SunLogic Inc.

How many solar installs has SunLogic Inc. done in California, and which license number is on its installs?

SunLogic Inc. has 91 residential solar installs interconnected in California, active in the records from 2009 through 2019 (Oct 14, 2009 to Jun 11, 2019), most of them in Contra Costa County (26), Santa Clara County (20) and Alameda County (11). CSLB lists license 932914 (SOLAR TECHNOLOGIES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
91
Last 24 months
0
Total capacity
456.7 kW DC
Median system size
4.9 kW DC
With battery storage
1.1% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 90 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Oct 14, 2009
Latest install
Jun 11, 2019
Counties
15
Utilities
PGE 84, SCE 7
CSLB license
932914

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200920
2010330
2011380
201280
201300
201400
201500
201600
201700
201850
201951
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 91 interconnected installs with a tariff recorded (91) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08189.0%not counted
NEM 2.01011.0%1 (10.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SunLogic Inc.’s installs. No residential system in the file lists a third-party owner name that matches SunLogic Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 76 of SunLogic Inc.’s 91 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (31, 40.8%) used modules recorded as BP Solar.

Across all years, 91 of SunLogic Inc.’s 91 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (38, 41.8%) used inverters recorded as SunPower.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerBP Solar031
SunPower028
Sharp010
Evergreen Solar04
Suntech02
Inverter makerSunPower038
SMA036
Enphase020
Fronius03
Tesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 76 of 91 installs, inverters on 91. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SunLogic Inc. as developer on 319 battery storage projects and as installer on 9 (9 name it as both), 319 projects in all with 7,989 kWh of storage. 243 have the status Paid, with $1,421,044 in current incentive allocations. Applications were received from May 1, 2017 to Sep 30, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2434,870$1,421,044
PBI in Process140$8,700
Reserved3657$145,261
Pending Reservation126$43,825
Cancelled702,369$644,840
RRF Rejected126$3,480

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage2524,585$800,462202$609,109
Equity Resiliency38911$850,69930$699,595
Large-Scale Storage272,441$568,68311$112,340
Residential Solar and Storage Equity - AB 209 Non-POU126$43,8250$0
Not stated126$3,4800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
932914SOLAR TECHNOLOGIES (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 21, 2009May 31, 202711

License numbers are the ones the utilities recorded on the interconnection applications (11 of 91 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 932914. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SunLogic Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
City and County of San Francisco932914129107914121083
unincorporated Marin County9329144213000010

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa26
Santa Clara20
Alameda11
San Mateo9
Sonoma6
Ventura5
Monterey3
San Francisco2
San Joaquin2
Santa Cruz2
Amador1
Los Angeles1
Marin1
Napa1
Orange1

Top cities

CityInstalls
San Jose11
Walnut Creek5
Brentwood4
Orinda4
Simi Valley4
Sunnyvale4
Danville3
Redwood City3
Salinas3
Castro Valley2
Clayton2
Dublin2
Mountain View2
Oakley2
Petaluma2

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SunLogic Inc.55
SunLogic, Inc. DBA Solar Technologies10
SUNLOGIC6
SunLogic5
SunLogic Inc5
SunLogic, Inc.3
Sunlogic2
Sunlogic Inc2
Sunlogic Inc.1
Sunlogic, Inc.1
SunLogic. Inc.1

Common questions

Where does SunLogic Inc. install solar?

Its installs are spread across 15 counties. The most are in Contra Costa County (26 installs), followed by Santa Clara County (20).

How often does SunLogic Inc. install batteries with solar?

1.1% of its interconnected solar installs include battery storage across all years.

How many SunLogic Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 91 interconnected installs with a tariff recorded (91) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.