ESSENTIAL DESIGN INNOVATOR INC

How many solar installs has ESSENTIAL DESIGN INNOVATOR INC done in California, and which license number is on its installs?

ESSENTIAL DESIGN INNOVATOR INC has 45 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Apr 12, 2023 to Jun 12, 2026), most of them in Orange County (44) and Los Angeles County (1). CSLB lists license 1042417 (ESSENTIAL DESIGN INNOVATOR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
45
Last 24 months
27
Total capacity
197.8 kW DC
Median system size
4 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 45 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
43 installs, latest Jun 12, 2026
Ownership types recorded
none recorded
First install
Apr 12, 2023
Latest install
Jun 12, 2026
Counties
2
Utilities
SCE 45
CSLB license
1042417

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
202380
2024150
202590
2026 (through Aug 31, 2026)130

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

43 of its 45 interconnected installs (95.6% of the 45 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.024.4%0 (0.0%)
Net Billing Tariff4395.6%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ESSENTIAL DESIGN INNOVATOR INC’s installs. No residential system in the file lists a third-party owner name that matches ESSENTIAL DESIGN INNOVATOR INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 27 of ESSENTIAL DESIGN INNOVATOR INC’s 27 installs name a module maker in the “Generator Manufacturer” fields, and most of those (17, 63.0%) used modules recorded as Qcells.

In the last 24 months, 27 of ESSENTIAL DESIGN INNOVATOR INC’s 27 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 96.3%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1735
G-Star88
Canadian Solar11
United Renewable Energy11
Inverter makerEnphase2638
SolarEdge12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 45 of 45 installs, inverters on 45. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1042417ESSENTIAL DESIGN INNOVATOR INC (Corporation)CLEARB General Building ContractorJul 30, 2018Jul 31, 202845

License numbers are the ones the utilities recorded on the interconnection applications (45 of 45 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1042417. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Orange44
Los Angeles1

Top cities

CityInstalls
Garden Grove24
Fountain Valley9
Westminster5
Santa Ana3
Huntington Beach1
Long Beach1
Midway City1
Orange1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ESSENTIAL DESIGN INNOVATOR INC45

Common questions

Where does ESSENTIAL DESIGN INNOVATOR INC install solar?

Its installs are spread across 2 counties. The most are in Orange County (44 installs), followed by Los Angeles County (1).

How often does ESSENTIAL DESIGN INNOVATOR INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 27).

How many ESSENTIAL DESIGN INNOVATOR INC installs are under NEM 3.0 (the Net Billing Tariff)?

43 of its 45 interconnected installs (95.6% of the 45 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.