Jamar Power System

How many solar installs has Jamar Power System done in California, and which license number is on its installs?

Jamar Power System has 906 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Apr 26, 2013 to Aug 25, 2026), most of them in San Diego County (864) and Orange County (42). CSLB lists license 827648 (JAMAR POWER SYSTEMS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
906
Last 24 months
117
Total capacity
5,142 kW DC
Median system size
5.2 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
2.9% of 750 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
110 installs, latest Aug 25, 2026
Ownership types recorded
lease 22
First install
Apr 26, 2013
Latest install
Aug 25, 2026
Counties
2
Utilities
SDGE 906
CSLB license
827648

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013670
2014670
2015970
2016990
2017320
2018300
2019450
2020180
2021480
2022680
20231540
2024840
2025470
2026 (through Aug 31, 2026)500

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

110 of its 906 interconnected installs (12.1% of the 906 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.031034.2%not counted
NEM 2.048653.6%not recorded
Net Billing Tariff11012.1%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 22 of Jamar Power System’s installs the utility recorded a third-party ownership type: PPA 0, lease 22, prepaid lease 0, other 0. Across all installers, 4 residential systems list a third-party owner name that matches Jamar Power System exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Jamar Power Systems13
Jamar Power System4
Sunpower2
17472.01
24223.01

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 112 of Jamar Power System’s 117 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (38, 33.9%) used modules recorded as Silfab.

In the last 24 months, 117 of Jamar Power System’s 117 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (114, 97.4%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab38not in top list
Qcells3088
PhonoSolarTechnologyCo.,Ltd.18not in top list
UnitedRenewableEnergyCo.,Ltd.17148
JA Solar5not in top list
Inverter makerEnphase114548
Tesla2not in top list
Schneider Electric1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 857 of 906 installs, inverters on 906. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
827648JAMAR POWER SYSTEMS (Corporation)CLEARC-10 Electrical ContractorNov 20, 2003Nov 30, 2027613

License numbers are the ones the utilities recorded on the interconnection applications (613 of 906 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 827648. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Jamar Power System’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County8276481512101261839893

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego864
Orange42

Top cities

CityInstalls
San Diego207
El Cajon97
La Mesa72
Carlsbad60
Oceanside48
San Marcos46
Escondido45
Santee41
Chula Vista35
Encinitas28
Lakeside28
Vista25
Poway18
Borrego Springs15
Alpine14

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Jamar Power System906

Common questions

Where does Jamar Power System install solar?

Its installs are spread across 2 counties. The most are in San Diego County (864 installs), followed by Orange County (42).

How often does Jamar Power System install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Jamar Power System installs are under NEM 3.0 (the Net Billing Tariff)?

110 of its 906 interconnected installs (12.1% of the 906 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.