PLANET OATH ENERGY INC

How many solar installs has PLANET OATH ENERGY INC done in California, and which license number is on its installs?

PLANET OATH ENERGY INC has 248 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jun 7, 2023 to Aug 26, 2026), most of them in Ventura County (35), Monterey County (34) and Santa Barbara County (25). CSLB lists license 1100118 (PLANET OATH ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
248
Last 24 months
133
Total capacity
1,632.8 kW DC
Median system size
6 kW DC
With battery storage
73.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 81.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 248 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
218 installs, latest Aug 26, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (62 installs list a capacity)
First install
Jun 7, 2023
Latest install
Aug 26, 2026
Counties
26
Utilities
PGE 188, SCE 59, SDGE 1
CSLB license
1100118

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
20234110
202411399
20256450
2026 (through Aug 31, 2026)3023

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

218 of its 248 interconnected installs (87.9% of the 248 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020.8%not counted
NEM 2.02811.3%3 (10.7%)
Net Billing Tariff21887.9%178 (82.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PLANET OATH ENERGY INC’s installs. No residential system in the file lists a third-party owner name that matches PLANET OATH ENERGY INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 130 of PLANET OATH ENERGY INC’s 133 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (47, 36.2%) used modules recorded as Qcells.

In the last 24 months, 133 of PLANET OATH ENERGY INC’s 133 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (107, 80.5%) used inverters recorded as Enphase.

In the last 24 months, 102 of PLANET OATH ENERGY INC’s 133 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (40, 39.2%) used batteries recorded as Enphase.

175 of 182 battery-paired PG&E and SCE installs (96.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4765
LONGi3535
Waaree2362
JA Solar9not in top list
Mission Solar829
Inverter makerEnphase107221
Tesla2929
FranklinWH1423
SunPower1141
ABB22
Battery makerEnphase4068
Tesla3030
FranklinWH2029
SunPower1249

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 243 of 248 installs, inverters on 248. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PLANET OATH ENERGY INC as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 13 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jan 13, 2026 to Jan 13, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled113$19,103

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU113$19,1030$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1100118PLANET OATH ENERGY INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorDec 30, 2022Dec 31, 2026248

License numbers are the ones the utilities recorded on the interconnection applications (248 of 248 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1100118. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PLANET OATH ENERGY INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20232025Total
City and County of San Francisco1100118101
unincorporated San Diego County1100118011

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Ventura35
Monterey34
Santa Barbara25
Merced21
Kern19
San Luis Obispo16
Contra Costa13
Kings11
Stanislaus9
San Mateo7
Santa Cruz7
Fresno6
San Benito6
San Joaquin6
Santa Clara6
Los Angeles4
Solano4
Madera3
Napa3
Orange3
Tulare3
Mariposa2
Riverside2
Calaveras1
San Bernardino1
Sonoma1

Top cities

CityInstalls
Oxnard17
Salinas17
Santa Maria15
Avenal9
Merced9
Nipomo8
Watsonville7
Atwater6
Bakersfield6
Greenfield6
Newman6
Ventura6
Delano5
Fresno5
Camarillo4

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PLANET OATH ENERGY INC248

Common questions

Where does PLANET OATH ENERGY INC install solar?

Its installs are spread across 26 counties. The most are in Ventura County (35 installs), followed by Monterey County (34).

How often does PLANET OATH ENERGY INC install batteries with solar?

73.7% of its interconnected solar installs include battery storage across all years, and 81.1% in the last 24 months (107 of 132). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many PLANET OATH ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

218 of its 248 interconnected installs (87.9% of the 248 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.