Solar installers in Garden Grove, California
Most installs here are in Orange County.
Who installs the most solar in Garden Grove?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Garden Grove are Sunrun (147), SWSS ELECTRICAL (90) and ECOSOLAR USA ELECTRICAL LLC (79). They account for 316 of the 914 residential solar installs interconnected there in that window.
In all, 5,231 homes in Garden Grove have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 133 installers with installs in this window. 62 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 147 | 464 |
| 2 | SWSS ELECTRICAL | 90 | 384 |
| 3 | ECOSOLAR USA ELECTRICAL LLC | 79 | 252 |
| 4 | BRIGHT OPS | 60 | 62 |
| 5 | FREEDOM FOREVER LLC | 32 | 120 |
| 6 | OCP SOLAR ELECTRICAL SERVICES | 32 | 32 |
| 7 | US BUILDER GROUP INC DBA SOLARTIME ELECTRICAL SERVICES | 28 | 135 |
| 8 | Tesla Energy Operations (formerly SolarCity) | 26 | 595 |
| 9 | SOLARA HOME ENERGY LLC | 25 | 25 |
| 10 | ESSENTIAL DESIGN INNOVATOR INC | 18 | 24 |
| 11 | IMPACT SOLAR ENERGY LLC | 14 | 14 |
| 12 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 11 | 38 |
| 13 | OC BUILDER ONE | 11 | 11 |
| 14 | ORANGE COUNTY CONTRACTING SERVICES | 11 | 33 |
| 15 | SunPower | 11 | 71 |
| 16 | INFINITY SOLAR | 10 | 21 |
| 17 | ARRAY ENERGY CORP | 9 | 9 |
| 18 | SOLAR TECH ENERGY SYSTEMS INC | 9 | 17 |
| 19 | SOUTH WEST BUILDERS | 9 | 11 |
| 20 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 8 | 9 |
| 21 | Solar Optimum Inc. | 7 | 31 |
| 22 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 6 | 6 |
| 23 | Semper Solaris Construction Inc | 6 | 61 |
| 24 | TITANIUM SOLAR LLC | 6 | 19 |
| 25 | Aikyum Solar | 5 | 16 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 595 | 595 |
| 2 | Sunrun | 464 | 464 |
| 3 | SWSS ELECTRICAL | 384 | 384 |
| 4 | ECOSOLAR USA ELECTRICAL LLC | 252 | 252 |
| 5 | Southwest Sun Solar | 246 | 246 |
| 6 | Vivint Solar Developer, LLC | 237 | 237 |
| 7 | US BUILDER GROUP INC DBA SOLARTIME ELECTRICAL SERVICES | 135 | 135 |
| 8 | FREEDOM FOREVER LLC | 120 | 120 |
| 9 | Bright Planet Solar | 72 | 72 |
| 10 | SunPower | 71 | 71 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 523 | 43 |
| 2023 | 884 | 101 |
| 2024 | 451 | 193 |
| 2025 | 415 | 222 |
| 2026 (through Aug 31, 2026) | 339 | 180 |
Under the Net Billing Tariff (NEM 3.0)
1,189 of the 5,231 residential solar installs in Garden Grove (22.7% of the 5,231 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.5% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Garden Grove
| 1 | Sunrun | 178 | 174 | 97.8% |
| 2 | SWSS ELECTRICAL | 148 | 48 | 32.4% |
| 3 | ECOSOLAR USA ELECTRICAL LLC | 100 | 10 | 10.0% |
| 4 | BRIGHT OPS | 62 | 59 | 95.2% |
| 5 | US BUILDER GROUP INC DBA SOLARTIME ELECTRICAL SERVICES | 47 | 0 | 0.0% |
| 6 | Tesla Energy Operations (formerly SolarCity) | 44 | 37 | 84.1% |
| 7 | FREEDOM FOREVER LLC | 40 | 36 | 90.0% |
| 8 | OCP SOLAR ELECTRICAL SERVICES | 32 | 0 | 0.0% |
| 9 | SOLARA HOME ENERGY LLC | 25 | 0 | 0.0% |
| 10 | ESSENTIAL DESIGN INNOVATOR INC | 23 | 0 | 0.0% |
| 11 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 15 | 14 | 93.3% |
| 12 | Bright Planet Solar | 14 | 9 | 64.3% |
| 13 | IMPACT SOLAR ENERGY LLC | 14 | 0 | 0.0% |
| 14 | INFINITY SOLAR | 14 | 9 | 64.3% |
| 15 | SunPower | 14 | 3 | 21.4% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 910 of Garden Grove’s 914 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (274, 30.1%) used modules recorded as Qcells.
In the last 24 months, 914 of Garden Grove’s 914 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (471, 51.5%) used inverters recorded as Enphase.
In the last 24 months, 463 of Garden Grove’s 914 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (269, 58.1%) used batteries recorded as Tesla.
800 of 826 battery-paired PG&E and SCE installs (96.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 274 | 1,044 |
| JA Solar | 91 | 192 | |
| LONGi | 90 | 218 | |
| Silfab | 70 | not in top list | |
| Hyundai | 69 | 247 | |
| Inverter maker | Enphase | 471 | 2,055 |
| Tesla | 240 | 342 | |
| SolarEdge | 157 | 1,469 | |
| Aptos Solar | 24 | not in top list | |
| Delta Electronics | 10 | 108 | |
| Battery maker | Tesla | 269 | 420 |
| Enphase | 87 | 133 | |
| SolarEdge | 76 | 95 | |
| LG | 20 | 131 | |
| FranklinWH | 7 | 9 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,598 of 5,231 installs, inverters on 5,230. See the methodology and the equipment index.
ZIP codes in Garden Grove
ZIP codes with their own page where the utilities recorded Garden Grove on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Garden Grove
The SGIP report lists 144 battery storage projects with the city Garden Grove, 63 with the status Paid ($742,989 in current incentive allocations, 2,129 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 63 | 2,129 | $742,989 |
| Reserved | 19 | 2,792 | $1,108,607 |
| Pending Reservation | 9 | 724 | $2,830,100 |
| Waitlist | 3 | 640 | $1,006,099 |
| Cancelled | 48 | 1,921 | $713,539 |
| RRF Rejected | 2 | 35 | $4,604 |
Installers named on the most SGIP storage projects in Garden Grove
19 of the 144 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 5,231
- Last 24 months
- 914
- Capacity
- 33.4 MW DC
- Median system size
- 5.7 kW DC
- With battery storage
- 15.8% all time; 52.2% last 24 months
- Third-party owned
- 37.4% where reported
- Ownership types recorded
- PPA 1,451, lease 309, prepaid lease 5, other 86
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jul 11, 2001
Common questions
How many homes in Garden Grove have solar?
5,231 residential solar systems in Garden Grove were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 914 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Garden Grove?
133 installer names have at least one install interconnected in Garden Grove in the last 24 months, and 586 appear in the full record.
How common are batteries with new solar in Garden Grove?
15.8% of the solar installs interconnected in Garden Grove include battery storage across all years, and 52.2% in the last 24 months (477 of 914).
How many solar installs in Garden Grove are under NEM 3.0?
1,189 of the 5,231 residential solar installs in Garden Grove (22.7% of the 5,231 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.