NRGCleanPower

How many solar installs has NRGCleanPower done in California, and which license number is on its installs?

NRGCleanPower has 47 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Mar 31, 2022 to Aug 27, 2026), most of them in San Diego County (40) and Orange County (7). CSLB lists license 1026168 (N R G CLEAN POWER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
47
Last 24 months
37
Total capacity
307.2 kW DC
Median system size
6 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
19.6% of 46 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
38 installs, latest Aug 27, 2026
Ownership types recorded
PPA 4, lease 5
First install
Mar 31, 2022
Latest install
Aug 27, 2026
Counties
2
Utilities
SDGE 47
CSLB license
1026168

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202280
202300
202420
2025160
2026 (through Aug 31, 2026)210

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

38 of its 47 interconnected installs (82.6% of the 46 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0817.4%not recorded
Net Billing Tariff3882.6%not recorded
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 9 of NRGCleanPower’s installs the utility recorded a third-party ownership type: PPA 4, lease 5, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches NRGCleanPower exactly.

Third-party owner named on its installsInstalls
NRG CLEAN POWER INC.9

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 35 of NRGCleanPower’s 37 installs name a module maker in the “Generator Manufacturer” fields, and most of those (35, 100.0%) used modules recorded as REC.

In the last 24 months, 36 of NRGCleanPower’s 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (21, 58.3%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC3541
Inverter makerTesla2121
Enphase1422
Schneider Electric11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 44 of 47 installs, inverters on 46. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1026168N R G CLEAN POWER INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorApr 26, 2017Apr 30, 202746

License numbers are the ones the utilities recorded on the interconnection applications (46 of 47 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1026168. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list NRGCleanPower’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco1026168026101325213819134
unincorporated San Diego County102616827258159712296
unincorporated Marin County10261680042000006

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego40
Orange7

Top cities

CityInstalls
San Diego20
Carlsbad3
Oceanside3
San Clemente3
Encinitas2
Laguna Niguel2
Santee2
Vista2
Chula Vista1
Coronado1
Del Mar1
El Cajon1
Imperial Beach1
La Mesa1
Mission Viejo1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NRGCleanPower47

Common questions

Where does NRGCleanPower install solar?

Its installs are spread across 2 counties. The most are in San Diego County (40 installs), followed by Orange County (7).

How often does NRGCleanPower install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many NRGCleanPower installs are under NEM 3.0 (the Net Billing Tariff)?

38 of its 47 interconnected installs (82.6% of the 46 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources