Bland Solar & Air: latest installs on record in California
Is Bland Solar & Air still installing solar in California?
The most recent install credited to Bland Solar & Air in California’s interconnection data was approved in May 2026; it has 5 in the last 12 complete months (September 2025 through August 2026). The license number recorded on most of those installs, 598565, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.
- Latest install approved
- May 26, 2026
- Last 12 complete months
- 5 installs, September 2025 through August 2026
- Last 24 months
- 84 installs
- All time
- 4,984 installs, first approved Aug 1, 2007
- License on most recent installs
- 598565, not found in the CSLB License Master file pulled Nov 4, 2026
- Full record
- Bland Solar & Air installer page
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs in each of the last 12 complete months
| Month approved | Installs credited to Bland Solar & Air |
|---|---|
| August 2026 | 0 |
| July 2026 | 0 |
| June 2026 | 0 |
| May 2026 | 1 |
| April 2026 | 1 |
| March 2026 | 1 |
| February 2026 | 0 |
| January 2026 | 0 |
| December 2025 | 0 |
| November 2025 | 0 |
| October 2025 | 1 |
| September 2025 | 1 |
| Total | 5 |
Net Billing Tariff installs
116 of the installs credited to Bland Solar & Air (2.3% of the 4,984 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.9% of those include battery storage. The latest was approved Sep 19, 2025.
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2007 | 2 | 0 |
| 2008 | 1 | 0 |
| 2009 | 14 | 0 |
| 2010 | 45 | 0 |
| 2011 | 37 | 0 |
| 2012 | 80 | 0 |
| 2013 | 170 | 0 |
| 2014 | 256 | 0 |
| 2015 | 366 | 0 |
| 2016 | 561 | 0 |
| 2017 | 389 | 0 |
| 2018 | 417 | 0 |
| 2019 | 476 | 0 |
| 2020 | 404 | 1 |
| 2021 | 494 | 0 |
| 2022 | 543 | 4 |
| 2023 | 553 | 9 |
| 2024 | 130 | 64 |
| 2025 | 43 | 34 |
| 2026 (through Aug 31, 2026) | 3 | 0 |
License numbers on installs in the last 12 months
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Expires | Installs |
|---|---|---|---|---|---|
| 598565 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 5 | |||
Names written on these installs: BLAND COMPANY (5). 5 of the 5 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other installer names in the records
Installer names that share a license number with Bland Solar & Air, or contain the same brand word. A shared word or number does not by itself mean the same company.
| Installer | Why listed | Latest install | Last 12 months | All time |
|---|---|---|---|---|
| BLAND A/C & HEATING INC | same license 598565 | January 2021 | 0 | 63 |
How to read this record
Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.
To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.
Common questions
When was the last install credited to Bland Solar & Air approved?
The latest App Approved date on an install credited to Bland Solar & Air is May 26, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Aug 1, 2007.
How many solar installs has Bland Solar & Air had in California in the last 12 months?
5 residential solar installs credited to Bland Solar & Air were approved for interconnection from September 2025 through August 2026. Months with none recorded: November 2025, December 2025, January 2026, February 2026, June 2026, July 2026 and August 2026. Across all years it has 4,984.
Does a recent install mean Bland Solar & Air is still in business?
No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
Records last pulled Nov 16, 2026. Every entry links to the original public record.