eAmerican Solar Company

How many solar installs has eAmerican Solar Company done in California, and which license number is on its installs?

eAmerican Solar Company has 107 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Aug 22, 2013 to Aug 4, 2026), most of them in San Diego County (100) and Orange County (7). CSLB lists license 1023998 (STRATA HOMES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
107
Last 24 months
6
Total capacity
625.1 kW DC
Median system size
5.1 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
3.2% of 62 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Aug 4, 2026
Ownership types recorded
PPA 2
First install
Aug 22, 2013
Latest install
Aug 4, 2026
Counties
2
Utilities
SDGE 107
CSLB license
1023998

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013100
2014270
2015190
2016110
201770
201860
201930
202010
202110
202220
2023140
202400
202540
2026 (through Aug 31, 2026)20

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 107 interconnected installs (2.8% of the 107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06157.0%not counted
NEM 2.04340.2%not recorded
Net Billing Tariff32.8%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of eAmerican Solar Company’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches eAmerican Solar Company exactly.

Third-party owner named on its installsInstalls
Crown Pines Group1
Dan Pines1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of eAmerican Solar Company’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used modules recorded as Canadian Solar.

In the last 24 months, 6 of eAmerican Solar Company’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar411
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.11
Qcells11
Inverter makerEnphase6107

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 106 of 107 installs, inverters on 107. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1023998STRATA HOMES INC (Corporation)CLEARB General Building ContractorFeb 23, 2017Feb 28, 202740

License numbers are the ones the utilities recorded on the interconnection applications (47 of 107 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1023998. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list eAmerican Solar Company’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020232025Total
unincorporated San Diego County1023998211116

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego100
Orange7

Top cities

CityInstalls
Escondido39
San Diego14
Poway11
Valley Center9
Oceanside7
Ramona6
Vista4
Carlsbad3
Lemon Grove2
Rancho Santa Fe2
San Marcos2
Alpine1
Bonita1
Borrego Springs1
Del Mar1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
eAmerican Solar Company107

Common questions

Where does eAmerican Solar Company install solar?

Its installs are spread across 2 counties. The most are in San Diego County (100 installs), followed by Orange County (7).

How often does eAmerican Solar Company install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many eAmerican Solar Company installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 107 interconnected installs (2.8% of the 107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.