Solar installers in Oxnard, California

Most installs here are in Ventura County.

Who installs the most solar in Oxnard?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Oxnard are Sunrun (225), PORTICADE ENERGY LLC (62) and Tesla Energy Operations (formerly SolarCity) (24). They account for 311 of the 613 residential solar installs interconnected there in that window.

In all, 4,191 homes in Oxnard have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 97 installers with installs in this window. 9 installs in the window were self-installed or had no installer recorded.

1Sunrun225687
2PORTICADE ENERGY LLC6262
3Tesla Energy Operations (formerly SolarCity)24410
4FREEDOM FOREVER LLC21157
5SunPower21180
6ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING15102
7AMECO SOLAR LLC1118
8PLANET OATH ENERGY INC1117
9BRIGHT OPS910
10AXIA SOLAR CORP88
11EXO Energy811
12PACIFICSKY SOLAR LLC813
13SAMEDAY SOLUTIONS88
14DIAMANTE ELECTRIC INC77
15SOUTH WEST BUILDERS720
16ACTION SOLAR66
17BETTER EARTH ELECTRIC INC677
18COASTAL SOLAR516
19NRG Clean Power517
20Powur PBC (Powur Home)522
21SESPE POWER SOLUTIONS510
22Clean Energy Solutions426
23MONA LEE SOLAR CA LLC46
24Paradise Renewables44
25Semper Solaris Construction Inc427

Most installs, all time

1Vivint Solar Developer, LLC697697
2Sunrun687687
3Tesla Energy Operations (formerly SolarCity)410410
4SunPower180180
5Kota Construction LLC168168
6FREEDOM FOREVER LLC157157
7GRID Alternatives126126
8ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING102102
9BETTER EARTH ELECTRIC INC7777
10PORTICADE ENERGY LLC6262

Installs by year

YearInstalls interconnectedWith battery storage
202257460
2023619103
2024332231
2025329298
2026 (through Aug 31, 2026)183164

Under the Net Billing Tariff (NEM 3.0)

777 of the 4,191 residential solar installs in Oxnard (18.5% of the 4,191 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.1% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Oxnard

1Sunrun27627499.3%
2PORTICADE ENERGY LLC6262100.0%
3FREEDOM FOREVER LLC322990.6%
4Tesla Energy Operations (formerly SolarCity)302790.0%
5ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING242083.3%
6BETTER EARTH ELECTRIC INC1919100.0%
7SunPower181477.8%
8PLANET OATH ENERGY INC171376.5%
9Kota Construction LLC141392.9%
10AMECO SOLAR LLC10660.0%
11BRIGHT OPS10880.0%
12Solar Optimum Inc.10990.0%
13SOUTH WEST BUILDERS10770.0%
14AXIA SOLAR CORP88100.0%
15EXO Energy88100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 612 of Oxnard’s 613 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (203, 33.2%) used modules recorded as Qcells.

In the last 24 months, 613 of Oxnard’s 613 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (242, 39.5%) used inverters recorded as Tesla.

In the last 24 months, 536 of Oxnard’s 613 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (298, 55.6%) used batteries recorded as Tesla.

929 of 954 battery-paired PG&E and SCE installs (97.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells203963
JA Solar93267
LONGi83228
JinkoSolar52414
Elin Energy50not in top list
Inverter makerTesla242315
Enphase2191,235
SolarEdge1541,684
Delta Electronics1360
Qcells5not in top list
Battery makerTesla298448
Enphase135194
SolarEdge69129
FranklinWH2233
LG499

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,529 of 4,191 installs, inverters on 4,189. See the methodology and the equipment index.

ZIP codes in Oxnard

ZIP codes with their own page where the utilities recorded Oxnard on at least 10% of the ZIP’s installs, through Aug 31, 2026.

930361,2181,218148
930331,1711,172193
930301,1281,128158
93035673674114

SGIP battery storage projects in Oxnard

The SGIP report lists 179 battery storage projects with the city Oxnard, 81 with the status Paid ($2,927,969 in current incentive allocations, 4,283 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid814,283$2,927,969
PBI in Process31,828$586,677
Reserved228,824$7,082,099
Pending Reservation679$138,905
Waitlist686$136,209
Cancelled548,348$5,076,932
RRF Rejected787$14,149

Installers named on the most SGIP storage projects in Oxnard

InstallerProjectsPaid
Sunrun2414
Semper Solaris Construction Inc1512
Solar Optimum Inc.124
SunPower93
SWELL SERVICES INC DBA SWELL CONTRACTORS96
Vivint Solar Developer, LLC92
LA Solar Group85
Tesla Energy Operations (formerly SolarCity)87
Tesla77
HAVEN ENERGY SERVICES INC60

36 of the 179 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Oxnard is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
4,191
Last 24 months
613
Capacity
22.2 MW DC
Median system size
4.6 kW DC
With battery storage
22.8% all time; 88.7% last 24 months
Third-party owned
47.3% where reported
Ownership types recorded
PPA 1,542, lease 237, prepaid lease 1, other 21
Median battery size
13.5 kWh
Earliest install in data
Dec 12, 2001

Common questions

How many homes in Oxnard have solar?

4,191 residential solar systems in Oxnard were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 613 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Oxnard?

97 installer names have at least one install interconnected in Oxnard in the last 24 months, and 382 appear in the full record.

How common are batteries with new solar in Oxnard?

22.8% of the solar installs interconnected in Oxnard include battery storage across all years, and 88.7% in the last 24 months (544 of 613).

How many solar installs in Oxnard are under NEM 3.0?

777 of the 4,191 residential solar installs in Oxnard (18.5% of the 4,191 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.