INFINIUM SOLAR, INC.

How many solar installs has INFINIUM SOLAR, INC. done in California, and which license number is on its installs?

INFINIUM SOLAR, INC. has 1,425 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Mar 8, 2018 to Aug 28, 2026), most of them in Santa Clara County (1,033), San Mateo County (177) and Alameda County (83). CSLB lists license 1031953 (INFINIUM SOLAR, INC.) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, C-46, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,425
Last 24 months
541
Total capacity
10,297.9 kW DC
Median system size
6.7 kW DC
With battery storage
43.0% all time; 85.6% last 24 months
Third-party owned
0.1% of 1,425 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
546 installs, latest Aug 28, 2026
Ownership types recorded
lease 1
Median battery size
14 kWh (189 installs list a capacity)
First install
Mar 8, 2018
Latest install
Aug 28, 2026
Counties
15
Utilities
PGE 1,425
CSLB license
1031953

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018230
2019560
2020748
202112112
202221747
202331335
2024154103
2025262229
2026 (through Aug 31, 2026)205179

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

546 of its 1,425 interconnected installs (38.3% of the 1,425 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0110.8%not counted
NEM 2.086860.9%120 (13.8%)
Net Billing Tariff54638.3%483 (88.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of INFINIUM SOLAR, INC.’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches INFINIUM SOLAR, INC. exactly.

Third-party owner named on its installsInstalls
SUNPOWER CORPORATION SYSTEMS1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 528 of INFINIUM SOLAR, INC.’s 541 installs name a module maker in the “Generator Manufacturer” fields, and most of those (457, 86.6%) used modules recorded as REC.

In the last 24 months, 541 of INFINIUM SOLAR, INC.’s 541 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (398, 73.6%) used inverters recorded as Enphase.

In the last 24 months, 404 of INFINIUM SOLAR, INC.’s 541 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (173, 42.8%) used batteries recorded as FranklinWH.

526 of 613 battery-paired PG&E and SCE installs (85.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC4571,178
SunPower7171
Canadian Solar314
JA Solar2not in top list
Boviet Solar Technology1not in top list
Inverter makerEnphase3981,182
Tesla207218
FranklinWH177199
SMA722
SolarEdge6101
Battery makerFranklinWH173193
Tesla166174
Enphase63146
Lunar Energy1not in top list
SolarEdge1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,339 of 1,425 installs, inverters on 1,425. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names INFINIUM SOLAR, INC. as developer on 49 battery storage projects and as installer on 49 (49 name it as both), 49 projects in all with 982 kWh of storage. 23 have the status Paid, with $164,039 in current incentive allocations. Applications were received from Aug 24, 2020 to Aug 18, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid23545$164,039
Reserved11145$41,861
Pending Reservation381$53,198
Cancelled12211$61,991

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage37716$92,53816$45,060
Equity Resiliency8181$152,2606$113,737
Residential Solar and Storage Equity - AB 209 Non-POU356$71,0490$0
Large-Scale Storage129$5,2411$5,241

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1031953INFINIUM SOLAR, INC. (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorOct 17, 2017Oct 31, 20271,424

License numbers are the ones the utilities recorded on the interconnection applications (1,424 of 1,425 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1031953. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara1,033
San Mateo177
Alameda83
Santa Cruz65
Contra Costa28
Monterey12
San Joaquin6
San Benito5
Solano5
Marin4
Napa2
San Francisco2
Calaveras1
Madera1
Merced1

Top cities

CityInstalls
San Jose488
Campbell79
Saratoga79
Los Altos70
Los Gatos67
Sunnyvale61
Cupertino43
Redwood City36
Mountain View35
Fremont33
Morgan Hill29
Milpitas28
Menlo Park26
Santa Cruz25
Gilroy18

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
INFINIUM SOLAR, INC.1,165
"INFINIUM SOLAR, INC."208
Infinium Solar52

Common questions

Where does INFINIUM SOLAR, INC. install solar?

Its installs are spread across 15 counties. The most are in Santa Clara County (1,033 installs), followed by San Mateo County (177).

How often does INFINIUM SOLAR, INC. install batteries with solar?

43.0% of its interconnected solar installs include battery storage across all years, and 85.6% in the last 24 months (463 of 541).

How many INFINIUM SOLAR, INC. installs are under NEM 3.0 (the Net Billing Tariff)?

546 of its 1,425 interconnected installs (38.3% of the 1,425 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.