Solar Watt Solutions

How many solar installs has Solar Watt Solutions done in California, and which license number is on its installs?

Solar Watt Solutions has 760 residential solar installs interconnected in California, active in the records from 2009 through 2023 (Nov 23, 2009 to Aug 21, 2023), most of them in San Diego County (648), Orange County (51) and Riverside County (34). The license number recorded on most of its installs, 952337, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
760
Last 24 months
0
Total capacity
4,886.8 kW DC
Median system size
5.9 kW DC
With battery storage
40.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.9% of 677 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 4, other 2
Median battery size
33.6 kWh (32 installs list a capacity)
First install
Nov 23, 2009
Latest install
Aug 21, 2023
Counties
7
Utilities
SDGE 680, SCE 80
CSLB license
952337

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201020
201180
2012100
2013200
2014360
2015460
2016810
2017470
20181043
20191021
20201150
20211202
20226524
202332
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 760 interconnected installs with a tariff recorded (760) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.018824.7%not counted
NEM 2.057275.3%32 (53.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 6 of Solar Watt Solutions’s installs the utility recorded a third-party ownership type: PPA 4, lease 0, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches Solar Watt Solutions exactly.

Third-party owner named on its installsInstalls
Kilowatt Systems, LLC3
PV Home PPA I, LLC2
PVHome PPA 1, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 715 of Solar Watt Solutions’ 760 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (212, 29.7%) used modules recorded as LG.

Across all years, 743 of Solar Watt Solutions’ 760 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (412, 55.5%) used inverters recorded as SolarEdge.

Across all years, 18 of Solar Watt Solutions’ 760 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (9, 50.0%) used batteries recorded as Enphase.

18 of 32 battery-paired PG&E and SCE installs (56.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0212
REC0186
SolarWorld090
Qcells065
Hyundai037
Inverter makerSolarEdge0412
Enphase0318
SMA010
SunPower05
Delta Electronics02
Battery makerEnphase09
Tesla05
LG04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 715 of 760 installs, inverters on 743. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Watt Solutions as developer on 367 battery storage projects and as installer on 390 (347 name it as both), 410 projects in all with 14,610 kWh of storage. 156 have the status Paid, with $4,503,869 in current incentive allocations. Applications were received from Jan 8, 2018 to Apr 5, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1565,029$4,503,869
PBI in Process1500$125,000
Cancelled2499,048$8,844,237
RRF Rejected434$6,700

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency36513,191$13,126,553126$4,367,379
Small Residential Storage27334$68,53122$57,187
Large-Scale Storage131,012$244,3638$79,303
Residential Storage Equity140$33,6600$0
Not stated434$6,7000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
952337Not found in the CSLB License Master file pulled Nov 4, 2026610

License numbers are the ones the utilities recorded on the interconnection applications (610 of 760 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Watt Solutions’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022Total
unincorporated San Diego County95233727182523194

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego648
Orange51
Riverside34
Los Angeles12
Ventura10
San Bernardino4
Kern1

Top cities

CityInstalls
Carlsbad153
San Diego103
Encinitas59
San Marcos52
Vista44
Oceanside43
Valley Center38
Escondido36
Fallbrook19
Rancho la Costa17
Murrieta13
Rancho Santa Fe11
San Clemente10
Cardiff9
La Jolla8

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Watt Solutions692
SOLAR WATT SOLUTIONS INC30
SOLAR WATT SOLUTIONS INC DBA WATT ELECTRIC AND CONSTRUCTION29
Solar Watt Solutions Inc6
Solar Watt Solutions, Inc.2
SOLAR WATT SOLUTIONS1

Common questions

Where does Solar Watt Solutions install solar?

Its installs are spread across 7 counties. The most are in San Diego County (648 installs), followed by Orange County (51).

How often does Solar Watt Solutions install batteries with solar?

40.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Solar Watt Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 760 interconnected installs with a tariff recorded (760) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.