PEAK ENERGY GROUP

How many solar installs has PEAK ENERGY GROUP done in California, and which license number is on its installs?

PEAK ENERGY GROUP has 316 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Oct 17, 2025 to Aug 31, 2026), most of them in Riverside County (52), Los Angeles County (27) and Orange County (27). CSLB lists license 1140196 (PEAK ENERGY GROUP) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
316
Last 24 months
316
Total capacity
2,452.7 kW DC
Median system size
6.6 kW DC
With battery storage
100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
96.8% of 316 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
315 installs, latest Aug 31, 2026
Ownership types recorded
PPA 306
Median battery size
14 kWh (256 installs list a capacity)
First install
Oct 17, 2025
Latest install
Aug 31, 2026
Counties
36
Utilities
PGE 157, SCE 128, SDGE 31
CSLB license
1140196

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
202576
2026 (through Aug 31, 2026)309279

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

315 of its 316 interconnected installs (99.7% of the 316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.010.3%not recorded
Net Billing Tariff31599.7%285 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 306 of PEAK ENERGY GROUP’s installs the utility recorded a third-party ownership type: PPA 306, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches PEAK ENERGY GROUP exactly.

Third-party owner named on its installsInstalls
Sunrun Inc.212
Goodleap80
EnFin6
Peak Energy Ops3
Good Leap2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 315 of PEAK ENERGY GROUP’s 316 installs name a module maker in the “Generator Manufacturer” fields, and most of those (216, 68.6%) used modules recorded as REC.

In the last 24 months, 316 of PEAK ENERGY GROUP’s 316 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (302, 95.6%) used inverters recorded as Tesla.

In the last 24 months, 262 of PEAK ENERGY GROUP’s 316 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (250, 95.4%) used batteries recorded as Tesla.

262 of 285 battery-paired PG&E and SCE installs (91.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC216216
Qcells9090
Hyundai77
Canadian Solar22
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.22
Inverter makerTesla302302
Enphase1616
SolarEdge44
ABB11
Power-One11
Battery makerTesla250250
Enphase1212
LG11
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 315 of 316 installs, inverters on 316. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1140196PEAK ENERGY GROUP (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJul 10, 2025Jul 31, 2027316

License numbers are the ones the utilities recorded on the interconnection applications (316 of 316 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1140196. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PEAK ENERGY GROUP’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2026Total
City and County of San Francisco114019611
unincorporated San Diego County11401963939

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside52
Los Angeles27
Orange27
Contra Costa25
San Diego24
Nevada15
Alameda14
Kern14
San Luis Obispo14
San Bernardino11
El Dorado10
Tehama10
Kings7
Santa Clara6
Santa Barbara5
Santa Cruz5
Shasta5
Sonoma5
Yuba5
Madera4
Placer4
San Joaquin4
Merced3
Tuolumne3
Ventura3
Butte2
San Mateo2
Solano2
Calaveras1
Colusa1
Fresno1
Lake1
Marin1
Mariposa1
San Francisco1
Yolo1

Top cities

CityInstalls
Grass Valley12
Hemet10
Concord9
Moreno Valley9
San Diego9
California City8
Oakland8
Lancaster7
Atascadero6
Gerber6
Placerville6
Long Beach5
Ramona5
Riverside5
Santa Maria5

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PEAK ENERGY GROUP316

Common questions

Where does PEAK ENERGY GROUP install solar?

Its installs are spread across 36 counties. The most are in Riverside County (52 installs), followed by Los Angeles County (27).

How often does PEAK ENERGY GROUP install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (285 of 285). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many PEAK ENERGY GROUP installs are under NEM 3.0 (the Net Billing Tariff)?

315 of its 316 interconnected installs (99.7% of the 316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.