Tesla Energy Operation, Inc
How many solar installs has Tesla Energy Operation, Inc done in California, and which license number is on its installs?
Tesla Energy Operation, Inc has 59 residential solar installs interconnected in California, active in the records from 2018 through 2019 (Mar 2, 2018 to Mar 22, 2019), most of them in Alameda County (9), San Joaquin County (8) and Santa Clara County (6). CSLB lists license 888104 (TESLA ENERGY OPERATIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Dec 31, 2026.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 59
- Last 24 months
- 0
- Total capacity
- 341.6 kW DC
- Median system size
- 5.1 kW DC
- With battery storage
- 8.5% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 18.6% of 59 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 5, lease 6
- First install
- Mar 2, 2018
- Latest install
- Mar 22, 2019
- Counties
- 20
- Utilities
- PGE 59
- CSLB license
- 888104
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2018 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2018 | 57 | 3 |
| 2019 | 2 | 2 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 59 interconnected installs with a tariff recorded (59) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 59 | 100.0% | 5 (8.5%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 11 of Tesla Energy Operation, Inc’s installs the utility recorded a third-party ownership type: PPA 5, lease 6, prepaid lease 0, other 0. Across all installers, 7 residential systems list a third-party owner name that matches Tesla Energy Operation, Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Tesla Energy Operations | 11 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 58 of Tesla Energy Operation, Inc’s 59 installs name a module maker in the “Generator Manufacturer” fields, and most of those (38, 65.5%) used modules recorded as SolarCity.
Across all years, 59 of Tesla Energy Operation, Inc’s 59 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 45.8%) used inverters recorded as Delta Electronics.
Across all years, 5 of Tesla Energy Operation, Inc’s 59 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Tesla.
5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SolarCity | 0 | 38 |
| Trina Solar | 0 | 15 | |
| Tesla | 0 | 2 | |
| Canadian Solar | 0 | 1 | |
| Kyocera | 0 | 1 | |
| Inverter maker | Delta Electronics | 0 | 27 |
| ABB | 0 | 16 | |
| SolarEdge | 0 | 16 | |
| Tesla | 0 | 5 | |
| Battery maker | Tesla | 0 | 5 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 58 of 59 installs, inverters on 59. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Tesla Energy Operation, Inc as developer on 0 battery storage projects and as installer on 4 (0 name it as both), 4 projects in all with 79 kWh of storage. 4 have the status Paid, with $14,859 in current incentive allocations. Applications were received from Feb 26, 2018 to Aug 12, 2019.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 4 | 79 | $14,859 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 4 | 79 | $14,859 | 4 | $14,859 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 888104 | TESLA ENERGY OPERATIONS INC (Corporation) | CLEAR, Class Removal Pending | B General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar Contractor | Dec 7, 2006 | Dec 31, 2026 | 59 |
License numbers are the ones the utilities recorded on the interconnection applications (59 of 59 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The License Master file lists a pending classification removal date of Dec 30, 2026 for license 888104. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Local solar permits naming its license
Solar permits in city and county open data that list Tesla Energy Operation, Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| City and County of San Francisco | 888104 | 126 | 92 | 134 | 102 | 79 | 60 | 40 | 35 | 24 | 692 |
| unincorporated San Diego County | 888104 | 369 | 322 | 409 | 425 | 267 | 203 | 69 | 82 | 52 | 2,198 |
| unincorporated Marin County | 888104 | 61 | 77 | 159 | 110 | 0 | 0 | 2 | 2 | 1 | 412 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Tesla Energy Operations (formerly SolarCity): 216,521 installs, license 888104
- Solar City: 697 installs, license 888104
- Tesla: 591 installs, license 888104
- SolarCity Corporation - Tiffany: 370 installs, license 888104
- Tesla Energy Ops, Inc.: 204 installs, license 888104
- SolarCity Corporation - Amanda Tsai: 195 installs, license 888104
- SolarCity Corporation - Julia: 177 installs, license 888104
- So Cal Custom Inc.: 87 installs, license 888104
Counties
| County | Installs |
|---|---|
| Alameda | 9 |
| San Joaquin | 8 |
| Santa Clara | 6 |
| Contra Costa | 5 |
| Fresno | 5 |
| Sonoma | 5 |
| San Mateo | 4 |
| Butte | 2 |
| Calaveras | 2 |
| Kern | 2 |
| Marin | 2 |
| Merced | 1 |
| San Benito | 1 |
| San Francisco | 1 |
| San Luis Obispo | 1 |
| Santa Barbara | 1 |
| Solano | 1 |
| Sutter | 1 |
| Tehama | 1 |
| Yolo | 1 |
Top cities
| City | Installs |
|---|---|
| San Jose | 5 |
| Tracy | 5 |
| Fresno | 4 |
| Dublin | 3 |
| Bakersfield | 2 |
| Fremont | 2 |
| Petaluma | 2 |
| Santa Rosa | 2 |
| Stockton | 2 |
| Antioch | 1 |
| Arroyo Grande | 1 |
| Atwater | 1 |
| Belmont | 1 |
| Bethel Island | 1 |
| Biggs | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Tesla Energy Operation, Inc | 33 |
| Tesla Energy Operation Inc | 21 |
| Tesla Energy Operation, Inc. | 3 |
| Tesla Energy Operation | 1 |
| Tesla Energy Operation, INC. | 1 |
Common questions
Where does Tesla Energy Operation, Inc install solar?
Its installs are spread across 20 counties. The most are in Alameda County (9 installs), followed by San Joaquin County (8).
How often does Tesla Energy Operation, Inc install batteries with solar?
8.5% of its interconnected solar installs include battery storage across all years.
How many Tesla Energy Operation, Inc installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 59 interconnected installs with a tariff recorded (59) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.