Solar Universe San Marcos

How many solar installs has Solar Universe San Marcos done in California, and which license number is on its installs?

Solar Universe San Marcos has 1,439 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jun 19, 2014 to Aug 17, 2026), most of them in San Diego County (1,380) and Orange County (59). CSLB lists license 992345 (BUILD BROTHERS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,439
Last 24 months
207
Total capacity
9,838.6 kW DC
Median system size
5.9 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
12.7% of 1,399 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
210 installs, latest Aug 17, 2026
Ownership types recorded
PPA 137, lease 16, prepaid lease 25
First install
Jun 19, 2014
Latest install
Aug 17, 2026
Counties
2
Utilities
SDGE 1,439
CSLB license
992345

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014220
20151040
20161220
2017420
2018540
20191110
20201130
20211550
20221660
20232700
2024950
20251270
2026 (through Aug 31, 2026)580

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

210 of its 1,439 interconnected installs (14.6% of the 1,439 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.019513.6%not counted
NEM 2.01,03471.9%not recorded
Net Billing Tariff21014.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 178 of Solar Universe San Marcos’s installs the utility recorded a third-party ownership type: PPA 137, lease 16, prepaid lease 25, other 0. No residential system in the file lists a third-party owner name that matches Solar Universe San Marcos exactly.

Third-party owner named on its installsInstalls
KBI Electric Inc.152
Build Brothers21
Ian Frisch2
KBI INC1
KBI Elecric INC.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 182 of Solar Universe San Marcos’ 207 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (43, 23.6%) used modules recorded as HDHYUNDAIENERGYSOLUTIONSCO.,LTD..

In the last 24 months, 207 of Solar Universe San Marcos’ 207 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (147, 71.0%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHDHYUNDAIENERGYSOLUTIONSCO.,LTD.43not in top list
Solaria36not in top list
Aptos Solar25not in top list
Qcells25104
LONGi17not in top list
Inverter makerTesla147159
EG440not in top list
Enphase19314
SunPower9748
Power-One2not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,375 of 1,439 installs, inverters on 1,439. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
992345BUILD BROTHERS INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing ContractorApr 23, 2014Apr 30, 20281,268

License numbers are the ones the utilities recorded on the interconnection applications (1,269 of 1,439 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 992345. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Universe San Marcos’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County992345113018272851154230252

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego1,380
Orange59

Top cities

CityInstalls
San Diego469
Chula Vista199
Carlsbad68
Escondido67
La Mesa65
El Cajon59
Bonita58
Ramona52
Encinitas50
Oceanside40
Santee36
Spring Valley36
Vista34
La Jolla32
Poway23

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Universe San Marcos1,439

Common questions

Where does Solar Universe San Marcos install solar?

Its installs are spread across 2 counties. The most are in San Diego County (1,380 installs), followed by Orange County (59).

How often does Solar Universe San Marcos install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Solar Universe San Marcos installs are under NEM 3.0 (the Net Billing Tariff)?

210 of its 1,439 interconnected installs (14.6% of the 1,439 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.