Solar installers in Encinitas, California

Most installs here are in San Diego County.

Who installs the most solar in Encinitas?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Encinitas are SunPower (181), Sunrun (66) and Aloha Solar Power (56). They account for 303 of the 682 residential solar installs interconnected there in that window.

In all, 6,383 homes in Encinitas have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 112 installers with installs in this window. 11 installs in the window were self-installed or had no installer recorded.

1SunPower181350
2Sunrun66407
3Aloha Solar Power56157
4Baker Electric, Inc.45648
5Stellar Solar33384
6San Diego County Solar17204
7Sunline Energy Inc.16137
8Tesla Energy Operations (formerly SolarCity)15436
9Freedom Solar Co1462
10Jamar Power System1228
11San Diego Solar1226
12Semper Solaris Construction Inc12234
13Cosmic Solar, Inc.1044
14Powur PBC (Powur Home)859
15Solar Universe San Marcos850
16PALOMAR SOLAR LTD754
17Bright Planet Solar656
18Blalock electric541
19home unplugged535
20West Coast Solar551
21California Premier Solar429
22eric welter electric412
23Neighborhood Solar49
24Solartech4128
25Allied Energy, Incl315

Most installs, all time

1Baker Electric, Inc.648648
2Tesla Energy Operations (formerly SolarCity)436436
3Sunrun407407
4Stellar Solar384384
5SunPower350350
6Semper Solaris Construction Inc234234
7Sullivan Solar Power228228
8San Diego County Solar204204
9Aloha Solar Power157157
10Sunline Energy Inc.137137

Installs by year

YearInstalls interconnectedWith battery storage
20226280
20231,0030
20243340
20254240
2026 (through Aug 31, 2026)1790

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Under the Net Billing Tariff (NEM 3.0)

616 of the 6,383 residential solar installs in Encinitas (9.7% of the 6,383 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 27, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Encinitas

1Sunrun1220not recorded
2Aloha Solar Power650not recorded
3Baker Electric, Inc.460not recorded
4Stellar Solar310not recorded
5Tesla Energy Operations (formerly SolarCity)240not recorded
6Semper Solaris Construction Inc230not recorded
7Freedom Solar Co220not recorded
8SunPower220not recorded
9San Diego County Solar190not recorded
10Jamar Power System140not recorded
11Sunline Energy Inc.130not recorded
12Cosmic Solar, Inc.110not recorded
13Bright Planet Solar100not recorded
14San Diego Solar100not recorded
15Powur PBC (Powur Home)70not recorded

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 627 of Encinitas’ 682 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (302, 48.2%) used modules recorded as Qcells.

In the last 24 months, 682 of Encinitas’ 682 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (359, 52.6%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3021,172
Silfab68245
REC48357
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.39not in top list
Canadian Solar36232
Inverter makerEnphase3592,620
Tesla267399
SolarEdge471,812
SMA6463
Delta Electronics597

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,829 of 6,383 installs, inverters on 6,165. See the methodology and the equipment index.

ZIP codes in Encinitas

ZIP codes with their own page where the utilities recorded Encinitas on at least 10% of the ZIP’s installs, through Aug 31, 2026.

920246,3826,398684

SGIP battery storage projects in Encinitas

The SGIP report lists 351 battery storage projects with the city Encinitas, 254 with the status Paid ($1,689,520 in current incentive allocations, 4,840 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid2544,840$1,689,520
Reserved266$57,394
Waitlist241$57,779
Cancelled883,326$1,814,618
RRF Rejected590$14,078

Installers named on the most SGIP storage projects in Encinitas

InstallerProjectsPaid
Semper Solaris Construction Inc7249
Sullivan Solar Power3229
Solare Energy, Inc2117
TMAG INDUSTRIES INC2020
Stellar Solar1919
Sunrun187
Home Energy Systems, Inc.1311
Tesla97
Tesla Energy Operations (formerly SolarCity)87
ALIVE Industries, Inc.77

93 of the 351 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Encinitas is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
6,383
Last 24 months
682
Capacity
43.1 MW DC
Median system size
6 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
12.1% where reported
Ownership types recorded
PPA 522, lease 120, prepaid lease 8, other 18
Earliest install in data
Apr 5, 2001

Common questions

How many homes in Encinitas have solar?

6,383 residential solar systems in Encinitas were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 682 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Encinitas?

112 installer names have at least one install interconnected in Encinitas in the last 24 months, and 505 appear in the full record.

How common are batteries with new solar in Encinitas?

Battery storage is not recorded on the solar installs interconnected in Encinitas: SDG&E files a battery as its own project record, not on the solar record.

How many solar installs in Encinitas are under NEM 3.0?

616 of the 6,383 residential solar installs in Encinitas (9.7% of the 6,383 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.