NOVA WEST ENERGY SOLUTIONS INC

How many solar installs has NOVA WEST ENERGY SOLUTIONS INC done in California, and which license number is on its installs?

NOVA WEST ENERGY SOLUTIONS INC has 104 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Mar 5, 2024 to Aug 24, 2026), most of them in Fresno County (82), Madera County (11) and Tulare County (6). CSLB lists license 1111413 (NOVA WEST ENERGY SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
104
Last 24 months
93
Total capacity
968.5 kW DC
Median system size
8.9 kW DC
With battery storage
96.2% all time; 96.8% last 24 months
Third-party owned
1.0% of 104 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
91 installs, latest Aug 24, 2026
Ownership types recorded
PPA 1
Median battery size
14 kWh (14 installs list a capacity)
First install
Mar 5, 2024
Latest install
Aug 24, 2026
Counties
5
Utilities
PGE 99, SCE 5
CSLB license
1111413

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20242625
20254542
2026 (through Aug 31, 2026)3333

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

91 of its 104 interconnected installs (87.5% of the 104 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.032.9%not counted
NEM 2.0109.6%8 (80.0%)
Net Billing Tariff9187.5%89 (97.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of NOVA WEST ENERGY SOLUTIONS INC’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches NOVA WEST ENERGY SOLUTIONS INC exactly.

Third-party owner named on its installsInstalls
Lightreach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 90 of NOVA WEST ENERGY SOLUTIONS INC’s 93 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (44, 48.9%) used modules recorded as Panasonic.

In the last 24 months, 93 of NOVA WEST ENERGY SOLUTIONS INC’s 93 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (59, 63.4%) used inverters recorded as Enphase.

In the last 24 months, 75 of NOVA WEST ENERGY SOLUTIONS INC’s 93 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (51, 68.0%) used batteries recorded as Enphase.

85 of 100 battery-paired PG&E and SCE installs (85.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic4455
REC2121
Hyundai2020
Qcells33
Mission Solar22
Inverter makerEnphase5970
Panasonic1313
PointGuard Energy Inc.1313
Tesla99
SolarEdge55
Battery makerEnphase5161
PointGuard Energy Inc.1313
Tesla88
SolarEdge33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 101 of 104 installs, inverters on 104. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names NOVA WEST ENERGY SOLUTIONS INC as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 38 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Apr 29, 2024 to Nov 1, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled119$4,759
RRF Rejected119$2,912

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage119$4,7590$0
Not stated119$2,9120$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1111413NOVA WEST ENERGY SOLUTIONS INC (Corporation)CLEARC-10 Electrical ContractorOct 17, 2023Nov 30, 2027104

License numbers are the ones the utilities recorded on the interconnection applications (104 of 104 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1111413. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno82
Madera11
Tulare6
Merced4
Kings1

Top cities

CityInstalls
Fresno46
Clovis26
Madera6
Visalia4
Coarsegold3
Merced3
Sanger3
Auberry2
Ahwahnee1
Coalinga1
Dinuba1
Friant1
Lemoore1
Oakhurst1
Porterville1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NOVA WEST ENERGY SOLUTIONS INC103
Nova West Energy Solutions1

Common questions

Where does NOVA WEST ENERGY SOLUTIONS INC install solar?

Its installs are spread across 5 counties. The most are in Fresno County (82 installs), followed by Madera County (11).

How often does NOVA WEST ENERGY SOLUTIONS INC install batteries with solar?

96.2% of its interconnected solar installs include battery storage across all years, and 96.8% in the last 24 months (90 of 93).

How many NOVA WEST ENERGY SOLUTIONS INC installs are under NEM 3.0 (the Net Billing Tariff)?

91 of its 104 interconnected installs (87.5% of the 104 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.