Jamar Power System
How many solar installs has Jamar Power System done in California, and which license number is on its installs?
Jamar Power System has 906 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Apr 26, 2013 to Aug 25, 2026), most of them in San Diego County (864) and Orange County (42). CSLB lists license 827648 (JAMAR POWER SYSTEMS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 906
- Last 24 months
- 117
- Total capacity
- 5,142 kW DC
- Median system size
- 5.2 kW DC
- With battery storage
- not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 2.9% of 750 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 110 installs, latest Aug 25, 2026
- Ownership types recorded
- lease 22
- First install
- Apr 26, 2013
- Latest install
- Aug 25, 2026
- Counties
- 2
- Utilities
- SDGE 906
- CSLB license
- 827648
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2013 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2013 | 67 | 0 |
| 2014 | 67 | 0 |
| 2015 | 97 | 0 |
| 2016 | 99 | 0 |
| 2017 | 32 | 0 |
| 2018 | 30 | 0 |
| 2019 | 45 | 0 |
| 2020 | 18 | 0 |
| 2021 | 48 | 0 |
| 2022 | 68 | 0 |
| 2023 | 154 | 0 |
| 2024 | 84 | 0 |
| 2025 | 47 | 0 |
| 2026 (through Aug 31, 2026) | 50 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
110 of its 906 interconnected installs (12.1% of the 906 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 25, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 310 | 34.2% | not counted |
| NEM 2.0 | 486 | 53.6% | not recorded |
| Net Billing Tariff | 110 | 12.1% | not recorded |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 22 of Jamar Power System’s installs the utility recorded a third-party ownership type: PPA 0, lease 22, prepaid lease 0, other 0. Across all installers, 4 residential systems list a third-party owner name that matches Jamar Power System exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Jamar Power Systems | 13 |
| Jamar Power System | 4 |
| Sunpower | 2 |
| 17472.0 | 1 |
| 24223.0 | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 112 of Jamar Power System’s 117 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (38, 33.9%) used modules recorded as Silfab.
In the last 24 months, 117 of Jamar Power System’s 117 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (114, 97.4%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Silfab | 38 | not in top list |
| Qcells | 30 | 88 | |
| PhonoSolarTechnologyCo.,Ltd. | 18 | not in top list | |
| UnitedRenewableEnergyCo.,Ltd. | 17 | 148 | |
| JA Solar | 5 | not in top list | |
| Inverter maker | Enphase | 114 | 548 |
| Tesla | 2 | not in top list | |
| Schneider Electric | 1 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 857 of 906 installs, inverters on 906. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 827648 | JAMAR POWER SYSTEMS (Corporation) | CLEAR | C-10 Electrical Contractor | Nov 20, 2003 | Nov 30, 2027 | 613 |
License numbers are the ones the utilities recorded on the interconnection applications (613 of 906 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 827648. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Jamar Power System’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| unincorporated San Diego County | 827648 | 15 | 12 | 10 | 12 | 6 | 18 | 3 | 9 | 8 | 93 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Jamar Power Systems: 118 installs, license 827648
Counties
Top cities
| City | Installs |
|---|---|
| San Diego | 207 |
| El Cajon | 97 |
| La Mesa | 72 |
| Carlsbad | 60 |
| Oceanside | 48 |
| San Marcos | 46 |
| Escondido | 45 |
| Santee | 41 |
| Chula Vista | 35 |
| Encinitas | 28 |
| Lakeside | 28 |
| Vista | 25 |
| Poway | 18 |
| Borrego Springs | 15 |
| Alpine | 14 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Jamar Power System | 906 |
Common questions
Where does Jamar Power System install solar?
Its installs are spread across 2 counties. The most are in San Diego County (864 installs), followed by Orange County (42).
How often does Jamar Power System install batteries with solar?
Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.
How many Jamar Power System installs are under NEM 3.0 (the Net Billing Tariff)?
110 of its 906 interconnected installs (12.1% of the 906 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.