ALL BAY SOLAR CONSTRUCTION INC

How many solar installs has ALL BAY SOLAR CONSTRUCTION INC done in California, and which license number is on its installs?

ALL BAY SOLAR CONSTRUCTION INC has 835 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Oct 4, 2018 to Aug 28, 2026), most of them in San Francisco County (316), San Mateo County (298) and Alameda County (67). CSLB lists license 962034 (ALL BAY SOLAR CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
835
Last 24 months
146
Total capacity
5,418 kW DC
Median system size
6 kW DC
With battery storage
24.9% all time; 79.5% last 24 months
Third-party owned
0.0% of 835 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
160 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (28 installs list a capacity)
First install
Oct 4, 2018
Latest install
Aug 28, 2026
Counties
13
Utilities
PGE 835
CSLB license
962034

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201850
2019451
2020882
202113210
202217427
202320122
20246243
20257359
2026 (through Aug 31, 2026)5544

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

160 of its 835 interconnected installs (19.2% of the 835 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.040.5%not counted
NEM 2.067180.4%60 (8.9%)
Net Billing Tariff16019.2%144 (90.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ALL BAY SOLAR CONSTRUCTION INC’s installs. No residential system in the file lists a third-party owner name that matches ALL BAY SOLAR CONSTRUCTION INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 143 of ALL BAY SOLAR CONSTRUCTION INC’s 146 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (62, 43.4%) used modules recorded as Qcells.

In the last 24 months, 146 of ALL BAY SOLAR CONSTRUCTION INC’s 146 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (86, 58.9%) used inverters recorded as Enphase.

In the last 24 months, 104 of ALL BAY SOLAR CONSTRUCTION INC’s 146 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (44, 42.3%) used batteries recorded as FranklinWH.

190 of 208 battery-paired PG&E and SCE installs (91.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells62212
REC4473
SunPower18400
Hyundai11not in top list
JA Solar4not in top list
Inverter makerEnphase86437
Tesla5160
FranklinWH4460
SunPower11330
Qcells3not in top list
Battery makerFranklinWH4460
Tesla4346
Enphase1461
PointGuard Energy Inc.2not in top list
SunPower120

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 806 of 835 installs, inverters on 835. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ALL BAY SOLAR CONSTRUCTION INC as developer on 21 battery storage projects and as installer on 16 (16 name it as both), 21 projects in all with 444 kWh of storage. 14 have the status Paid, with $180,040 in current incentive allocations. Applications were received from Nov 16, 2021 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid14303$180,040
Reserved241$33,660
Cancelled472$18,612
RRF Rejected127$4,080

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage11207$29,9497$17,084
Equity Resiliency7172$167,6276$157,921
Large-Scale Storage123$5,0351$5,035
Residential Solar and Storage Equity - AB 209 Non-POU115$29,7000$0
Not stated127$4,0800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
962034ALL BAY SOLAR CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJun 13, 2011Sep 30, 2027833

License numbers are the ones the utilities recorded on the interconnection applications (834 of 835 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 962034. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ALL BAY SOLAR CONSTRUCTION INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco962034393564538975254825453
unincorporated Marin County9620340150001007

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Francisco316
San Mateo298
Alameda67
Santa Clara56
Contra Costa55
Marin25
Solano6
Napa4
Sonoma4
Mendocino1
Monterey1
San Joaquin1
Santa Cruz1

Top cities

CityInstalls
San Francisco315
Burlingame71
San Mateo47
San Jose26
Millbrae23
Berkeley22
Oakland21
Pacifica20
South San Francisco18
Daly City15
Belmont14
Redwood City14
Menlo Park13
Half Moon Bay12
Hillsborough8

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALL BAY SOLAR CONSTRUCTION INC806
All Bay Solar Construction Inc26
All Bay Solar Construction Inc.1
All Bay Solar Construction, Inc.1
All Bay Solar Construction,INC.1

Common questions

Where does ALL BAY SOLAR CONSTRUCTION INC install solar?

Its installs are spread across 13 counties. The most are in San Francisco County (316 installs), followed by San Mateo County (298).

How often does ALL BAY SOLAR CONSTRUCTION INC install batteries with solar?

24.9% of its interconnected solar installs include battery storage across all years, and 79.5% in the last 24 months (116 of 146).

How many ALL BAY SOLAR CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

160 of its 835 interconnected installs (19.2% of the 835 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.