How many solar installs has Orange County Solar done in California, and which license number is on its installs?

Orange County Solar has 364 residential solar installs interconnected in California, active in the records from 2017 through 2026 (May 5, 2017 to Aug 20, 2026), most of them in Orange County (233), San Diego County (130) and Los Angeles County (1). CSLB lists license 1023627 (ORANGE COUNTY CONTRACTING SERVICES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
364
Last 24 months
130
Total capacity
2,845.1 kW DC
Median system size
7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
3.6% of 364 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
154 installs, latest Aug 20, 2026
Ownership types recorded
PPA 11, lease 2
First install
May 5, 2017
Latest install
Aug 20, 2026
Counties
3
Utilities
SDGE 360, SCE 4
CSLB license
1023627

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201760
2018200
2019320
2020220
2021230
2022300
2023700
2024410
2025720
2026 (through Aug 31, 2026)480

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

154 of its 364 interconnected installs (42.3% of the 364 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020.5%not counted
NEM 2.020857.1%0 (0.0%)
Net Billing Tariff15442.3%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 13 of Orange County Solar’s installs the utility recorded a third-party ownership type: PPA 11, lease 2, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches Orange County Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
OC Solar9
Orange County Solar2
ORANGE COUNTY CONTRA1
Vincent Curcie1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 125 of Orange County Solar’s 130 installs name a module maker in the “Generator Manufacturer” fields, and most of those (68, 54.4%) used modules recorded as Qcells.

In the last 24 months, 130 of Orange County Solar’s 130 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (118, 90.8%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells6877
Panasonic19196
REC1515
Aptos Solar6not in top list
JA Solar5not in top list
Inverter makerTesla118157
Enphase5105
Panasonic55
SMA22
GE Energy1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 352 of 364 installs, inverters on 364. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Orange County Solar as developer on 0 battery storage projects and as installer on 187 (0 name it as both), 187 projects in all with 3,727 kWh of storage. 98 have the status Paid, with $344,132 in current incentive allocations. Applications were received from Nov 12, 2018 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid982,149$344,132
Reserved28451$137,850
Pending Reservation126$3,960
Cancelled561,048$177,064
RRF Rejected453$7,920

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1583,057$402,05892$233,710
Large-Scale Storage16388$78,8782$24,879
Equity Resiliency8214$155,3434$85,543
Residential Solar and Storage Equity - AB 209 Non-POU115$26,7270$0
Not stated453$7,9200$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1023627ORANGE COUNTY CONTRACTING SERVICES (Corporation)CLEAR, Class Removal PendingB General Building Contractor; C-10 Electrical ContractorFeb 10, 2017Feb 28, 2027362

License numbers are the ones the utilities recorded on the interconnection applications (364 of 364 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending classification removal date of Nov 30, 2026 for license 1023627. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list Orange County Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222023202420252026Total
unincorporated San Diego County10236271124513

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange233
San Diego130
Los Angeles1

Top cities

CityInstalls
Laguna Niguel60
San Clemente43
Ladera Ranch37
Laguna Hills36
Mission Viejo34
San Juan Capo31
San Diego23
Dana Point19
Rch Msn Viejo18
Coto de Caza13
Chula Vista7
Escondido6
Las Flores6
Carlsbad5
Oceanside5

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Orange County Solar350
Orange County Solar Inc12
orange county solar1
Orange County Solar, INc.1

Common questions

Where does Orange County Solar install solar?

Its installs are spread across 3 counties. The most are in Orange County (233 installs), followed by San Diego County (130).

How often does Orange County Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Orange County Solar installs are under NEM 3.0 (the Net Billing Tariff)?

154 of its 364 interconnected installs (42.3% of the 364 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources