
How many Quality Home Services installs are under NEM 3.0 (the Net Billing Tariff)?
442 of its 5,735 interconnected installs (7.7% of the 5,735 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.