AXIOM 360 LLC has 306 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Nov 16, 2021 to Aug 18, 2026), most of them in San Luis Obispo County (200), Santa Barbara County (75) and Fresno County (5). CSLB lists license 1078551 (AXIOM 360 LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Jul 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 306
- Last 24 months
- 136
- Total capacity
- 2,037.9 kW DC
- Median system size
- 6 kW DC
- With battery storage
- 51.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 88.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 1.0% of 306 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 122 installs, latest Aug 18, 2026
- Ownership types recorded
- PPA 2, lease 1
- Median battery size
- 13.5 kWh (71 installs list a capacity)
- First install
- Nov 16, 2021
- Latest install
- Aug 18, 2026
- Counties
- 14
- Utilities
- PGE 254, SCE 51, SDGE 1
- CSLB license
- 1078551
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2021 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2021 | 1 | 0 |
| 2022 | 14 | 1 |
| 2023 | 123 | 17 |
| 2024 | 52 | 33 |
| 2025 | 86 | 78 |
| 2026 (through Aug 31, 2026) | 30 | 27 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
122 of its 306 interconnected installs (39.9% of the 306 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 18, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 2 | 0.7% | not counted |
| NEM 2.0 | 182 | 59.5% | 40 (22.1%) |
| Net Billing Tariff | 122 | 39.9% | 114 (93.4%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 3 of AXIOM 360 LLC’s installs the utility recorded a third-party ownership type: PPA 2, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches AXIOM 360 LLC exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| EverBright | 2 |
| Concert Finance | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 119 of AXIOM 360 LLC’s 136 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (44, 37.0%) used modules recorded as Qcells.
In the last 24 months, 136 of AXIOM 360 LLC’s 136 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (87, 64.0%) used inverters recorded as Tesla.
In the last 24 months, 98 of AXIOM 360 LLC’s 136 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (74, 75.5%) used batteries recorded as Tesla.
131 of 156 battery-paired PG&E and SCE installs (84.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 44 | 156 |
| JA Solar | 30 | 30 | |
| REC | 24 | 55 | |
| Trina Solar | 10 | 10 | |
| NeoVolta Inc. | 6 | not in top list | |
| Inverter maker | Tesla | 87 | 103 |
| Enphase | 40 | 187 | |
| SolarEdge | 9 | 23 | |
| FranklinWH | 5 | 7 | |
| Fronius | 5 | not in top list | |
| Battery maker | Tesla | 74 | 89 |
| Enphase | 10 | 27 | |
| FranklinWH | 7 | 9 | |
| Kohler Co. | 3 | 3 | |
| NeoVolta Inc. | 2 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 280 of 306 installs, inverters on 306. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names AXIOM 360 LLC as developer on 50 battery storage projects and as installer on 59 (48 name it as both), 61 projects in all with 1,313 kWh of storage. 32 have the status Paid, with $552,816 in current incentive allocations. Applications were received from Dec 29, 2022 to Jul 27, 2026.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 32 | 671 | $552,816 |
| Reserved | 11 | 265 | $233,671 |
| Waitlist | 1 | 15 | $29,999 |
| Cancelled | 16 | 343 | $194,412 |
| RRF Rejected | 1 | 19 | $2,607 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Residential Storage Equity | 25 | 587 | $498,865 | 15 | $295,137 |
| Equity Resiliency | 20 | 476 | $433,244 | 12 | $247,829 |
| Small Residential Storage | 11 | 174 | $25,690 | 5 | $9,850 |
| Large-Scale Storage | 2 | 26 | $6,600 | 0 | $0 |
| Residential Solar and Storage Equity - AB 209 Non-POU | 1 | 15 | $29,999 | 0 | $0 |
| Residential Solar and Storage Equity - Ratepayer | 1 | 15 | $16,500 | 0 | $0 |
| Not stated | 1 | 19 | $2,607 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1078551 | AXIOM 360 LLC (Limited Liability) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar Contractor | Jul 22, 2021 | Jul 31, 2027 | 306 |
License numbers are the ones the utilities recorded on the interconnection applications (306 of 306 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1078551. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| San Luis Obispo | 200 |
| Santa Barbara | 75 |
| Fresno | 5 |
| Ventura | 5 |
| Kings | 4 |
| Kern | 3 |
| Tulare | 3 |
| Merced | 2 |
| Monterey | 2 |
| Riverside | 2 |
| San Bernardino | 2 |
| Los Angeles | 1 |
| San Diego | 1 |
| Santa Cruz | 1 |
Top cities
| City | Installs |
|---|---|
| Arroyo Grande | 43 |
| San Luis Obispo | 41 |
| Santa Barbara | 29 |
| Santa Maria | 24 |
| Nipomo | 19 |
| Atascadero | 16 |
| Los Osos | 16 |
| Paso Robles | 14 |
| Pismo Beach | 9 |
| Grover Beach | 8 |
| Santa Ynez | 7 |
| Cambria | 6 |
| Morro Bay | 6 |
| Cayucos | 5 |
| Goleta | 5 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| AXIOM 360 LLC | 305 |
| AXIOM 360 | 1 |
Common questions
Where does AXIOM 360 LLC install solar?
Its installs are spread across 14 counties. The most are in San Luis Obispo County (200 installs), followed by Santa Barbara County (75).
How often does AXIOM 360 LLC install batteries with solar?
51.1% of its interconnected solar installs include battery storage across all years, and 88.9% in the last 24 months (120 of 135). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many AXIOM 360 LLC installs are under NEM 3.0 (the Net Billing Tariff)?
122 of its 306 interconnected installs (39.9% of the 306 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.