ORANGE COUNTY SOLAR CONTRACTING SERVICES INC

How many solar installs has ORANGE COUNTY SOLAR CONTRACTING SERVICES INC done in California, and which license number is on its installs?

ORANGE COUNTY SOLAR CONTRACTING SERVICES INC has 233 residential solar installs interconnected in California, active in the records from 2017 through 2023 (Apr 27, 2017 to Jul 20, 2023), most of them in Orange County (172), Los Angeles County (39) and San Bernardino County (13). CSLB lists license 1023627 (ORANGE COUNTY CONTRACTING SERVICES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
233
Last 24 months
0
Total capacity
2,077.4 kW DC
Median system size
7.9 kW DC
With battery storage
4.3% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 233 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
9.8 kWh (10 installs list a capacity)
First install
Apr 27, 2017
Latest install
Jul 20, 2023
Counties
4
Utilities
SCE 233
CSLB license
1023627

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017150
2018395
2019411
20201123
2021131
202200
2023130
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 233 interconnected installs with a tariff recorded (233) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.083.4%not counted
NEM 2.022596.6%10 (4.4%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ORANGE COUNTY SOLAR CONTRACTING SERVICES INC’s installs. No residential system in the file lists a third-party owner name that matches ORANGE COUNTY SOLAR CONTRACTING SERVICES INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 233 of ORANGE COUNTY SOLAR CONTRACTING SERVICES INC’s 233 installs name a module maker in the “Generator Manufacturer” fields, and most of those (160, 68.7%) used modules recorded as Panasonic.

Across all years, 233 of ORANGE COUNTY SOLAR CONTRACTING SERVICES INC’s 233 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (150, 64.4%) used inverters recorded as SolarEdge.

Across all years, 10 of ORANGE COUNTY SOLAR CONTRACTING SERVICES INC’s 233 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 100.0%) used batteries recorded as LG.

10 of 10 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic0160
Qcells037
LG031
Canadian Solar05
Inverter makerSolarEdge0150
Enphase070
SunPower010
Delta Electronics01
Growatt01
Battery makerLG010

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 233 of 233 installs, inverters on 233. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ORANGE COUNTY SOLAR CONTRACTING SERVICES INC as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 8 kWh of storage. 1 have the status Paid, with $2,099 in current incentive allocations. Applications were received from Apr 24, 2019 to Apr 24, 2019.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid18$2,099

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage18$2,0991$2,099

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1023627ORANGE COUNTY CONTRACTING SERVICES (Corporation)CLEAR, Class Removal PendingB General Building Contractor; C-10 Electrical ContractorFeb 10, 2017Feb 28, 2027233

License numbers are the ones the utilities recorded on the interconnection applications (233 of 233 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending classification removal date of Nov 30, 2026 for license 1023627. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list ORANGE COUNTY SOLAR CONTRACTING SERVICES INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222023202420252026Total
unincorporated San Diego County10236271124513

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange172
Los Angeles39
San Bernardino13
Riverside9

Top cities

CityInstalls
Yorba Linda24
Orange19
Huntington Beach16
Irvine14
Santa Ana13
Tustin8
Lake Forest7
Fullerton6
Garden Grove6
Mission Viejo6
Buena Park5
Cerritos5
Long Beach5
Costa Mesa4
Fountain Valley4

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ORANGE COUNTY SOLAR CONTRACTING SERVICES INC219
orange county solar, contracting services inc.8
Orange county solar, contracting services inc.2
Orange County Solar, Contracting Services INC.2
orange county solar, Contracting Services Inc.1
Orange County Solar, contracting services inc.1

Common questions

Where does ORANGE COUNTY SOLAR CONTRACTING SERVICES INC install solar?

Its installs are spread across 4 counties. The most are in Orange County (172 installs), followed by Los Angeles County (39).

How often does ORANGE COUNTY SOLAR CONTRACTING SERVICES INC install batteries with solar?

4.3% of its interconnected solar installs include battery storage across all years.

How many ORANGE COUNTY SOLAR CONTRACTING SERVICES INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 233 interconnected installs with a tariff recorded (233) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.