CALIFORNIA PREMIER SOLAR CONSTRUCTION

How many solar installs has CALIFORNIA PREMIER SOLAR CONSTRUCTION done in California, and which license number is on its installs?

CALIFORNIA PREMIER SOLAR CONSTRUCTION has 73 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jul 24, 2015 to Jul 1, 2026), most of them in San Bernardino County (45), Riverside County (13) and Orange County (10). The license number recorded on most of its installs, 970445, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
73
Last 24 months
36
Total capacity
355.7 kW DC
Median system size
3.3 kW DC
With battery storage
12.3% all time; 19.4% last 24 months
Third-party owned
1.4% of 73 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
37 installs, latest Jul 1, 2026
Ownership types recorded
lease 1
Median battery size
13.5 kWh (9 installs list a capacity)
First install
Jul 24, 2015
Latest install
Jul 1, 2026
Counties
4
Utilities
SCE 73
CSLB license
970445

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
201620
201700
201800
201900
202000
2021110
2022140
202350
202453
2025323
2026 (through Aug 31, 2026)33

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

37 of its 73 interconnected installs (50.7% of the 73 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 18.9% of those include battery storage. The latest Net Billing Tariff install was approved Jul 1, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.034.1%not counted
NEM 2.03345.2%2 (6.1%)
Net Billing Tariff3750.7%7 (18.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of CALIFORNIA PREMIER SOLAR CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches CALIFORNIA PREMIER SOLAR CONSTRUCTION exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
California Premier Solar Construction1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 36 of CALIFORNIA PREMIER SOLAR CONSTRUCTION’s 36 installs name a module maker in the “Generator Manufacturer” fields, and most of those (28, 77.8%) used modules recorded as Qcells.

In the last 24 months, 36 of CALIFORNIA PREMIER SOLAR CONSTRUCTION’s 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (24, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 7 of CALIFORNIA PREMIER SOLAR CONSTRUCTION’s 36 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as Tesla.

9 of 9 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2828
SunPower732
LONGi11
Inverter makerEnphase2433
SunPower612
Tesla66
Battery makerTesla78

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 68 of 73 installs, inverters on 73. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970445Not found in the CSLB License Master file pulled Nov 4, 202673

License numbers are the ones the utilities recorded on the interconnection applications (73 of 73 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list CALIFORNIA PREMIER SOLAR CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
unincorporated San Diego County9704453317113330262717194

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino45
Riverside13
Orange10
Los Angeles5

Top cities

CityInstalls
Redlands24
Yucca Valley20
Temecula11
Irvine5
Mission Viejo2
Beaumont1
Laguna Beach1
Lake Forest1
Lakewood1
Palm Springs1
Palos Verdes Peninsula1
Rancho Palos Verdes1
Valencia1
Villa Park1
Whittier1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALIFORNIA PREMIER SOLAR CONSTRUCTION70
California Premier Solar Construction3

Common questions

Where does CALIFORNIA PREMIER SOLAR CONSTRUCTION install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (45 installs), followed by Riverside County (13).

How often does CALIFORNIA PREMIER SOLAR CONSTRUCTION install batteries with solar?

12.3% of its interconnected solar installs include battery storage across all years, and 19.4% in the last 24 months (7 of 36).

How many CALIFORNIA PREMIER SOLAR CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

37 of its 73 interconnected installs (50.7% of the 73 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 18.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.