Solar installers in Garden Grove, California

Most installs here are in Orange County.

Who installs the most solar in Garden Grove?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Garden Grove are Sunrun (147), SWSS ELECTRICAL (90) and ECOSOLAR USA ELECTRICAL LLC (79). They account for 316 of the 914 residential solar installs interconnected there in that window.

In all, 5,231 homes in Garden Grove have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 133 installers with installs in this window. 62 installs in the window were self-installed or had no installer recorded.

1Sunrun147464
2SWSS ELECTRICAL90384
3ECOSOLAR USA ELECTRICAL LLC79252
4BRIGHT OPS6062
5FREEDOM FOREVER LLC32120
6OCP SOLAR ELECTRICAL SERVICES3232
7US BUILDER GROUP INC DBA SOLARTIME ELECTRICAL SERVICES28135
8Tesla Energy Operations (formerly SolarCity)26595
9SOLARA HOME ENERGY LLC2525
10ESSENTIAL DESIGN INNOVATOR INC1824
11IMPACT SOLAR ENERGY LLC1414
12ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING1138
13OC BUILDER ONE1111
14ORANGE COUNTY CONTRACTING SERVICES1133
15SunPower1171
16INFINITY SOLAR1021
17ARRAY ENERGY CORP99
18SOLAR TECH ENERGY SYSTEMS INC917
19SOUTH WEST BUILDERS911
20LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC89
21Solar Optimum Inc.731
22FREEDOM FOREVER SOUTHERN CALIFORNIA LLC66
23Semper Solaris Construction Inc661
24TITANIUM SOLAR LLC619
25Aikyum Solar516

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)595595
2Sunrun464464
3SWSS ELECTRICAL384384
4ECOSOLAR USA ELECTRICAL LLC252252
5Southwest Sun Solar246246
6Vivint Solar Developer, LLC237237
7US BUILDER GROUP INC DBA SOLARTIME ELECTRICAL SERVICES135135
8FREEDOM FOREVER LLC120120
9Bright Planet Solar7272
10SunPower7171

Installs by year

YearInstalls interconnectedWith battery storage
202252343
2023884101
2024451193
2025415222
2026 (through Aug 31, 2026)339180

Under the Net Billing Tariff (NEM 3.0)

1,189 of the 5,231 residential solar installs in Garden Grove (22.7% of the 5,231 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.5% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Garden Grove

1Sunrun17817497.8%
2SWSS ELECTRICAL1484832.4%
3ECOSOLAR USA ELECTRICAL LLC1001010.0%
4BRIGHT OPS625995.2%
5US BUILDER GROUP INC DBA SOLARTIME ELECTRICAL SERVICES4700.0%
6Tesla Energy Operations (formerly SolarCity)443784.1%
7FREEDOM FOREVER LLC403690.0%
8OCP SOLAR ELECTRICAL SERVICES3200.0%
9SOLARA HOME ENERGY LLC2500.0%
10ESSENTIAL DESIGN INNOVATOR INC2300.0%
11ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING151493.3%
12Bright Planet Solar14964.3%
13IMPACT SOLAR ENERGY LLC1400.0%
14INFINITY SOLAR14964.3%
15SunPower14321.4%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 910 of Garden Grove’s 914 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (274, 30.1%) used modules recorded as Qcells.

In the last 24 months, 914 of Garden Grove’s 914 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (471, 51.5%) used inverters recorded as Enphase.

In the last 24 months, 463 of Garden Grove’s 914 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (269, 58.1%) used batteries recorded as Tesla.

800 of 826 battery-paired PG&E and SCE installs (96.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2741,044
JA Solar91192
LONGi90218
Silfab70not in top list
Hyundai69247
Inverter makerEnphase4712,055
Tesla240342
SolarEdge1571,469
Aptos Solar24not in top list
Delta Electronics10108
Battery makerTesla269420
Enphase87133
SolarEdge7695
LG20131
FranklinWH79

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,598 of 5,231 installs, inverters on 5,230. See the methodology and the equipment index.

ZIP codes in Garden Grove

ZIP codes with their own page where the utilities recorded Garden Grove on at least 10% of the ZIP’s installs, through Aug 31, 2026.

928401,6481,648303
928411,1921,195199
928431,0281,032208
92845878878118
9284447647685

SGIP battery storage projects in Garden Grove

The SGIP report lists 144 battery storage projects with the city Garden Grove, 63 with the status Paid ($742,989 in current incentive allocations, 2,129 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid632,129$742,989
Reserved192,792$1,108,607
Pending Reservation9724$2,830,100
Waitlist3640$1,006,099
Cancelled481,921$713,539
RRF Rejected235$4,604

Installers named on the most SGIP storage projects in Garden Grove

InstallerProjectsPaid
Sunrun3917
Semper Solaris Construction Inc1513
Vivint Solar Developer, LLC92
Solar Optimum Inc.63
SolarMax Renewable Energy Provider, Inc63
Tesla65
HAVEN ENERGY SERVICES INC50
ORANGE COUNTY CONTRACTING SERVICES50
Orange County Solar50
SunPower41

19 of the 144 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
5,231
Last 24 months
914
Capacity
33.4 MW DC
Median system size
5.7 kW DC
With battery storage
15.8% all time; 52.2% last 24 months
Third-party owned
37.4% where reported
Ownership types recorded
PPA 1,451, lease 309, prepaid lease 5, other 86
Median battery size
13.5 kWh
Earliest install in data
Jul 11, 2001

Common questions

How many homes in Garden Grove have solar?

5,231 residential solar systems in Garden Grove were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 914 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Garden Grove?

133 installer names have at least one install interconnected in Garden Grove in the last 24 months, and 586 appear in the full record.

How common are batteries with new solar in Garden Grove?

15.8% of the solar installs interconnected in Garden Grove include battery storage across all years, and 52.2% in the last 24 months (477 of 914).

How many solar installs in Garden Grove are under NEM 3.0?

1,189 of the 5,231 residential solar installs in Garden Grove (22.7% of the 5,231 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.