Solar installers in Valley Center, California
Most installs here are in San Diego County.
Who installs the most solar in Valley Center?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Valley Center are Sunrun (70), Freedom Solar Co (20) and Baker Electric, Inc. (17). They account for 107 of the 255 residential solar installs interconnected there in that window.
In all, 3,932 homes in Valley Center have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 58 installers with installs in this window. 21 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Cosmic Solar, Inc. | 512 | 512 |
| 2 | Sunrun | 374 | 374 |
| 3 | SunPower | 293 | 293 |
| 4 | Baker Electric, Inc. | 284 | 284 |
| 5 | Tesla Energy Operations (formerly SolarCity) | 179 | 179 |
| 6 | Solar Permit Specialists | 178 | 178 |
| 7 | Vivint Solar Developer, LLC | 127 | 127 |
| 8 | Swell Energy | 121 | 121 |
| 9 | Semper Solaris Construction Inc | 115 | 115 |
| 10 | GRID Alternatives | 79 | 79 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 605 | 0 |
| 2023 | 474 | 0 |
| 2024 | 148 | 0 |
| 2025 | 155 | 0 |
| 2026 (through Aug 31, 2026) | 64 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Under the Net Billing Tariff (NEM 3.0)
295 of the 3,932 residential solar installs in Valley Center (7.5% of the 3,932 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest was approved Aug 25, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Valley Center
| 1 | Sunrun | 94 | 0 | not recorded |
| 2 | Baker Electric, Inc. | 20 | 0 | not recorded |
| 3 | Cosmic Solar, Inc. | 20 | 0 | not recorded |
| 4 | Freedom Solar Co | 19 | 0 | not recorded |
| 5 | California Premier Solar | 12 | 0 | not recorded |
| 6 | Bright Planet Solar | 10 | 0 | not recorded |
| 7 | Semper Solaris Construction Inc | 7 | 0 | not recorded |
| 8 | Tesla Energy Operations (formerly SolarCity) | 7 | 0 | not recorded |
| 9 | GRID Alternatives | 5 | 0 | not recorded |
| 10 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 5 | 0 | not recorded |
| 11 | SunPower | 5 | 0 | not recorded |
| 12 | MY SMART HOUSE LLC | 4 | 0 | not recorded |
| 13 | PALOMAR SOLAR LTD | 4 | 0 | not recorded |
| 14 | V3 Electric | 4 | 0 | not recorded |
| 15 | Aloha Solar Power | 3 | 0 | not recorded |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 194 of Valley Center’s 255 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (85, 43.8%) used modules recorded as Qcells.
In the last 24 months, 255 of Valley Center’s 255 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (117, 45.9%) used inverters recorded as Tesla.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 85 | 654 |
| Canadian Solar | 26 | 131 | |
| LONGi | 22 | 168 | |
| Silfab | 16 | 94 | |
| JA Solar | 10 | not in top list | |
| Inverter maker | Tesla | 117 | 145 |
| Enphase | 96 | 1,407 | |
| SolarEdge | 52 | 1,001 | |
| SMA | 9 | 482 | |
| SunPower | 9 | 535 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,447 of 3,932 installs, inverters on 3,757. See the methodology and the equipment index.
ZIP codes in Valley Center
ZIP codes with their own page where the utilities recorded Valley Center on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 92082 | 3,931 | 3,935 | 255 |
SGIP battery storage projects in Valley Center
The SGIP report lists 531 battery storage projects with the city Valley Center, 321 with the status Paid ($4,921,147 in current incentive allocations, 7,929 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 321 | 7,929 | $4,921,147 |
| PBI in Process | 1 | 498 | $489,031 |
| Reserved | 26 | 5,572 | $3,869,336 |
| Pending Reservation | 1 | 26 | $3,480 |
| Waitlist | 1 | 15 | $34,764 |
| Cancelled | 180 | 8,402 | $5,816,371 |
| RRF Rejected | 1 | 13 | $1,740 |
Installers named on the most SGIP storage projects in Valley Center
| Installer | Projects | Paid |
|---|---|---|
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 136 | 71 |
| Semper Solaris Construction Inc | 64 | 49 |
| Solar Watt Solutions | 38 | 28 |
| Cosmic Solar, Inc. | 34 | 18 |
| GRID Alternatives | 30 | 8 |
| Solare Energy, Inc | 23 | 18 |
| Swell Energy | 18 | 4 |
| ALIVE Industries, Inc. | 15 | 11 |
| Sunrun | 14 | 7 |
| Sunvantage Solar | 9 | 5 |
84 of the 531 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 3,932
- Last 24 months
- 255
- Capacity
- 30.8 MW DC
- Median system size
- 7 kW DC
- With battery storage
- not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 20.1% where reported
- Ownership types recorded
- PPA 447, lease 158, prepaid lease 5, other 31
- Earliest install in data
- Aug 30, 2001
Common questions
How many homes in Valley Center have solar?
3,932 residential solar systems in Valley Center were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 255 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Valley Center?
58 installer names have at least one install interconnected in Valley Center in the last 24 months, and 366 appear in the full record.
How common are batteries with new solar in Valley Center?
Battery storage is not recorded on the solar installs interconnected in Valley Center: SDG&E files a battery as its own project record, not on the solar record.
How many solar installs in Valley Center are under NEM 3.0?
295 of the 3,932 residential solar installs in Valley Center (7.5% of the 3,932 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.