Solar installers in Gilroy, California
Most installs here are in Santa Clara County.
Who installs the most solar in Gilroy?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Gilroy are Sunrun (228), Citadel Roofing and Solar (91) and Tesla Energy Operations (formerly SolarCity) (82). They account for 401 of the 792 residential solar installs interconnected there in that window.
In all, 5,816 homes in Gilroy have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 104 installers with installs in this window. 15 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 228 | 929 |
| 2 | Citadel Roofing and Solar | 91 | 111 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 82 | 880 |
| 4 | Complete Solar | 73 | 84 |
| 5 | BRIGHT OPS | 68 | 74 |
| 6 | FREEDOM FOREVER LLC | 16 | 93 |
| 7 | SunPower | 15 | 675 |
| 8 | Semper Solaris Construction Inc | 10 | 102 |
| 9 | INFINIUM SOLAR, INC. | 9 | 18 |
| 10 | Nexus Energy Systems | 9 | 72 |
| 11 | AXIA SOLAR CORP | 7 | 7 |
| 12 | NRG Clean Power | 6 | 34 |
| 13 | T D CONSTRUCTION | 6 | 32 |
| 14 | American Array Solar | 5 | 17 |
| 15 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 5 | 18 |
| 16 | L G C Y ELECTRIC | 5 | 5 |
| 17 | BETTER EARTH ELECTRIC INC | 4 | 38 |
| 18 | Cobalt Power Systems, Inc. | 4 | 10 |
| 19 | MASTER ROOFING SOLUTIONS LLC | 4 | 4 |
| 20 | POWER UP SOLUTIONS LLC | 4 | 4 |
| 21 | SUNTERNAL CONSTRUCTION INC | 4 | 36 |
| 22 | YOUR ENERGY SOLUTIONS | 4 | 10 |
| 23 | Empower Electric Solar | 3 | 10 |
| 24 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 3 | 3 |
| 25 | HOME SMART IMPROVEMENTS | 3 | 3 |
Most installs, all time
| 1 | Sunrun | 929 | 929 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 880 | 880 |
| 3 | SunPower | 675 | 675 |
| 4 | Vivint Solar Developer, LLC | 603 | 603 |
| 5 | Leonard's Roofing, Inc. | 153 | 153 |
| 6 | PetersenDean | 136 | 136 |
| 7 | Citadel Roofing and Solar | 111 | 111 |
| 8 | Future Energy Corporation | 103 | 103 |
| 9 | Semper Solaris Construction Inc | 102 | 102 |
| 10 | FREEDOM FOREVER LLC | 93 | 93 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 610 | 106 |
| 2023 | 769 | 135 |
| 2024 | 398 | 275 |
| 2025 | 435 | 309 |
| 2026 (through Aug 31, 2026) | 189 | 168 |
Under the Net Billing Tariff (NEM 3.0)
706 of the 5,816 residential solar installs in Gilroy (12.1% of the 5,816 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.2% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Gilroy
| 1 | Sunrun | 280 | 280 | 100.0% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 95 | 87 | 91.6% |
| 3 | BRIGHT OPS | 73 | 71 | 97.3% |
| 4 | FREEDOM FOREVER LLC | 30 | 29 | 96.7% |
| 5 | SunPower | 14 | 13 | 92.9% |
| 6 | Semper Solaris Construction Inc | 10 | 9 | 90.0% |
| 7 | INFINIUM SOLAR, INC. | 8 | 8 | 100.0% |
| 8 | AXIA SOLAR CORP | 6 | 6 | 100.0% |
| 9 | BETTER EARTH ELECTRIC INC | 6 | 6 | 100.0% |
| 10 | Solar Optimum Inc. | 6 | 5 | 83.3% |
| 11 | SUNTERNAL CONSTRUCTION INC | 6 | 6 | 100.0% |
| 12 | American Array Solar | 5 | 3 | 60.0% |
| 13 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 5 | 4 | 80.0% |
| 14 | L G C Y ELECTRIC | 5 | 5 | 100.0% |
| 15 | Nexus Energy Systems | 5 | 5 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 741 of Gilroy’s 792 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (346, 46.7%) used modules recorded as Qcells.
In the last 24 months, 792 of Gilroy’s 792 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (443, 55.9%) used inverters recorded as Tesla.
In the last 24 months, 503 of Gilroy’s 792 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (333, 66.2%) used batteries recorded as Tesla.
980 of 1,160 battery-paired PG&E and SCE installs (84.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 346 | 893 |
| JA Solar | 114 | 334 | |
| REC | 53 | 438 | |
| Elin Energy | 48 | not in top list | |
| LONGi | 46 | 242 | |
| Inverter maker | Tesla | 443 | 810 |
| Enphase | 338 | 2,082 | |
| SolarEdge | 134 | 1,548 | |
| SunPower | 21 | 709 | |
| FranklinWH | 14 | not in top list | |
| Battery maker | Tesla | 333 | 609 |
| SolarEdge | 78 | 97 | |
| Enphase | 55 | 98 | |
| FranklinWH | 14 | 17 | |
| Lunar Energy | 14 | 14 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,363 of 5,816 installs, inverters on 5,815. See the methodology and the equipment index.
ZIP codes in Gilroy
ZIP codes with their own page where the utilities recorded Gilroy on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95020 | 5,814 | 5,814 | 792 |
SGIP battery storage projects in Gilroy
The SGIP report lists 213 battery storage projects with the city Gilroy, 116 with the status Paid ($1,726,702 in current incentive allocations, 3,829 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 116 | 3,829 | $1,726,702 |
| PBI in Process | 1 | 520 | $260,000 |
| Reserved | 10 | 4,677 | $831,861 |
| Cancelled | 71 | 7,116 | $6,615,806 |
| RRF Rejected | 15 | 176 | $27,098 |
Installers named on the most SGIP storage projects in Gilroy
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 51 | 31 |
| Sunrun | 27 | 19 |
| SOLAR 4 AMERICA | 14 | 6 |
| PetersenDean | 13 | 6 |
| SunPower | 11 | 9 |
| Tesla Energy Operations (formerly SolarCity) | 11 | 8 |
| Infinity Energy, Inc | 10 | 7 |
| Tesla | 8 | 8 |
| Solar Optimum Inc. | 7 | 4 |
| Simmitri | 6 | 5 |
23 of the 213 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Gilroy is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 5,816
- Last 24 months
- 792
- Capacity
- 36.1 MW DC
- Median system size
- 5.4 kW DC
- With battery storage
- 19.9% all time; 77.9% last 24 months
- Third-party owned
- 33.5% where reported
- Ownership types recorded
- PPA 1,673, lease 249, prepaid lease 3, other 26
- Median battery size
- 13.5 kWh
- Earliest install in data
- Dec 15, 2000
Common questions
How many homes in Gilroy have solar?
5,816 residential solar systems in Gilroy were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 792 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Gilroy?
104 installer names have at least one install interconnected in Gilroy in the last 24 months, and 416 appear in the full record.
How common are batteries with new solar in Gilroy?
19.9% of the solar installs interconnected in Gilroy include battery storage across all years, and 77.9% in the last 24 months (617 of 792).
How many solar installs in Gilroy are under NEM 3.0?
706 of the 5,816 residential solar installs in Gilroy (12.1% of the 5,816 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.