Solar installers in Santa Maria, California
Most installs here are in Santa Barbara County.
Who installs the most solar in Santa Maria?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Santa Maria are Sunrun (523), BRIGHT OPS (130) and Tesla Energy Operations (formerly SolarCity) (33). They account for 686 of the 920 residential solar installs interconnected there in that window.
In all, 6,404 homes in Santa Maria have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 63 installers with installs in this window. 12 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 523 | 2,415 |
| 2 | BRIGHT OPS | 130 | 136 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 33 | 1,306 |
| 4 | Complete Solar | 28 | 44 |
| 5 | American Solar | 18 | 19 |
| 6 | Photon Brothers | 15 | 64 |
| 7 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 11 | 43 |
| 8 | FREEDOM FOREVER LLC | 10 | 35 |
| 9 | SunPower | 10 | 39 |
| 10 | ILUM ENERGY SOLUTIONS | 8 | 24 |
| 11 | PLANET OATH ENERGY INC | 8 | 15 |
| 12 | BETTER EARTH ELECTRIC INC | 6 | 29 |
| 13 | Empower Electric Solar | 6 | 6 |
| 14 | PORTICADE ENERGY LLC | 6 | 6 |
| 15 | Solarponics, Inc. | 6 | 72 |
| 16 | AXIOM 360 LLC | 5 | 24 |
| 17 | Clean Energy Solutions | 5 | 24 |
| 18 | PEAK ENERGY GROUP | 5 | 5 |
| 19 | POWUR HOME CONSTRUCTION | 5 | 5 |
| 20 | A.M. Sun Solar | 4 | 132 |
| 21 | AXIA SOLAR CORP | 4 | 4 |
| 22 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 4 | 4 |
| 23 | Bland Solar & Air | 3 | 13 |
| 24 | DISCOUNT CONSTRUCTION & ENGINEERING | 3 | 3 |
| 25 | LYTEGEN | 3 | 3 |
Most installs, all time
| 1 | Sunrun | 2,415 | 2,415 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 1,306 | 1,306 |
| 3 | Vivint Solar Developer, LLC | 358 | 358 |
| 4 | Planet Solar Inc. | 168 | 168 |
| 5 | SOLGEN ELECTRIC | 164 | 164 |
| 6 | BRIGHT OPS | 136 | 136 |
| 7 | A.M. Sun Solar | 132 | 132 |
| 8 | KUUBIX GLOBAL LLC | 113 | 113 |
| 9 | Bright Planet Solar | 73 | 73 |
| 10 | Solarponics, Inc. | 72 | 72 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 987 | 75 |
| 2023 | 740 | 148 |
| 2024 | 542 | 439 |
| 2025 | 457 | 400 |
| 2026 (through Aug 31, 2026) | 293 | 274 |
Under the Net Billing Tariff (NEM 3.0)
1,260 of the 6,404 residential solar installs in Santa Maria (19.7% of the 6,404 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.4% of those include battery storage. The latest was approved Aug 26, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Santa Maria
| 1 | Sunrun | 831 | 828 | 99.6% |
| 2 | BRIGHT OPS | 135 | 134 | 99.3% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 47 | 38 | 80.9% |
| 4 | American Solar | 19 | 9 | 47.4% |
| 5 | Photon Brothers | 16 | 16 | 100.0% |
| 6 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 15 | 12 | 80.0% |
| 7 | PLANET OATH ENERGY INC | 12 | 11 | 91.7% |
| 8 | FREEDOM FOREVER LLC | 11 | 10 | 90.9% |
| 9 | RADIX SOLAR | 11 | 9 | 81.8% |
| 10 | AXIOM 360 LLC | 9 | 9 | 100.0% |
| 11 | Clean Energy Solutions | 9 | 9 | 100.0% |
| 12 | BETTER EARTH ELECTRIC INC | 7 | 6 | 85.7% |
| 13 | ILUM ENERGY SOLUTIONS | 7 | 6 | 85.7% |
| 14 | ELECTRIQ MICROGRID SERVICES LLC | 6 | 6 | 100.0% |
| 15 | Ilum Solar | 6 | 6 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 885 of Santa Maria’s 920 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (257, 29.0%) used modules recorded as Qcells.
In the last 24 months, 920 of Santa Maria’s 920 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (622, 67.6%) used inverters recorded as Tesla.
In the last 24 months, 664 of Santa Maria’s 920 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (475, 71.5%) used batteries recorded as Tesla.
1,210 of 1,436 battery-paired PG&E and SCE installs (84.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 257 | 937 |
| JA Solar | 201 | 782 | |
| LONGi | 178 | 878 | |
| Elin Energy | 111 | not in top list | |
| Silfab | 35 | not in top list | |
| Inverter maker | Tesla | 622 | 1,069 |
| SolarEdge | 220 | 2,547 | |
| Enphase | 124 | 1,232 | |
| Lunar Energy | 32 | not in top list | |
| Delta Electronics | 27 | 171 | |
| Battery maker | Tesla | 475 | 815 |
| SolarEdge | 105 | 176 | |
| Enphase | 34 | 69 | |
| Lunar Energy | 32 | 32 | |
| FranklinWH | 11 | 11 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 6,119 of 6,404 installs, inverters on 6,404. See the methodology and the equipment index.
ZIP codes in Santa Maria
ZIP codes with their own page where the utilities recorded Santa Maria on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Santa Maria
The SGIP report lists 110 battery storage projects with the city Santa Maria, 50 with the status Paid ($966,035 in current incentive allocations, 2,496 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 50 | 2,496 | $966,035 |
| PBI in Process | 1 | 234 | $44,186 |
| Reserved | 12 | 4,680 | $2,119,249 |
| Cancelled | 42 | 10,400 | $5,340,315 |
| RRF Rejected | 5 | 642 | $308,324 |
Installers named on the most SGIP storage projects in Santa Maria
| Installer | Projects | Paid |
|---|---|---|
| Sunrun | 28 | 17 |
| Photon Brothers | 18 | 11 |
| A.M. Sun Solar | 8 | 3 |
| AM SUN SOLAR | 6 | 3 |
| Solarponics, Inc. | 6 | 5 |
| Vivint Solar Developer, LLC | 5 | 1 |
| ELECTRIQ MICROGRID SERVICES LLC | 2 | 0 |
| Infinity Energy, Inc | 2 | 2 |
| Kuubix Energy Inc. | 2 | 0 |
| KUUBIX GLOBAL LLC | 2 | 0 |
24 of the 110 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Santa Maria is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 6,404
- Last 24 months
- 920
- Capacity
- 29 MW DC
- Median system size
- 3.9 kW DC
- With battery storage
- 22.4% all time; 89.5% last 24 months
- Third-party owned
- 47.0% where reported
- Ownership types recorded
- PPA 2,713, lease 273, prepaid lease 15, other 8
- Median battery size
- 13.5 kWh
- Earliest install in data
- Aug 22, 2001
Common questions
How many homes in Santa Maria have solar?
6,404 residential solar systems in Santa Maria were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 920 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Santa Maria?
63 installer names have at least one install interconnected in Santa Maria in the last 24 months, and 258 appear in the full record.
How common are batteries with new solar in Santa Maria?
22.4% of the solar installs interconnected in Santa Maria include battery storage across all years, and 89.5% in the last 24 months (823 of 920).
How many solar installs in Santa Maria are under NEM 3.0?
1,260 of the 6,404 residential solar installs in Santa Maria (19.7% of the 6,404 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.