Solar installers in San Francisco, California
Most installs here are in San Francisco County.
Who installs the most solar in San Francisco?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in San Francisco are Luminalt Energy Corporation (225), SUTRO POWER (78) and ALL BAY SOLAR CONSTRUCTION INC (56). They account for 359 of the 1,050 residential solar installs interconnected there in that window.
In all, 13,137 homes in San Francisco have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 144 installers with installs in this window. 19 installs in the window were self-installed or had no installer recorded.
| 1 | Luminalt Energy Corporation | 225 | 1,999 |
| 2 | SUTRO POWER | 78 | 238 |
| 3 | ALL BAY SOLAR CONSTRUCTION INC | 56 | 315 |
| 4 | NRG Clean Power | 46 | 160 |
| 5 | ROCKIN ROOFERS | 46 | 195 |
| 6 | BRIGHT OPS | 44 | 47 |
| 7 | Tesla Energy Operations (formerly SolarCity) | 43 | 1,532 |
| 8 | Albion Power Company | 31 | 255 |
| 9 | OCCIDENTAL POWER SOLAR & COGEN | 27 | 166 |
| 10 | NEXT ELECTRIC | 26 | 83 |
| 11 | FREEDOM FOREVER LLC | 20 | 89 |
| 12 | YOUR ENERGY SOLUTIONS | 18 | 106 |
| 13 | AXIA SOLAR CORP | 15 | 16 |
| 14 | BETTER EARTH ELECTRIC INC | 13 | 99 |
| 15 | Sunrun | 13 | 328 |
| 16 | Nexus Energy Systems | 12 | 141 |
| 17 | SunPower | 12 | 372 |
| 18 | A P ELECTRICAL | 11 | 27 |
| 19 | Solar Technologies | 11 | 85 |
| 20 | High Definition Solar | 10 | 173 |
| 21 | American Array Solar | 9 | 58 |
| 22 | Clean Solar | 8 | 49 |
| 23 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 8 | 59 |
| 24 | Infinity Energy, Inc | 8 | 43 |
| 25 | Sun Light and Power | 8 | 108 |
Most installs, all time
| 1 | Luminalt Energy Corporation | 1,999 | 1,999 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 1,532 | 1,532 |
| 3 | Skytech Solar | 758 | 758 |
| 4 | Occidental Power | 475 | 475 |
| 5 | Sungevity, Inc. | 377 | 377 |
| 6 | SunPower | 372 | 372 |
| 7 | Sunrun | 328 | 328 |
| 8 | GRID Alternatives | 318 | 318 |
| 9 | ALL BAY SOLAR CONSTRUCTION INC | 315 | 315 |
| 10 | Albion Power Company | 255 | 255 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 951 | 201 |
| 2023 | 1,206 | 125 |
| 2024 | 632 | 252 |
| 2025 | 465 | 314 |
| 2026 (through Aug 31, 2026) | 448 | 354 |
Under the Net Billing Tariff (NEM 3.0)
965 of the 13,137 residential solar installs in San Francisco (7.3% of the 13,136 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.8% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in San Francisco
| 1 | Luminalt Energy Corporation | 202 | 187 | 92.6% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 62 | 61 | 98.4% |
| 3 | ALL BAY SOLAR CONSTRUCTION INC | 58 | 48 | 82.8% |
| 4 | NRG Clean Power | 54 | 48 | 88.9% |
| 5 | SUTRO POWER | 51 | 46 | 90.2% |
| 6 | BRIGHT OPS | 47 | 45 | 95.7% |
| 7 | ROCKIN ROOFERS | 47 | 45 | 95.7% |
| 8 | Albion Power Company | 35 | 28 | 80.0% |
| 9 | OCCIDENTAL POWER SOLAR & COGEN | 30 | 22 | 73.3% |
| 10 | NEXT ELECTRIC | 24 | 23 | 95.8% |
| 11 | FREEDOM FOREVER LLC | 23 | 20 | 87.0% |
| 12 | SunPower | 16 | 12 | 75.0% |
| 13 | Sunrun | 16 | 15 | 93.8% |
| 14 | AXIA SOLAR CORP | 14 | 12 | 85.7% |
| 15 | A P ELECTRICAL | 12 | 10 | 83.3% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 989 of San Francisco’s 1,050 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (346, 35.0%) used modules recorded as Qcells.
In the last 24 months, 1,050 of San Francisco’s 1,050 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (519, 49.4%) used inverters recorded as Tesla.
In the last 24 months, 664 of San Francisco’s 1,050 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (436, 65.7%) used batteries recorded as Tesla.
1,402 of 1,592 battery-paired PG&E and SCE installs (88.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 346 | 1,355 |
| REC | 180 | 939 | |
| SunPower | 104 | 3,194 | |
| Hyundai | 102 | not in top list | |
| JA Solar | 102 | not in top list | |
| Inverter maker | Tesla | 519 | 1,152 |
| Enphase | 333 | 3,989 | |
| SolarEdge | 144 | 2,173 | |
| SunPower | 57 | 2,581 | |
| FranklinWH | 39 | not in top list | |
| Battery maker | Tesla | 436 | 935 |
| Enphase | 115 | 175 | |
| SolarEdge | 39 | 52 | |
| FranklinWH | 37 | 56 | |
| PointGuard Energy Inc. | 14 | 14 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 12,598 of 13,137 installs, inverters on 13,137. See the methodology and the equipment index.
