Tesla Energy Operation, Inc

How many solar installs has Tesla Energy Operation, Inc done in California, and which license number is on its installs?

Tesla Energy Operation, Inc has 59 residential solar installs interconnected in California, active in the records from 2018 through 2019 (Mar 2, 2018 to Mar 22, 2019), most of them in Alameda County (9), San Joaquin County (8) and Santa Clara County (6). CSLB lists license 888104 (TESLA ENERGY OPERATIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
59
Last 24 months
0
Total capacity
341.6 kW DC
Median system size
5.1 kW DC
With battery storage
8.5% all time; no installs in the last 24 months last 24 months
Third-party owned
18.6% of 59 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 5, lease 6
First install
Mar 2, 2018
Latest install
Mar 22, 2019
Counties
20
Utilities
PGE 59
CSLB license
888104

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018573
201922
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 59 interconnected installs with a tariff recorded (59) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.059100.0%5 (8.5%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 11 of Tesla Energy Operation, Inc’s installs the utility recorded a third-party ownership type: PPA 5, lease 6, prepaid lease 0, other 0. Across all installers, 7 residential systems list a third-party owner name that matches Tesla Energy Operation, Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Tesla Energy Operations11

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 58 of Tesla Energy Operation, Inc’s 59 installs name a module maker in the “Generator Manufacturer” fields, and most of those (38, 65.5%) used modules recorded as SolarCity.

Across all years, 59 of Tesla Energy Operation, Inc’s 59 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (27, 45.8%) used inverters recorded as Delta Electronics.

Across all years, 5 of Tesla Energy Operation, Inc’s 59 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Tesla.

5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarCity038
Trina Solar015
Tesla02
Canadian Solar01
Kyocera01
Inverter makerDelta Electronics027
ABB016
SolarEdge016
Tesla05
Battery makerTesla05

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 58 of 59 installs, inverters on 59. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Tesla Energy Operation, Inc as developer on 0 battery storage projects and as installer on 4 (0 name it as both), 4 projects in all with 79 kWh of storage. 4 have the status Paid, with $14,859 in current incentive allocations. Applications were received from Feb 26, 2018 to Aug 12, 2019.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid479$14,859

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage479$14,8594$14,859

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
888104TESLA ENERGY OPERATIONS INC (Corporation)CLEAR, Class Removal PendingB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorDec 7, 2006Dec 31, 202659

License numbers are the ones the utilities recorded on the interconnection applications (59 of 59 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending classification removal date of Dec 30, 2026 for license 888104. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list Tesla Energy Operation, Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco888104126921341027960403524692
unincorporated San Diego County8881043693224094252672036982522,198
unincorporated Marin County888104617715911000221412

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda9
San Joaquin8
Santa Clara6
Contra Costa5
Fresno5
Sonoma5
San Mateo4
Butte2
Calaveras2
Kern2
Marin2
Merced1
San Benito1
San Francisco1
San Luis Obispo1
Santa Barbara1
Solano1
Sutter1
Tehama1
Yolo1

Top cities

CityInstalls
San Jose5
Tracy5
Fresno4
Dublin3
Bakersfield2
Fremont2
Petaluma2
Santa Rosa2
Stockton2
Antioch1
Arroyo Grande1
Atwater1
Belmont1
Bethel Island1
Biggs1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Tesla Energy Operation, Inc33
Tesla Energy Operation Inc21
Tesla Energy Operation, Inc.3
Tesla Energy Operation1
Tesla Energy Operation, INC.1

Common questions

Where does Tesla Energy Operation, Inc install solar?

Its installs are spread across 20 counties. The most are in Alameda County (9 installs), followed by San Joaquin County (8).

How often does Tesla Energy Operation, Inc install batteries with solar?

8.5% of its interconnected solar installs include battery storage across all years.

How many Tesla Energy Operation, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 59 interconnected installs with a tariff recorded (59) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.