California Premier Solar

How many solar installs has California Premier Solar done in California, and which license number is on its installs?

California Premier Solar has 1,087 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Feb 28, 2012 to Mar 2, 2026), most of them in San Diego County (1,046) and Orange County (41). The license number recorded on most of its installs, 970445, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,087
Last 24 months
148
Total capacity
6,676.9 kW DC
Median system size
5.4 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
2.7% of 910 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
180 installs, latest Mar 2, 2026
Ownership types recorded
lease 25
First install
Feb 28, 2012
Latest install
Mar 2, 2026
Counties
2
Utilities
SDGE 1,087
CSLB license
970445

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
2012240
2013560
2014660
2015940
2016800
2017540
2018650
2019910
2020950
20211010
2022810
2023970
2024460
20251330
2026 (through Aug 31, 2026)40

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

180 of its 1,087 interconnected installs (16.6% of the 1,087 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Mar 2, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.028626.3%not counted
NEM 2.062157.1%not recorded
Net Billing Tariff18016.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 25 of California Premier Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 25, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches California Premier Solar exactly.

Third-party owner named on its installsInstalls
California Premier S25

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 136 of California Premier Solar’s 148 installs name a module maker in the “Generator Manufacturer” fields, and most of those (101, 74.3%) used modules recorded as Qcells.

In the last 24 months, 148 of California Premier Solar’s 148 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (112, 75.7%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells101108
LONGi2323
Waaree697
SunPower3752
Canadian Solar1not in top list
Inverter makerEnphase112231
Tesla3944
SunPower4545
EG41not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,007 of 1,087 installs, inverters on 1,058. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970445Not found in the CSLB License Master file pulled Nov 4, 2026812

License numbers are the ones the utilities recorded on the interconnection applications (812 of 1,087 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list California Premier Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
unincorporated San Diego County9704453317113330262717194

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego1,046
Orange41

Top cities

CityInstalls
San Diego363
Escondido170
Oceanside78
Poway58
Carlsbad51
San Marcos37
Vista35
Rancho Santa Fe31
Encinitas29
Chula Vista27
Santee22
La Jolla21
Valley Center18
Cardiff17
Ramona14

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
California Premier Solar1,087

Common questions

Where does California Premier Solar install solar?

Its installs are spread across 2 counties. The most are in San Diego County (1,046 installs), followed by Orange County (41).

How often does California Premier Solar install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many California Premier Solar installs are under NEM 3.0 (the Net Billing Tariff)?

180 of its 1,087 interconnected installs (16.6% of the 1,087 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.