Solar permits issued in the City and County of San Francisco
From The San Francisco Department of Building Inspection’s open data: Electrical Permits, DataSF dataset ftty-kx6y. Counted by calendar year of the issued_date field. Solar: description contains SOLAR, PHOTOVOLTAIC or PV SYSTEM (any case). Battery: description contains BATTER, ENERGY STORAGE or POWERWALL (any case). Latest solar permit issue date in the data: Nov 13, 2026. Checked Nov 16, 2026.
| Year | Solar permits | Battery permits |
|---|---|---|
| 2018 | 1,002 | 169 |
| 2019 | 1,049 | 211 |
| 2020 | 950 | 266 |
| 2021 | 891 | 396 |
| 2022 | 995 | 353 |
| 2023 | 1,074 | 269 |
| 2024 | 733 | 531 |
| 2025 | 1,074 | 961 |
| 2026 (through Nov 16, 2026) | 490 | 394 |
A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Most San Francisco rooftop solar is filed as an electrical permit, so this is the electrical permit dataset. The dataset has no residential flag, so commercial solar permits are included. San Francisco began moving permits to a new system (PermitSF) in February 2026, so 2026 counts in this legacy dataset may be incomplete.
Contractor license numbers on the most solar permits, 2018 to 2026
Ranked by solar permits whose contractor entry in Electrical Permits Contacts, DataSF dataset fdm7-jqqf (contact_type = 'Contractor') lists the license number in license_number. 8,244 of 8,258 solar permits list one. Installer pages are linked only where this is the license number the utilities recorded on the most of that installer’s installs.
ZIP codes in San Francisco
ZIP codes with their own page where the utilities recorded San Francisco on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 94112 | 1,571 | 1,571 | 103 |
| 94110 | 1,475 | 1,475 | 123 |
| 94114 | 1,101 | 1,101 | 98 |
| 94131 | 1,081 | 1,081 | 90 |
| 94116 | 989 | 989 | 77 |
| 94122 | 938 | 938 | 75 |
| 94127 | 919 | 919 | 120 |
| 94124 | 745 | 745 | 39 |
| 94134 | 733 | 733 | 42 |
| 94117 | 603 | 603 | 26 |
| 94121 | 571 | 571 | 74 |
| 94118 | 523 | 523 | 56 |
| 94132 | 451 | 451 | 33 |
| 94107 | 378 | 378 | 26 |
| 94115 | 323 | 323 | 18 |
| 94123 | 263 | 263 | 26 |
| 94109 | 195 | 196 | 7 |
| 94103 | 117 | 117 | 6 |
| 94133 | 84 | 84 | 9 |
| 94102 | 51 | 51 | 1 |
SGIP battery storage projects in San Francisco
The SGIP report lists 819 battery storage projects with the city San Francisco, 383 with the status Paid ($3,144,131 in current incentive allocations, 7,317 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 383 | 7,317 | $3,144,131 |
| PBI in Process | 1 | 464 | $96,667 |
| Reserved | 43 | 637 | $919,053 |
| Pending Reservation | 6 | 111 | $170,843 |
| Cancelled | 363 | 76,165 | $35,780,425 |
| RRF Rejected | 23 | 348 | $65,005 |
Installers named on the most SGIP storage projects in San Francisco
| Installer | Projects | Paid |
|---|---|---|
| Luminalt Energy Corporation | 208 | 168 |
| Tesla Energy Operations (formerly SolarCity) | 63 | 53 |
| Promise Energy | 49 | 0 |
| Tesla | 46 | 37 |
| Sunrun | 36 | 18 |
| HAVEN ENERGY SERVICES INC | 24 | 1 |
| Infinity Energy, Inc | 22 | 12 |
| LA Solar Group | 22 | 18 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 22 | 13 |
| Semper Solaris Construction Inc | 16 | 5 |
212 of the 819 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
San Francisco is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 13,137
- Last 24 months
- 1,050
- Capacity
- 55.8 MW DC
- Median system size
- 3.7 kW DC
- With battery storage
- 12.1% all time; 70.7% last 24 months
- Third-party owned
- 5.8% where reported
- Ownership types recorded
- PPA 560, lease 158, prepaid lease 5, other 43
- Median battery size
- 13.5 kWh
- Earliest install in data
- Aug 12, 1997
Common questions
How many homes in San Francisco have solar?
13,137 residential solar systems in San Francisco were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,050 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in San Francisco?
144 installer names have at least one install interconnected in San Francisco in the last 24 months, and 674 appear in the full record.
How common are batteries with new solar in San Francisco?
12.1% of the solar installs interconnected in San Francisco include battery storage across all years, and 70.7% in the last 24 months (742 of 1,050).
How many solar installs in San Francisco are under NEM 3.0?
965 of the 13,137 residential solar installs in San Francisco (7.3% of the 13,136 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.