Gold Electric, Inc.

How many solar installs has Gold Electric, Inc. done in California, and which license number is on its installs?

Gold Electric, Inc. has 305 residential solar installs interconnected in California, active in the records from 2011 through 2025 (Feb 4, 2011 to Nov 24, 2025), most of them in Calaveras County (226), Tuolumne County (32) and San Joaquin County (22). CSLB lists license 554744 (GOLD ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
305
Last 24 months
16
Total capacity
2,231.2 kW DC
Median system size
6.3 kW DC
With battery storage
5.9% all time; 43.8% last 24 months
Third-party owned
0.0% of 305 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
16 installs, latest Oct 28, 2025
Ownership types recorded
none recorded
Median battery size
20.7 kWh (2 installs list a capacity)
First install
Feb 4, 2011
Latest install
Nov 24, 2025
Counties
10
Utilities
PGE 305
CSLB license
554744

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201190
2012130
2013180
2014320
2015400
2016190
2017180
2018210
2019240
2020110
2021202
2022142
2023354
2024226
202594
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

16 of its 305 interconnected installs (5.2% of the 305 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 43.8% of those include battery storage. The latest Net Billing Tariff install was approved Oct 28, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.013443.9%not counted
NEM 2.015550.8%10 (6.5%)
Net Billing Tariff165.2%7 (43.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Gold Electric, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Gold Electric, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of Gold Electric, Inc.’s 16 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (7, 46.7%) used modules recorded as Qcells.

In the last 24 months, 16 of Gold Electric, Inc.’s 16 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (14, 87.5%) used inverters recorded as Enphase.

In the last 24 months, 5 of Gold Electric, Inc.’s 16 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Enphase.

14 of 18 battery-paired PG&E and SCE installs (77.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells730
Canadian Solar638
Mission Solar1not in top list
TSMC Solar1not in top list
Inverter makerEnphase14260
SMA123
Sol-Ark1not in top list
SolarEdge120
Tesla1not in top list
Battery makerEnphase514

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 290 of 305 installs, inverters on 305. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
554744GOLD ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorJan 20, 1989Apr 30, 2028249

License numbers are the ones the utilities recorded on the interconnection applications (251 of 305 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 554744. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Calaveras226
Tuolumne32
San Joaquin22
Amador13
Stanislaus5
Contra Costa2
Placer2
Mariposa1
Napa1
San Luis Obispo1

Top cities

CityInstalls
Murphys76
Angels Camp54
Copperopolis28
Sonora17
San Andreas13
Arnold10
Valley Springs9
Avery8
Vallecito8
Stockton6
Acampo5
Burson5
Jamestown5
Lodi5
Hathaway Pines4

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GOLD ELECTRIC INC115
Gold Electric, Inc.66
Gold Electric Inc.59
Gold Electric Inc48
Gold Electric INC6
Gold Electric4
Gold Electric dba Solar Universe2
GOLD ELECTRIC, INC.2
Gold electric1
Gold Electric Co.1
gold electric inc1

Common questions

Where does Gold Electric, Inc. install solar?

Its installs are spread across 10 counties. The most are in Calaveras County (226 installs), followed by Tuolumne County (32).

How often does Gold Electric, Inc. install batteries with solar?

5.9% of its interconnected solar installs include battery storage across all years, and 43.8% in the last 24 months (7 of 16).

How many Gold Electric, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

16 of its 305 interconnected installs (5.2% of the 305 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 43.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.