Bland Solar & Air

How many solar installs has Bland Solar & Air done in California, and which license number is on its installs?

Bland Solar & Air has 4,984 residential solar installs interconnected in California, active in the records from 2007 through 2026 (Aug 1, 2007 to May 26, 2026), most of them in Kern County (4,159), Fresno County (340) and San Luis Obispo County (273). The license number recorded on most of its installs, 598565, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
4,984
Last 24 months
84
Total capacity
41,112 kW DC
Median system size
7.8 kW DC
With battery storage
2.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 71.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.3% of 4,963 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
116 installs, latest Sep 19, 2025
Ownership types recorded
PPA 69, lease 23, other 24
Median battery size
15 kWh (13 installs list a capacity)
First install
Aug 1, 2007
Latest install
May 26, 2026
Counties
24
Utilities
PGE 4,745, SCE 237, SDGE 2
CSLB license
598565

Is Bland Solar & Air still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (5 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200720
200810
2009140
2010450
2011370
2012800
20131700
20142560
20153660
20165610
20173890
20184170
20194760
20204041
20214940
20225434
20235539
202413064
20254334
2026 (through Aug 31, 2026)30

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

116 of its 4,984 interconnected installs (2.3% of the 4,984 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.9% of those include battery storage. The latest Net Billing Tariff install was approved Sep 19, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,55431.2%not counted
NEM 2.03,31466.5%10 (0.3%)
Net Billing Tariff1162.3%102 (87.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 116 of Bland Solar & Air’s installs the utility recorded a third-party ownership type: PPA 69, lease 23, prepaid lease 0, other 24. Across all installers, 6 residential systems list a third-party owner name that matches Bland Solar & Air exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova86
SunRun7
Bland Company6
SunPower Capital LLC5
Energy Loan Network3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 77 of Bland Solar & Air’s 84 installs name a module maker in the “Generator Manufacturer” fields, and most of those (41, 53.2%) used modules recorded as Silfab.

In the last 24 months, 84 of Bland Solar & Air’s 84 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (84, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 58 of Bland Solar & Air’s 84 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (58, 100.0%) used batteries recorded as Enphase.

108 of 112 battery-paired PG&E and SCE installs (96.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab41733
Qcells19277
Boviet Solar Technology6802
LONGi6451
JA Solar2not in top list
Inverter makerEnphase844,446
Fronius1not in top list
Magnetek1not in top list
SunPower1105
Battery makerEnphase58105

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,639 of 4,984 installs, inverters on 4,984. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Bland Solar & Air as developer on 0 battery storage projects and as installer on 10 (0 name it as both), 10 projects in all with 233 kWh of storage. 4 have the status Paid, with $51,939 in current incentive allocations. Applications were received from Sep 2, 2020 to Jul 14, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid475$51,939
Cancelled6158$99,808

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency5115$108,4612$30,278
Small Residential Storage352$9,7061$1,941
Large-Scale Storage140$13,8600$0
Residential Storage Equity126$19,7201$19,720

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
598565Not found in the CSLB License Master file pulled Nov 4, 20264,649

License numbers are the ones the utilities recorded on the interconnection applications (4,664 of 4,984 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Kern4,159
Fresno340
San Luis Obispo273
Tulare55
Madera37
Kings25
Santa Barbara22
Los Angeles14
Merced12
Mariposa10
Ventura9
Orange7
Monterey4
San Benito3
San Bernardino3
Riverside2
Shasta2
Calaveras1
El Dorado1
Placer1
San Joaquin1
San Mateo1
Solano1
Tuolumne1

Top cities

CityInstalls
Bakersfield3,884
Fresno177
Clovis126
Atascadero77
Tehachapi73
Paso Robles72
Shafter48
Taft44
Templeton36
Madera21
San Luis Obispo19
Visalia19
Wasco17
Lemoore16
Cambria14

Names as recorded by the utilities

The utilities recorded this installer under 20 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Bland Solar & Air1,921
BLAND COMPANY1,638
Bland Company635
BLAND SOLAR AND AIR588
Bland Solar & Air, Inc.132
Bland Solar & Air, Inc18
Bland Solar & Air Inc13
BLAND SOLAR & AIR,12
Bland Solar & AIr5
Bland Solar and Air5
Bland Solar & Air,3
Bland Solar and Air, Inc3
Bland Solar & air2
BLAND SOLAR & AIR2
Bland Solar and Air Inc2
Bland Solar & Air inc1
Bland Solar & Air Inc.1
Bland Solar &Air, Inc1
Bland Solar and Air, Inc.1
Bland Solar& Air1

Common questions

Where does Bland Solar & Air install solar?

Its installs are spread across 24 counties. The most are in Kern County (4,159 installs), followed by Fresno County (340).

How often does Bland Solar & Air install batteries with solar?

2.2% of its interconnected solar installs include battery storage across all years, and 71.4% in the last 24 months (60 of 84). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Bland Solar & Air installs are under NEM 3.0 (the Net Billing Tariff)?

116 of its 4,984 interconnected installs (2.3% of the 4,984 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.