PEAK ENERGY GROUP
How many solar installs has PEAK ENERGY GROUP done in California, and which license number is on its installs?
PEAK ENERGY GROUP has 316 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Oct 17, 2025 to Aug 31, 2026), most of them in Riverside County (52), Los Angeles County (27) and Orange County (27). CSLB lists license 1140196 (PEAK ENERGY GROUP) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jul 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 316
- Last 24 months
- 316
- Total capacity
- 2,452.7 kW DC
- Median system size
- 6.6 kW DC
- With battery storage
- 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 96.8% of 316 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 315 installs, latest Aug 31, 2026
- Ownership types recorded
- PPA 306
- Median battery size
- 14 kWh (256 installs list a capacity)
- First install
- Oct 17, 2025
- Latest install
- Aug 31, 2026
- Counties
- 36
- Utilities
- PGE 157, SCE 128, SDGE 31
- CSLB license
- 1140196
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2025 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2025 | 7 | 6 |
| 2026 (through Aug 31, 2026) | 309 | 279 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
315 of its 316 interconnected installs (99.7% of the 316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 1 | 0.3% | not recorded |
| Net Billing Tariff | 315 | 99.7% | 285 (100.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 306 of PEAK ENERGY GROUP’s installs the utility recorded a third-party ownership type: PPA 306, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches PEAK ENERGY GROUP exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Sunrun Inc. | 212 |
| Goodleap | 80 |
| EnFin | 6 |
| Peak Energy Ops | 3 |
| Good Leap | 2 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 315 of PEAK ENERGY GROUP’s 316 installs name a module maker in the “Generator Manufacturer” fields, and most of those (216, 68.6%) used modules recorded as REC.
In the last 24 months, 316 of PEAK ENERGY GROUP’s 316 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (302, 95.6%) used inverters recorded as Tesla.
In the last 24 months, 262 of PEAK ENERGY GROUP’s 316 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (250, 95.4%) used batteries recorded as Tesla.
262 of 285 battery-paired PG&E and SCE installs (91.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 216 | 216 |
| Qcells | 90 | 90 | |
| Hyundai | 7 | 7 | |
| Canadian Solar | 2 | 2 | |
| HDHYUNDAIENERGYSOLUTIONSCO.,LTD. | 2 | 2 | |
| Inverter maker | Tesla | 302 | 302 |
| Enphase | 16 | 16 | |
| SolarEdge | 4 | 4 | |
| ABB | 1 | 1 | |
| Power-One | 1 | 1 | |
| Battery maker | Tesla | 250 | 250 |
| Enphase | 12 | 12 | |
| LG | 1 | 1 | |
| SolarEdge | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 315 of 316 installs, inverters on 316. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1140196 | PEAK ENERGY GROUP (Limited Liability) | CLEAR | C-10 Electrical Contractor; C-46 Solar Contractor | Jul 10, 2025 | Jul 31, 2027 | 316 |
License numbers are the ones the utilities recorded on the interconnection applications (316 of 316 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1140196. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list PEAK ENERGY GROUP’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2026 | Total |
|---|---|---|---|
| City and County of San Francisco | 1140196 | 1 | 1 |
| unincorporated San Diego County | 1140196 | 39 | 39 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
Top cities
| City | Installs |
|---|---|
| Grass Valley | 12 |
| Hemet | 10 |
| Concord | 9 |
| Moreno Valley | 9 |
| San Diego | 9 |
| California City | 8 |
| Oakland | 8 |
| Lancaster | 7 |
| Atascadero | 6 |
| Gerber | 6 |
| Placerville | 6 |
| Long Beach | 5 |
| Ramona | 5 |
| Riverside | 5 |
| Santa Maria | 5 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| PEAK ENERGY GROUP | 316 |
Common questions
Where does PEAK ENERGY GROUP install solar?
Its installs are spread across 36 counties. The most are in Riverside County (52 installs), followed by Los Angeles County (27).
How often does PEAK ENERGY GROUP install batteries with solar?
100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (285 of 285). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many PEAK ENERGY GROUP installs are under NEM 3.0 (the Net Billing Tariff)?
315 of its 316 interconnected installs (99.7% of the 316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.