Solar installers in Lake Forest, California

Most installs here are in Orange County.

Who installs the most solar in Lake Forest?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Lake Forest are Sunrun (203), Tesla Energy Operations (formerly SolarCity) (77) and ORANGE COUNTY CONTRACTING SERVICES (37). They account for 317 of the 536 residential solar installs interconnected there in that window.

In all, 4,828 homes in Lake Forest have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 80 installers with installs in this window. 6 installs in the window were self-installed or had no installer recorded.

1Sunrun203604
2Tesla Energy Operations (formerly SolarCity)77772
3ORANGE COUNTY CONTRACTING SERVICES3773
4FREEDOM FOREVER LLC2678
5SunPower13821
6CE ENERGY SERVICES INC1111
7INFINITY SOLAR821
8Solar Optimum Inc.852
9AXIA SOLAR CORP66
10BRIGHT OPS69
11NRG Clean Power617
12Aikyum Solar514
13NLITN energy solutions55
14STELLAR SOLAR ELECTRIC56
15AMECO SOLAR LLC413
16BAKER HOME ENERGY44
17Empower Electric Solar412
18FREEDOM FOREVER SOUTHERN CALIFORNIA LLC44
19LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC44
20SOLAR TECH ENERGY SYSTEMS INC420
21SolarMax Renewable Energy Provider, Inc452
22Cira Energy335
23CLEAN-POWER2N33
24EL-FI HOMES LLC33
25MCCORMACK ROOFING & SOLAR INC33

Most installs, all time

1SunPower821821
2Tesla Energy Operations (formerly SolarCity)772772
3Sunrun604604
4Vivint Solar Developer, LLC306306
5SUNNOVA ENERGY CORPORATION119119
6SunStreet Energy Group LLC114114
7FREEDOM FOREVER LLC7878
8ORANGE COUNTY CONTRACTING SERVICES7373
9Bright Planet Solar5757
10Solar Optimum Inc.5252

Installs by year

YearInstalls interconnectedWith battery storage
202275494
2023875104
2024345158
2025289256
2026 (through Aug 31, 2026)174143

Under the Net Billing Tariff (NEM 3.0)

594 of the 4,828 residential solar installs in Lake Forest (12.3% of the 4,828 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The latest was approved Aug 27, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Lake Forest

1Sunrun24419881.1%
2Tesla Energy Operations (formerly SolarCity)686494.1%
3ORANGE COUNTY CONTRACTING SERVICES3434100.0%
4FREEDOM FOREVER LLC333193.9%
5CE ENERGY SERVICES INC1111100.0%
6INFINITY SOLAR1010100.0%
7SunPower10990.0%
8BRIGHT OPS99100.0%
9Solar Optimum Inc.88100.0%
10AXIA SOLAR CORP66100.0%
11Empower Electric Solar55100.0%
12NLITN energy solutions55100.0%
13SOLAR TECH ENERGY SYSTEMS INC55100.0%
14Cira Energy4250.0%
15FREEDOM FOREVER SOUTHERN CALIFORNIA LLC44100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 532 of Lake Forest’s 536 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (224, 42.1%) used modules recorded as Qcells.

In the last 24 months, 536 of Lake Forest’s 536 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (289, 53.9%) used inverters recorded as Tesla.

In the last 24 months, 441 of Lake Forest’s 536 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (362, 82.1%) used batteries recorded as Tesla.

856 of 897 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells224904
JA Solar58203
LONGi57214
Silfab56not in top list
REC38212
Inverter makerTesla289376
Enphase1481,542
SolarEdge1101,563
SunPower14505
Delta Electronics11129
Battery makerTesla362596
Enphase3680
SolarEdge2035
FranklinWH1313
LG5100

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,012 of 4,828 installs, inverters on 4,828. See the methodology and the equipment index.

ZIP codes in Lake Forest

ZIP codes with their own page where the utilities recorded Lake Forest on at least 10% of the ZIP’s installs, through Aug 31, 2026.

926304,5354,538470
9261018585387

SGIP battery storage projects in Lake Forest

The SGIP report lists 168 battery storage projects with the city Lake Forest, 101 with the status Paid ($5,843,880 in current incentive allocations, 8,647 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid1018,647$5,843,880
Reserved171,571$569,736
Pending Reservation340$64,575
Cancelled404,659$2,600,909
RRF Rejected780$12,564

Installers named on the most SGIP storage projects in Lake Forest

InstallerProjectsPaid
Sunrun4124
Solar Optimum Inc.139
SunPower107
Tesla108
Tesla Energy Operations (formerly SolarCity)109
Semper Solaris Construction Inc96
ORANGE COUNTY CONTRACTING SERVICES73
Orange County Solar63
Vivint Solar Developer, LLC50
LA Solar Group44

21 of the 168 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Lake Forest is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
4,828
Last 24 months
536
Capacity
30.6 MW DC
Median system size
5.5 kW DC
With battery storage
18.6% all time; 84.0% last 24 months
Third-party owned
34.4% where reported
Ownership types recorded
PPA 1,142, lease 338, prepaid lease 3, other 43
Median battery size
13.5 kWh
Earliest install in data
Apr 11, 2002

Common questions

How many homes in Lake Forest have solar?

4,828 residential solar systems in Lake Forest were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 536 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Lake Forest?

80 installer names have at least one install interconnected in Lake Forest in the last 24 months, and 439 appear in the full record.

How common are batteries with new solar in Lake Forest?

18.6% of the solar installs interconnected in Lake Forest include battery storage across all years, and 84.0% in the last 24 months (450 of 536).

How many solar installs in Lake Forest are under NEM 3.0?

594 of the 4,828 residential solar installs in Lake Forest (12.3% of the 4,828 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.