RADIUS ENERGY

How many solar installs has RADIUS ENERGY done in California, and which license number is on its installs?

RADIUS ENERGY has 43 residential solar installs interconnected in California, active in the records from 2014 through 2026 (May 8, 2014 to Jun 15, 2026), most of them in Stanislaus County (10), Merced County (9) and San Joaquin County (8). CSLB lists license 777720 (RADIUS ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
43
Last 24 months
42
Total capacity
273.6 kW DC
Median system size
5.3 kW DC
With battery storage
61.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 61.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
40 installs, latest Jun 15, 2026
Ownership types recorded
none recorded
Median battery size
1 kWh (9 installs list a capacity)
First install
May 8, 2014
Latest install
Jun 15, 2026
Counties
12
Utilities
PGE 42, SDGE 1
CSLB license
777720

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
2025105
2026 (through Aug 31, 2026)3221

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

40 of its 43 interconnected installs (93.0% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 65.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.3%not counted
NEM 2.024.7%0 (0.0%)
Net Billing Tariff4093.0%26 (65.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on RADIUS ENERGY’s installs. No residential system in the file lists a third-party owner name that matches RADIUS ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 42 of RADIUS ENERGY’s 42 installs name a module maker in the “Generator Manufacturer” fields, and most of those (28, 66.7%) used modules recorded as SunPower.

In the last 24 months, 42 of RADIUS ENERGY’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (21, 50.0%) used inverters recorded as SunPower.

In the last 24 months, 25 of RADIUS ENERGY’s 42 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (16, 64.0%) used batteries recorded as FranklinWH.

25 of 26 battery-paired PG&E and SCE installs (96.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower2828
Aptos Solar77
Qcells44
CertainTeed33
Tigo Energy, Inc1not in top list
Inverter makerSunPower2121
FranklinWH1616
Tigo Energy, Inc1212
Tesla99
Battery makerFranklinWH1616
Tesla99

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 43 installs, inverters on 43. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names RADIUS ENERGY as developer on 16 battery storage projects and as installer on 14 (14 name it as both), 16 projects in all with 230 kWh of storage. 14 have the status Paid, with $65,160 in current incentive allocations. Applications were received from Oct 25, 2024 to Jun 1, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid14203$65,160
Cancelled227$4,080

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage13190$28,44011$24,360
Equity Resiliency341$40,8003$40,800

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
777720RADIUS ENERGY (Corporation)CLEARB General Building ContractorApr 20, 2000Apr 30, 202842

License numbers are the ones the utilities recorded on the interconnection applications (42 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 777720. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Stanislaus10
Merced9
San Joaquin8
Tuolumne7
Amador2
Alameda1
Calaveras1
Contra Costa1
Madera1
Mariposa1
San Diego1
Yuba1

Top cities

CityInstalls
Oakdale9
Atwater3
Manteca3
Sonora3
La Grange2
Merced2
Planada2
Stockton2
Tracy2
Amador City1
Clayton1
Fremont1
Jackson1
Los Banos1
Madera1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RADIUS ENERGY42
Radius Energy1

Common questions

Where does RADIUS ENERGY install solar?

Its installs are spread across 12 counties. The most are in Stanislaus County (10 installs), followed by Merced County (9).

How often does RADIUS ENERGY install batteries with solar?

61.9% of its interconnected solar installs include battery storage across all years, and 61.9% in the last 24 months (26 of 42). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many RADIUS ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

40 of its 43 interconnected installs (93.0% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 65.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.