Tesla

How many solar installs has Tesla done in California, and which license number is on its installs?

Tesla has 591 residential solar installs interconnected in California, active in the records from 2017 through 2024 (Sep 25, 2017 to Jul 17, 2024), most of them in Alameda County (73), Santa Clara County (62) and Contra Costa County (59). CSLB lists license 888104 (TESLA ENERGY OPERATIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Tesla here carry more than one CSLB license number: 888104 on 570 (CSLB holder TESLA ENERGY OPERATIONS INC, Fremont) and 949283 on 13 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
591
Last 24 months
0
Total capacity
3,689.2 kW DC
Median system size
5.5 kW DC
With battery storage
29.6% all time; no installs in the last 24 months last 24 months
Third-party owned
24.4% of 591 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jul 17, 2024
Ownership types recorded
PPA 60, lease 81, other 3
Median battery size
13.5 kWh (51 installs list a capacity)
First install
Sep 25, 2017
Latest install
Jul 17, 2024
Counties
40
Utilities
PGE 453, SCE 138
CSLB license
888104, 949283

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
20171143
2018391106
20196760
2020175
202100
202200
202311
202410
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 591 interconnected installs (0.2% of the 591 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 17, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0569.5%not counted
NEM 2.053490.4%151 (28.3%)
Net Billing Tariff10.2%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 144 of Tesla’s installs the utility recorded a third-party ownership type: PPA 60, lease 81, prepaid lease 0, other 3. Across all installers, 4,853 residential systems list a third-party owner name that matches Tesla exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Tesla120
Tesla Energy23
Solar City DBA Tesla1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 553 of Tesla’s 591 installs name a module maker in the “Generator Manufacturer” fields, and most of those (327, 59.1%) used modules recorded as SolarCity.

Across all years, 591 of Tesla’s 591 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (255, 43.1%) used inverters recorded as Delta Electronics.

Across all years, 145 of Tesla’s 591 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (145, 100.0%) used batteries recorded as Tesla.

145 of 175 battery-paired PG&E and SCE installs (82.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarCity0327
Trina Solar0184
Qcells021
REC09
Canadian Solar03
Inverter makerDelta Electronics0255
SolarEdge0202
Tesla0125
ABB0117
Power-One07
Battery makerTesla0145

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 553 of 591 installs, inverters on 591. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Tesla as developer on 3,470 battery storage projects and as installer on 1,797 (1,734 name it as both), 3,533 projects in all with 589,364 kWh of storage. 2,733 have the status Paid, with $27,069,340 in current incentive allocations. Applications were received from May 1, 2017 to Dec 28, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2,73376,676$27,069,340
PBI in Process210324,716$260,493,347
Reserved5616,342$12,449,714
Pending Reservation268$15,460
Cancelled503170,581$123,059,975
RRF Rejected29981$258,940

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage2,66152,737$12,869,3382,337$11,501,185
Equity Resiliency660400,297$328,804,397319$10,717,500
Large-Scale Storage11746,636$15,567,06376$4,839,435
Non-Residential Storage Equity6388,672$65,794,5690$0
Residential Solar and Storage Equity - AB 209 Non-POU115$19,8000$0
Residential Solar and Storage Equity - AB 209 POU113$21,4490$0
Residential Storage Equity113$11,2201$11,220
Not stated29981$258,9400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
888104TESLA ENERGY OPERATIONS INC (Corporation)CLEAR, Class Removal PendingB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorDec 7, 2006Dec 31, 2026570
949283Not found in the CSLB License Master file pulled Nov 4, 202613

License numbers are the ones the utilities recorded on the interconnection applications (591 of 591 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending classification removal date of Dec 30, 2026 for license 888104. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list Tesla’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco888104126921341027960403524692
unincorporated San Diego County8881043693224094252672036982522,198
unincorporated Marin County888104617715911000221412

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda73
Santa Clara62
Contra Costa59
Los Angeles43
San Joaquin39
Riverside37
San Bernardino28
Fresno27
San Mateo25
Kern23
Orange16
Solano14
San Luis Obispo13
Marin12
Sonoma12
San Francisco11
Lake10
Merced9
Yolo9
Ventura7
Butte5
Napa5
Tulare5
Calaveras4
Monterey4
Placer4
San Benito4
Santa Cruz4
Amador3
Madera3
Santa Barbara3
Sutter3
Tehama3
Yuba3
El Dorado2
Kings2
Stanislaus2
Glenn1
Nevada1
Shasta1

Top cities

CityInstalls
San Jose34
Bakersfield22
Fremont21
Stockton17
Fresno16
Manteca11
San Francisco11
Oakland10
Antioch9
Danville9
Tracy8
Berkeley7
Clovis7
Dublin7
Pleasanton7

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Tesla573
TESLA INC13
Tesla Inc2
TESLA1
Tesla Inc.1
Tesla, Inc.1

Common questions

Where does Tesla install solar?

Its installs are spread across 40 counties. The most are in Alameda County (73 installs), followed by Santa Clara County (62).

How often does Tesla install batteries with solar?

29.6% of its interconnected solar installs include battery storage across all years.

How many Tesla installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 591 interconnected installs (0.2% of the 591 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.