SolarCity Corporation - Amanda Tsai

How many solar installs has SolarCity Corporation - Amanda Tsai done in California, and which license number is on its installs?

SolarCity Corporation - Amanda Tsai has 195 residential solar installs interconnected in California, active in the records from 2013 through 2015 (Oct 11, 2013 to Aug 12, 2015), most of them in Fresno County (51), San Luis Obispo County (36) and Contra Costa County (35). CSLB lists license 888104 (TESLA ENERGY OPERATIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
195
Last 24 months
0
Total capacity
733.4 kW DC
Median system size
3.7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 195 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Oct 11, 2013
Latest install
Aug 12, 2015
Counties
9
Utilities
PGE 195
CSLB license
888104

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
20141920
201520
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 195 interconnected installs with a tariff recorded (195) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0195100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SolarCity Corporation - Amanda Tsai’s installs. No residential system in the file lists a third-party owner name that matches SolarCity Corporation - Amanda Tsai exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 194 of SolarCity Corporation - Amanda Tsai’s 195 installs name a module maker in the “Generator Manufacturer” fields, and most of those (153, 78.9%) used modules recorded as Trina Solar.

Across all years, 195 of SolarCity Corporation - Amanda Tsai’s 195 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (193, 99.0%) used inverters recorded as Power-One.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar0153
Canadian Solar038
Kyocera01
Silevo01
Suniva01
Inverter makerPower-One0193
Fronius01
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 194 of 195 installs, inverters on 195. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
888104TESLA ENERGY OPERATIONS INC (Corporation)CLEAR, Class Removal PendingB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorDec 7, 2006Dec 31, 2026127

License numbers are the ones the utilities recorded on the interconnection applications (127 of 195 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending classification removal date of Dec 30, 2026 for license 888104. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list SolarCity Corporation - Amanda Tsai’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco888104126921341027960403524692
unincorporated San Diego County8881043693224094252672036982522,198
unincorporated Marin County888104617715911000221412

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno51
San Luis Obispo36
Contra Costa35
Solano21
Santa Barbara16
Kern12
Placer11
Kings9
Merced4

Top cities

CityInstalls
Fresno41
Brentwood35
Nipomo24
Rio Vista21
Orcutt15
Clovis14
Bakersfield12
San Luis Obispo12
Lincoln11
Lemoore9
Santa Maria1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SolarCity Corporation - Amanda Tsai195

Common questions

Where does SolarCity Corporation - Amanda Tsai install solar?

Its installs are spread across 9 counties. The most are in Fresno County (51 installs), followed by San Luis Obispo County (36).

How often does SolarCity Corporation - Amanda Tsai install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many SolarCity Corporation - Amanda Tsai installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 195 interconnected installs with a tariff recorded (195) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.