ALIVE Industries, Inc.

How many solar installs has ALIVE Industries, Inc. done in California, and which license number is on its installs?

ALIVE Industries, Inc. has 855 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Dec 26, 2013 to Aug 26, 2026), most of them in San Diego County (805), Orange County (29) and Riverside County (15). CSLB lists license 983966 (ALIVE INDUSTRIES INC) with status QUAL Bond SUSP in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
855
Last 24 months
122
Total capacity
6,864.4 kW DC
Median system size
6.8 kW DC
With battery storage
50.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 91.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.0% of 823 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
89 installs, latest Aug 26, 2026
Ownership types recorded
PPA 7, other 1
Median battery size
27 kWh (15 installs list a capacity)
First install
Dec 26, 2013
Latest install
Aug 26, 2026
Counties
5
Utilities
SDGE 825, SCE 30
CSLB license
983966

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
2014160
2015440
2016570
2017310
2018590
2019760
2020490
2021790
20221111
20231402
2024912
2025654
2026 (through Aug 31, 2026)366

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

89 of its 855 interconnected installs (10.5% of the 851 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09811.5%not counted
NEM 2.066478.0%8 (34.8%)
Net Billing Tariff8910.5%7 (100.0%)
Not recorded4

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 8 of ALIVE Industries, Inc.’s installs the utility recorded a third-party ownership type: PPA 7, lease 0, prepaid lease 0, other 1. Across all installers, 7 residential systems list a third-party owner name that matches ALIVE Industries, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
ALIVE Industries Inc7
Adam Hammill1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 111 of ALIVE Industries, Inc.’s 122 installs name a module maker in the “Generator Manufacturer” fields, and most of those (85, 76.6%) used modules recorded as Aptos Solar.

In the last 24 months, 118 of ALIVE Industries, Inc.’s 122 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (89, 75.4%) used inverters recorded as Tesla.

In the last 24 months, 11 of ALIVE Industries, Inc.’s 122 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (11, 100.0%) used batteries recorded as Tesla.

15 of 15 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar85226
Tesla12not in top list
Silfab6254
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.5not in top list
Qcells2not in top list
Inverter makerTesla89111
SolarEdge26701
Enphase323
SMA214
ChiliconPower,LLC115
Battery makerTesla1115

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 790 of 855 installs, inverters on 851. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ALIVE Industries, Inc. as developer on 179 battery storage projects and as installer on 179 (177 name it as both), 181 projects in all with 7,875 kWh of storage. 137 have the status Paid, with $1,825,711 in current incentive allocations. Applications were received from Nov 12, 2014 to Aug 25, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1374,092$1,825,711
Reserved8119$156,173
Pending Reservation126$26,309
Cancelled353,637$1,393,314

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage761,744$403,98065$342,200
Equity Resiliency612,059$1,724,65243$1,171,070
Large-Scale Storage313,860$1,027,79426$259,724
Residential Solar and Storage Equity - AB 20910158$204,8341$22,352
Residential Storage Equity113$9,8820$0
Not stated240$30,3652$30,365

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
983966ALIVE INDUSTRIES INC (Corporation)QUAL Bond SUSPB General Building Contractor; C-10 Electrical ContractorMay 28, 2013May 31, 2027755

License numbers are the ones the utilities recorded on the interconnection applications (756 of 855 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 983966. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ALIVE Industries, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County983966131720132548151311175

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego805
Orange29
Riverside15
Los Angeles5
San Bernardino1

Top cities

CityInstalls
Escondido272
San Diego141
San Marcos64
Vista46
Carlsbad39
Encinitas28
Valley Center27
Poway25
Oceanside24
La Jolla19
El Cajon16
Ramona14
Del Mar12
Fallbrook12
Rancho Santa Fe10

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALIVE Industries, Inc.825
ALIVE INDUSTRIES INC30

Common questions

Where does ALIVE Industries, Inc. install solar?

Its installs are spread across 5 counties. The most are in San Diego County (805 installs), followed by Orange County (29).

How often does ALIVE Industries, Inc. install batteries with solar?

50.0% of its interconnected solar installs include battery storage across all years, and 91.7% in the last 24 months (11 of 12). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ALIVE Industries, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

89 of its 855 interconnected installs (10.5% of the 851 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.