Kuubix Energy Inc.

How many solar installs has Kuubix Energy Inc. done in California, and which license number is on its installs?

Kuubix Energy Inc. has 2,316 residential solar installs interconnected in California, active in the records from 2017 through 2025 (Oct 31, 2017 to Jan 7, 2025), most of them in Fresno County (722), Kern County (281) and Tulare County (177). The license number recorded on most of its installs, 1030786, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,316
Last 24 months
1
Total capacity
16,741.9 kW DC
Median system size
6.7 kW DC
With battery storage
5.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
35.8% of 2,316 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
25 installs, latest Jan 7, 2025
Ownership types recorded
PPA 800, lease 26, prepaid lease 1, other 2
Median battery size
13.5 kWh (30 installs list a capacity)
First install
Oct 31, 2017
Latest install
Jan 7, 2025
Counties
42
Utilities
PGE 1,864, SCE 326, SDGE 126
CSLB license
1030786, 1077074

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017170
20181460
20195993
202077860
202167949
2022512
2023459
202400
202510
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

25 of its 2,316 interconnected installs (1.1% of the 2,316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jan 7, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020.1%not counted
NEM 2.02,28998.8%115 (5.3%)
Net Billing Tariff251.1%8 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 829 of Kuubix Energy Inc.’s installs the utility recorded a third-party ownership type: PPA 800, lease 26, prepaid lease 1, other 2. Across all installers, 11 residential systems list a third-party owner name that matches Kuubix Energy Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova619
Vivint89
Sunrun49
Vivint Solar37
KUUBIX ENERGY10

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Kuubix Energy Inc.’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Aptos Solar.

In the last 24 months, 1 of Kuubix Energy Inc.’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, none of Kuubix Energy Inc.’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

101 of 123 battery-paired PG&E and SCE installs (82.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar1not in top list
Inverter makerSolarEdge1911
Battery makerTesla089
SolarEdge06
Enphase03
LG02
Generac01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,050 of 2,316 installs, inverters on 2,316. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Kuubix Energy Inc. as developer on 0 battery storage projects and as installer on 107 (0 name it as both), 107 projects in all with 1,774 kWh of storage. 55 have the status Paid, with $197,534 in current incentive allocations. Applications were received from Nov 12, 2019 to Sep 25, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid55918$197,534
Cancelled42740$154,263
RRF Rejected10116$17,397

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage901,460$225,37751$130,874
Equity Resiliency5119$98,7003$52,800
Large-Scale Storage279$27,7201$13,860
Not stated10116$17,3970$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1030786Not found in the CSLB License Master file pulled Nov 4, 20262,218
1077074Not found in the CSLB License Master file pulled Nov 4, 202694

License numbers are the ones the utilities recorded on the interconnection applications (2,316 of 2,316 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Kuubix Energy Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021Total
City and County of San Francisco103078611013
unincorporated San Diego County10307860814224

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno722
Kern281
Tulare177
Madera131
Merced109
San Diego109
Kings103
Santa Clara92
Contra Costa83
San Joaquin80
Orange39
Riverside37
Alameda35
Los Angeles35
Stanislaus33
Butte28
San Bernardino28
Solano25
Shasta22
San Benito18
Tehama15
Santa Barbara13
Monterey12
San Mateo11
Glenn9
Placer8
Santa Cruz8
Ventura8
Yuba7
Lake6
Napa6
San Luis Obispo6
Sonoma5
Sutter5
El Dorado2
San Francisco2
Calaveras1
Colusa1
Inyo1
Marin1
Mariposa1
Tuolumne1

Top cities

CityInstalls
Fresno430
Bakersfield238
Madera116
Clovis96
Visalia92
San Jose73
Lemoore56
Stockton49
Selma38
Los Banos37
Sanger35
Hanford31
Antioch30
Newman29
Dinuba28

Names as recorded by the utilities

The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
KUUBIX ENERGY INC1,634
Kuubix Energy Inc.374
Kuubix Energy126
Kuubix Energy Inc54
Kuubix Energy, Inc39
kuubix energy inc35
KUUBIX ENERGY27
Kuubix energy inc.20
Kuubix energy inc3
kuubix energy1
Kuubix Energy inc1
Kuubix Energy, inc1
Kuubix Energy, inc.1

Common questions

Where does Kuubix Energy Inc. install solar?

Its installs are spread across 42 counties. The most are in Fresno County (722 installs), followed by Kern County (281).

How often does Kuubix Energy Inc. install batteries with solar?

5.6% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Kuubix Energy Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

25 of its 2,316 interconnected installs (1.1% of the 2,316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.