Solar installers in El Cajon, California

Most installs here are in San Diego County.

Who installs the most solar in El Cajon?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in El Cajon are Sunrun (251), SunPower (71) and Bright Planet Solar (55). They account for 377 of the 1,143 residential solar installs interconnected there in that window.

In all, 14,952 homes in El Cajon have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 153 installers with installs in this window. 77 installs in the window were self-installed or had no installer recorded.

1Sunrun2511,425
2SunPower71342
3Bright Planet Solar55367
4green source eletric51144
5Baker Electric, Inc.46861
6Semper Solaris Construction Inc46884
7Tesla Energy Operations (formerly SolarCity)341,014
8Solartech33484
9SOLARA HOME ENERGY LLC3030
10Blalock electric24184
11Stellar Solar20271
12Freedom Solar Co18184
13Global Solar Electric1775
14Eriksson1533
15Simms Solar Electric Inc.1526
16Aloha Solar Power1432
17CalSolar1314
18Solar Universe San Marcos1259
19Empower Electric Solar1111
20LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC1121
21Alternative Energy Applications, Inc.1071
22BETTER EARTH ELECTRIC INC834
23Cyberdyne construction822
24EXO Energy883
25West Coast Solar890

Most installs, all time

1Sunrun1,4251,425
2Tesla Energy Operations (formerly SolarCity)1,0141,014
3Vivint Solar Developer, LLC990990
4Semper Solaris Construction Inc884884
5Baker Electric, Inc.861861
6Solartech484484
7Bright Planet Solar367367
8SunPower342342
9Sullivan Solar Power307307
10Stellar Solar271271

Installs by year

YearInstalls interconnectedWith battery storage
20221,4800
20231,6710
20247250
20256250
2026 (through Aug 31, 2026)3180

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Under the Net Billing Tariff (NEM 3.0)

1,436 of the 14,952 residential solar installs in El Cajon (9.6% of the 14,952 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 26, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in El Cajon

1Sunrun3600not recorded
2Bright Planet Solar1400not recorded
3SunPower960not recorded
4Semper Solaris Construction Inc660not recorded
5green source eletric630not recorded
6Baker Electric, Inc.530not recorded
7Tesla Energy Operations (formerly SolarCity)530not recorded
8Solartech390not recorded
9SOLARA HOME ENERGY LLC300not recorded
10Freedom Solar Co270not recorded
11Blalock electric260not recorded
12LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC190not recorded
13Global Solar Electric180not recorded
14ADVANCED ENERGY SERVICES INC170not recorded
15Stellar Solar170not recorded

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 978 of El Cajon’s 1,143 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (294, 30.1%) used modules recorded as Qcells.

In the last 24 months, 1,143 of El Cajon’s 1,143 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (495, 43.3%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2942,165
LONGi120539
Canadian Solar110727
Silfab102612
JA Solar59not in top list
Inverter makerTesla495681
Enphase4755,688
SolarEdge1834,841
Delta Electronics22240
SMA161,157

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 13,189 of 14,952 installs, inverters on 14,408. See the methodology and the equipment index.

ZIP codes in El Cajon

ZIP codes with their own page where the utilities recorded El Cajon on at least 10% of the ZIP’s installs, through Aug 31, 2026.

920215,4055,407396
920195,0625,062325
920204,4854,487422

SGIP battery storage projects in El Cajon

The SGIP report lists 594 battery storage projects with the city El Cajon, 323 with the status Paid ($5,127,061 in current incentive allocations, 8,142 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid3238,142$5,127,061
PBI in Process55,202$1,986,651
Reserved741,442$1,518,548
Pending Reservation113$26,835
Waitlist8173$232,730
Cancelled17313,980$10,444,384
RRF Rejected10130$95,885

Installers named on the most SGIP storage projects in El Cajon

InstallerProjectsPaid
Semper Solaris Construction Inc158104
Sunrun4631
APOLLO HOME POWER LLC405
Solar Symphony Construction Inc.389
Sullivan Solar Power3431
Solare Energy, Inc1413
SOLAR 4 AMERICA128
Infinity Energy, Inc96
Solar Watt Solutions84
Sunline Energy Inc.74

131 of the 594 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

El Cajon is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, ST. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
14,952
Last 24 months
1,143
Capacity
105.9 MW DC
Median system size
6.2 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
27.1% where reported
Ownership types recorded
PPA 2,678, lease 521, prepaid lease 19, other 154
Earliest install in data
Oct 27, 2000

Common questions

How many homes in El Cajon have solar?

14,952 residential solar systems in El Cajon were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,143 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in El Cajon?

153 installer names have at least one install interconnected in El Cajon in the last 24 months, and 705 appear in the full record.

How common are batteries with new solar in El Cajon?

Battery storage is not recorded on the solar installs interconnected in El Cajon: SDG&E files a battery as its own project record, not on the solar record.

How many solar installs in El Cajon are under NEM 3.0?

1,436 of the 14,952 residential solar installs in El Cajon (9.6% of the 14,952 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.