L G C Y ELECTRIC

How many solar installs has L G C Y ELECTRIC done in California, and which license number is on its installs?

L G C Y ELECTRIC has 196 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jun 4, 2023 to Aug 20, 2026), most of them in Contra Costa County (48), Alameda County (24) and Santa Clara County (19). CSLB lists license 1099095 (LGCY ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
196
Last 24 months
126
Total capacity
1,533.5 kW DC
Median system size
7.2 kW DC
With battery storage
75.5% all time; 99.2% last 24 months
Third-party owned
65.3% of 196 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
159 installs, latest Aug 20, 2026
Ownership types recorded
PPA 91, lease 1, other 36
Median battery size
10 kWh (59 installs list a capacity)
First install
Jun 4, 2023
Latest install
Aug 20, 2026
Counties
27
Utilities
PGE 196
CSLB license
1099095

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023311
20245133
20259595
2026 (through Aug 31, 2026)1919

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

159 of its 196 interconnected installs (81.1% of the 196 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.2% of those include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03718.9%3 (8.1%)
Net Billing Tariff15981.1%145 (91.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 128 of L G C Y ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 91, lease 1, prepaid lease 0, other 36. No residential system in the file lists a third-party owner name that matches L G C Y ELECTRIC exactly.

Third-party owner named on its installsInstalls
Enfin61
EVERBRIGHT42
LGCY13
Goodleap7
Sunnova Energy Corporation3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 111 of L G C Y ELECTRIC’s 126 installs name a module maker in the “Generator Manufacturer” fields, and most of those (107, 96.4%) used modules recorded as Qcells.

In the last 24 months, 126 of L G C Y ELECTRIC’s 126 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (66, 52.4%) used inverters recorded as Enphase.

In the last 24 months, 53 of L G C Y ELECTRIC’s 126 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (51, 96.2%) used batteries recorded as Enphase.

70 of 148 battery-paired PG&E and SCE installs (47.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells107110
REC520
BP Solar11
Canadian Solar13
Renesola America1not in top list
Inverter makerEnphase66136
Qcells6060
SolarEdge913
Fronius34
SMA34
Battery makerEnphase5168
SolarEdge22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 168 of 196 installs, inverters on 196. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1099095LGCY ELECTRIC (Limited Liability)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing ContractorNov 28, 2022Nov 30, 2028196

License numbers are the ones the utilities recorded on the interconnection applications (196 of 196 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1099095. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list L G C Y ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023202420252026Total
unincorporated San Diego County1099095372535139236

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa48
Alameda24
Santa Clara19
Solano17
Fresno14
Kings12
San Joaquin12
San Benito7
Madera6
Yolo6
San Luis Obispo4
Kern3
Placer3
Sutter3
Marin2
San Mateo2
Shasta2
Sonoma2
Tehama2
Amador1
Butte1
Calaveras1
Colusa1
El Dorado1
Monterey1
Tulare1
Tuolumne1

Top cities

CityInstalls
San Jose13
Lemoore12
Concord11
Pleasanton10
Fresno8
Hollister7
Richmond7
Vacaville6
Gilroy5
Livermore5
Madera5
Stockton5
Clovis4
Dublin4
El Cerrito4

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
L G C Y ELECTRIC196

Common questions

Where does L G C Y ELECTRIC install solar?

Its installs are spread across 27 counties. The most are in Contra Costa County (48 installs), followed by Alameda County (24).

How often does L G C Y ELECTRIC install batteries with solar?

75.5% of its interconnected solar installs include battery storage across all years, and 99.2% in the last 24 months (125 of 126).

How many L G C Y ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

159 of its 196 interconnected installs (81.1% of the 196 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.