Solar installers in Redwood City, California
Most installs here are in San Mateo County.
Who installs the most solar in Redwood City?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Redwood City are Sunrun (83), Tesla Energy Operations (formerly SolarCity) (67) and BRIGHT OPS (59). They account for 209 of the 644 residential solar installs interconnected there in that window.
In all, 3,996 homes in Redwood City have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 117 installers with installs in this window. 16 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 83 | 431 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 67 | 699 |
| 3 | BRIGHT OPS | 59 | 59 |
| 4 | ROCKIN ROOFERS | 25 | 91 |
| 5 | INFINIUM SOLAR, INC. | 24 | 36 |
| 6 | Citadel Roofing and Solar | 21 | 81 |
| 7 | CINNAMON ENERGY SYSTEMS INC | 16 | 44 |
| 8 | Cobalt Power Systems, Inc. | 16 | 85 |
| 9 | NRG Clean Power | 16 | 54 |
| 10 | Semper Solaris Construction Inc | 15 | 102 |
| 11 | Clean Solar | 14 | 96 |
| 12 | All on Electric | 11 | 14 |
| 13 | SOLEEVA ENERGY INC | 10 | 11 |
| 14 | Solar Technologies | 9 | 40 |
| 15 | AMECO SOLAR LLC | 8 | 12 |
| 16 | RM ENERGY INC | 8 | 8 |
| 17 | Solar Optimum Inc. | 8 | 55 |
| 18 | YOUR ENERGY SOLUTIONS | 8 | 37 |
| 19 | BRIGHT ENERGY GROUP LLC | 7 | 8 |
| 20 | Bay Area Energy Solutions, Inc. | 6 | 23 |
| 21 | BETTER EARTH ELECTRIC INC | 6 | 64 |
| 22 | emeraldECO | 6 | 6 |
| 23 | NEXT ELECTRIC | 6 | 21 |
| 24 | Nexus Energy Systems | 6 | 34 |
| 25 | RISE & SHINE SOLAR LLC | 6 | 14 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 699 | 699 |
| 2 | Sunrun | 431 | 431 |
| 3 | Vivint Solar Developer, LLC | 189 | 189 |
| 4 | SunPower | 168 | 168 |
| 5 | Semper Solaris Construction Inc | 102 | 102 |
| 6 | Clean Solar | 96 | 96 |
| 7 | ROCKIN ROOFERS | 91 | 91 |
| 8 | Cobalt Power Systems, Inc. | 85 | 85 |
| 9 | Citadel Roofing and Solar | 81 | 81 |
| 10 | BETTER EARTH ELECTRIC INC | 64 | 64 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 412 | 171 |
| 2023 | 549 | 165 |
| 2024 | 302 | 207 |
| 2025 | 316 | 268 |
| 2026 (through Aug 31, 2026) | 235 | 194 |
Under the Net Billing Tariff (NEM 3.0)
689 of the 3,996 residential solar installs in Redwood City (17.2% of the 3,996 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Redwood City
| 1 | Sunrun | 107 | 105 | 98.1% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 89 | 86 | 96.6% |
| 3 | BRIGHT OPS | 59 | 59 | 100.0% |
| 4 | ROCKIN ROOFERS | 27 | 25 | 92.6% |
| 5 | INFINIUM SOLAR, INC. | 25 | 23 | 92.0% |
| 6 | NRG Clean Power | 20 | 19 | 95.0% |
| 7 | Citadel Roofing and Solar | 19 | 11 | 57.9% |
| 8 | CINNAMON ENERGY SYSTEMS INC | 18 | 18 | 100.0% |
| 9 | Semper Solaris Construction Inc | 17 | 15 | 88.2% |
| 10 | Cobalt Power Systems, Inc. | 16 | 15 | 93.8% |
| 11 | Clean Solar | 14 | 14 | 100.0% |
| 12 | Solar Optimum Inc. | 14 | 14 | 100.0% |
| 13 | BETTER EARTH ELECTRIC INC | 9 | 9 | 100.0% |
| 14 | Solar Technologies | 9 | 8 | 88.9% |
| 15 | SunPower | 9 | 8 | 88.9% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 599 of Redwood City’s 644 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (130, 21.7%) used modules recorded as Qcells.
In the last 24 months, 644 of Redwood City’s 644 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (355, 55.1%) used inverters recorded as Tesla.
In the last 24 months, 435 of Redwood City’s 644 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (273, 62.8%) used batteries recorded as Tesla.
1,037 of 1,222 battery-paired PG&E and SCE installs (84.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 130 | 562 |
| REC | 115 | 468 | |
| JA Solar | 108 | 220 | |
| Hyundai | 48 | not in top list | |
| SunPower | 46 | 458 | |
| Inverter maker | Tesla | 355 | 808 |
| Enphase | 205 | 1,311 | |
| SolarEdge | 103 | 1,146 | |
| FranklinWH | 31 | not in top list | |
| SunPower | 18 | 387 | |
| Battery maker | Tesla | 273 | 639 |
| Enphase | 64 | 118 | |
| SolarEdge | 47 | 65 | |
| FranklinWH | 30 | 50 | |
| Lunar Energy | 11 | 11 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,703 of 3,996 installs, inverters on 3,995. See the methodology and the equipment index.
ZIP codes in Redwood City
ZIP codes with their own page where the utilities recorded Redwood City on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Redwood City
The SGIP report lists 308 battery storage projects with the city Redwood City, 220 with the status Paid ($2,675,229 in current incentive allocations, 6,224 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 220 | 6,224 | $2,675,229 |
| PBI in Process | 3 | 1,965 | $670,408 |
| Reserved | 12 | 783 | $355,933 |
| Pending Reservation | 1 | 13 | $14,520 |
| Cancelled | 59 | 6,295 | $1,876,273 |
| RRF Rejected | 13 | 161 | $25,280 |
Installers named on the most SGIP storage projects in Redwood City
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 52 | 35 |
| HAVEN ENERGY SERVICES INC | 30 | 19 |
| SunPower | 24 | 16 |
| Sunrun | 22 | 14 |
| Clean Solar | 18 | 13 |
| Citadel Roofing and Solar | 17 | 16 |
| JAJ Roofing dba Citadel Roofing & Solar | 17 | 16 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 14 | 14 |
| Tesla | 14 | 12 |
| Cobalt Power Systems, Inc. | 13 | 12 |
17 of the 308 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Redwood City is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 3,996
- Last 24 months
- 644
- Capacity
- 23.5 MW DC
- Median system size
- 5.3 kW DC
- With battery storage
- 30.6% all time; 82.5% last 24 months
- Third-party owned
- 16.9% where reported
- Ownership types recorded
- PPA 591, lease 71, prepaid lease 8, other 4
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jul 20, 2001
Common questions
How many homes in Redwood City have solar?
3,996 residential solar systems in Redwood City were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 644 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Redwood City?
117 installer names have at least one install interconnected in Redwood City in the last 24 months, and 398 appear in the full record.
How common are batteries with new solar in Redwood City?
30.6% of the solar installs interconnected in Redwood City include battery storage across all years, and 82.5% in the last 24 months (531 of 644).
How many solar installs in Redwood City are under NEM 3.0?
689 of the 3,996 residential solar installs in Redwood City (17.2% of the 3,996 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.