Solar installers in Vista, California
Most installs here are in San Diego County.
Who installs the most solar in Vista?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Vista are Sunrun (290), Aloha Solar Power (55) and Baker Electric, Inc. (53). They account for 398 of the 882 residential solar installs interconnected there in that window.
In all, 9,997 homes in Vista have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 135 installers with installs in this window. 58 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 290 | 1,186 |
| 2 | Aloha Solar Power | 55 | 87 |
| 3 | Baker Electric, Inc. | 53 | 726 |
| 4 | Bright Planet Solar | 35 | 295 |
| 5 | Freedom Solar Co | 30 | 188 |
| 6 | Tesla Energy Operations (formerly SolarCity) | 25 | 674 |
| 7 | Stellar Solar | 22 | 267 |
| 8 | Semper Solaris Construction Inc | 20 | 404 |
| 9 | SOLARA HOME ENERGY LLC | 19 | 19 |
| 10 | Cosmic Solar, Inc. | 16 | 101 |
| 11 | Jamar Power System | 14 | 25 |
| 12 | New Era Electric | 12 | 13 |
| 13 | Blalock electric | 11 | 61 |
| 14 | Powur PBC (Powur Home) | 10 | 64 |
| 15 | Solartech | 8 | 88 |
| 16 | Current Home | 7 | 23 |
| 17 | San Diego County Solar | 7 | 29 |
| 18 | Sunline Energy Inc. | 7 | 83 |
| 19 | ALIVE Industries, Inc. | 5 | 46 |
| 20 | BETTER EARTH ELECTRIC INC | 5 | 25 |
| 21 | Empower Electric Solar | 5 | 8 |
| 22 | G C Electric-Solar | 5 | 34 |
| 23 | Clayc Electric | 4 | 34 |
| 24 | Electric Dove | 4 | 4 |
| 25 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 4 | 10 |
Most installs, all time
| 1 | Sunrun | 1,186 | 1,186 |
| 2 | Baker Electric, Inc. | 726 | 726 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 674 | 674 |
| 4 | Vivint Solar Developer, LLC | 530 | 530 |
| 5 | Semper Solaris Construction Inc | 404 | 404 |
| 6 | Bright Planet Solar | 295 | 295 |
| 7 | Stellar Solar | 267 | 267 |
| 8 | SunPower | 251 | 251 |
| 9 | Lennar | 211 | 211 |
| 10 | Freedom Solar Co | 188 | 188 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 1,006 | 0 |
| 2023 | 1,390 | 0 |
| 2024 | 592 | 0 |
| 2025 | 499 | 0 |
| 2026 (through Aug 31, 2026) | 220 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Under the Net Billing Tariff (NEM 3.0)
994 of the 9,997 residential solar installs in Vista (9.9% of the 9,997 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 27, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Vista
| 1 | Sunrun | 306 | 0 | not recorded |
| 2 | Bright Planet Solar | 61 | 0 | not recorded |
| 3 | Aloha Solar Power | 58 | 0 | not recorded |
| 4 | Freedom Solar Co | 45 | 0 | not recorded |
| 5 | Baker Electric, Inc. | 44 | 0 | not recorded |
| 6 | Tesla Energy Operations (formerly SolarCity) | 31 | 0 | not recorded |
| 7 | Semper Solaris Construction Inc | 29 | 0 | not recorded |
| 8 | Stellar Solar | 24 | 0 | not recorded |
| 9 | Cosmic Solar, Inc. | 23 | 0 | not recorded |
| 10 | SOLARA HOME ENERGY LLC | 19 | 0 | not recorded |
| 11 | Jamar Power System | 14 | 0 | not recorded |
| 12 | New Era Electric | 12 | 0 | not recorded |
| 13 | Blalock electric | 11 | 0 | not recorded |
| 14 | Powur PBC (Powur Home) | 10 | 0 | not recorded |
| 15 | Solartech | 10 | 0 | not recorded |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 761 of Vista’s 882 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (174, 22.9%) used modules recorded as Qcells.
In the last 24 months, 882 of Vista’s 882 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (423, 48.0%) used inverters recorded as Tesla.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 174 | 1,812 |
| LONGi | 145 | 638 | |
| Silfab | 121 | 462 | |
| Canadian Solar | 51 | 407 | |
| HDHYUNDAIENERGYSOLUTIONSCO.,LTD. | 51 | not in top list | |
| Inverter maker | Tesla | 423 | 526 |
| Enphase | 253 | 3,504 | |
| SolarEdge | 218 | 3,659 | |
| Delta Electronics | 14 | 171 | |
| YottaEnergy,Inc | 11 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 9,046 of 9,997 installs, inverters on 9,736. See the methodology and the equipment index.
ZIP codes in Vista
ZIP codes with their own page where the utilities recorded Vista on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Vista
The SGIP report lists 376 battery storage projects with the city Vista, 219 with the status Paid ($2,135,840 in current incentive allocations, 5,252 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 219 | 5,252 | $2,135,840 |
| PBI in Process | 4 | 3,015 | $867,351 |
| Reserved | 27 | 930 | $755,417 |
| Waitlist | 6 | 98 | $126,353 |
| Cancelled | 120 | 16,679 | $5,072,799 |
Installers named on the most SGIP storage projects in Vista
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 61 | 45 |
| Sunrun | 48 | 22 |
| HAVEN ENERGY SERVICES INC | 21 | 11 |
| Solare Energy, Inc | 19 | 15 |
| Sullivan Solar Power | 13 | 13 |
| Stellar Solar | 10 | 10 |
| TMAG INDUSTRIES INC | 10 | 10 |
| SOLAR 4 AMERICA | 9 | 7 |
| APOLLO HOME POWER LLC | 8 | 2 |
| Powur PBC (Powur Home) | 8 | 1 |
83 of the 376 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Vista is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 9,997
- Last 24 months
- 882
- Capacity
- 61.7 MW DC
- Median system size
- 5.4 kW DC
- With battery storage
- not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 32.5% where reported
- Ownership types recorded
- PPA 2,350, lease 379, prepaid lease 13, other 116
- Earliest install in data
- Sep 20, 2000
Common questions
How many homes in Vista have solar?
9,997 residential solar systems in Vista were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 882 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Vista?
135 installer names have at least one install interconnected in Vista in the last 24 months, and 624 appear in the full record.
How common are batteries with new solar in Vista?
Battery storage is not recorded on the solar installs interconnected in Vista: SDG&E files a battery as its own project record, not on the solar record.
How many solar installs in Vista are under NEM 3.0?
994 of the 9,997 residential solar installs in Vista (9.9% of the 9,997 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.