So Cal Custom Inc.
How many solar installs has So Cal Custom Inc. done in California, and which license number is on its installs?
So Cal Custom Inc. has 87 residential solar installs interconnected in California, active in the records from 2014 through 2016 (Apr 30, 2014 to Dec 29, 2016), most of them in Riverside County (28), Orange County (16) and Los Angeles County (15). CSLB lists license 834664 (SO CAL CUSTOM INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, D-34, expires Mar 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to So Cal Custom Inc. here carry more than one CSLB license number: 834664 on 55 (CSLB holder SO CAL CUSTOM INC, Colton) and 888104 on 13 (CSLB holder TESLA ENERGY OPERATIONS INC, Fremont), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 87
- Last 24 months
- 0
- Total capacity
- 525.8 kW DC
- Median system size
- 5.9 kW DC
- With battery storage
- 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
- Third-party owned
- 16.9% of 71 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 10, lease 2
- First install
- Apr 30, 2014
- Latest install
- Dec 29, 2016
- Counties
- 7
- Utilities
- SCE 70, SDGE 17
- CSLB license
- 834664, 888104
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2014 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2014 | 15 | 0 |
| 2015 | 31 | 0 |
| 2016 | 41 | 0 |
| 2017 | 0 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 87 interconnected installs with a tariff recorded (87) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 86 | 98.9% | not counted |
| NEM 2.0 | 1 | 1.1% | not recorded |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 12 of So Cal Custom Inc.’s installs the utility recorded a third-party ownership type: PPA 10, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches So Cal Custom Inc. exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| SolarCity | 12 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 73 of So Cal Custom Inc.’s 87 installs name a module maker in the “Generator Manufacturer” fields, and most of those (39, 53.4%) used modules recorded as Sun Edison.
Across all years, 87 of So Cal Custom Inc.’s 87 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (71, 81.6%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Sun Edison | 0 | 39 |
| SunEdison | 0 | 15 | |
| Kyocera | 0 | 7 | |
| SolarCity | 0 | 4 | |
| SolarWorld | 0 | 4 | |
| Inverter maker | Enphase | 0 | 71 |
| ABB | 0 | 9 | |
| Fronius | 0 | 4 | |
| Delta Electronics | 0 | 1 | |
| Kaco | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 73 of 87 installs, inverters on 87. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 834664 | SO CAL CUSTOM INC (Corporation) | CLEAR | B General Building Contractor; D-34 | Mar 24, 2004 | Mar 31, 2028 | 55 |
| 888104 | TESLA ENERGY OPERATIONS INC (Corporation) | CLEAR, Class Removal Pending | B General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar Contractor | Dec 7, 2006 | Dec 31, 2026 | 13 |
License numbers are the ones the utilities recorded on the interconnection applications (72 of 87 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The License Master file lists a pending classification removal date of Dec 30, 2026 for license 888104. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Other names reported under the same license
- Tesla Energy Operations (formerly SolarCity): 216,521 installs, license 888104
- Solar City: 697 installs, license 888104
- Tesla: 591 installs, license 888104
- SolarCity Corporation - Tiffany: 370 installs, license 888104
- Tesla Energy Ops, Inc.: 204 installs, license 888104
- SolarCity Corporation - Amanda Tsai: 195 installs, license 888104
- SolarCity Corporation - Julia: 177 installs, license 888104
- Tesla Energy Operation, Inc: 59 installs, license 888104
Counties
| County | Installs |
|---|---|
| Riverside | 28 |
| Orange | 16 |
| Los Angeles | 15 |
| San Diego | 14 |
| San Bernardino | 12 |
| Kings | 1 |
| Tulare | 1 |
Top cities
| City | Installs |
|---|---|
| Corona | 6 |
| Escondido | 4 |
| Moreno Valley | 4 |
| Santa Ana | 4 |
| Norco | 3 |
| Riverside | 3 |
| Winchester | 3 |
| Murrieta | 2 |
| Norwalk | 2 |
| Pomona | 2 |
| Rialto | 2 |
| San Clemente | 2 |
| San Diego | 2 |
| Warner Springs | 2 |
| West Covina | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| So Cal Custom Inc. | 63 |
| SO CAL CUSTOM INC. | 9 |
| So Cal Custom Inc | 8 |
| SO CAL CUSTOM INC | 5 |
| So Cal custom Inc. | 1 |
| So Cal Custom inc. | 1 |
Common questions
Where does So Cal Custom Inc. install solar?
Its installs are spread across 7 counties. The most are in Riverside County (28 installs), followed by Orange County (16).
How often does So Cal Custom Inc. install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many So Cal Custom Inc. installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 87 interconnected installs with a tariff recorded (87) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.