Home solar in ZIP code 92841, California
Service city recorded on most installs: Garden Grove. County: Orange County.
How many homes in ZIP code 92841 have solar?
PG&E, SCE and SDG&E interconnected 1,195 residential solar systems in ZIP code 92841 through Aug 31, 2026, 199 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Garden Grove, Orange County, as the service city on 1,192 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 140.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 1,195
- Last 24 months
- 199 (Sep 2024 through Aug 2026)
- Capacity
- 8,381.9 kW DC
- Median system size
- 5.9 kW DC
- Net Billing Tariff (NEM 3.0)
- 267 installs, 22.3% of those with a tariff recorded
- Utility
- SCE 1,195
- First install in data
- Jul 31, 2003
- Latest install in data
- Aug 25, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2003 | 1 | 0 |
| 2004 | 0 | 0 |
| 2005 | 1 | 0 |
| 2006 | 0 | 0 |
| 2007 | 2 | 0 |
| 2008 | 3 | 0 |
| 2009 | 4 | 0 |
| 2010 | 6 | 0 |
| 2011 | 8 | 0 |
| 2012 | 14 | 0 |
| 2013 | 14 | 0 |
| 2014 | 29 | 0 |
| 2015 | 93 | 0 |
| 2016 | 130 | 0 |
| 2017 | 59 | 0 |
| 2018 | 45 | 1 |
| 2019 | 52 | 3 |
| 2020 | 46 | 2 |
| 2021 | 88 | 8 |
| 2022 | 132 | 13 |
| 2023 | 199 | 27 |
| 2024 | 108 | 51 |
| 2025 | 101 | 45 |
| 2026 (through Aug 31, 2026) | 60 | 29 |
Battery storage
15.0% of the residential solar installs here include battery storage across all years (179 of 1,195). In the last 24 months the share was 47.7% (95 of 199).
Net metering tariff
Of the 1,195 installs with a net metering tariff recorded: NEM 1.0 342 (28.6%), NEM 2.0 586 (49.0%), the Net Billing Tariff (often called NEM 3.0) 267 (22.3%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
35.4% of the 1,119 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 723 are recorded as not third-party owned. Ownership types recorded: PPA 320, lease 55, prepaid lease 3, other 18.
Installers by installs in 92841
Installers with a page in this index, most installs in this ZIP first. 229 such installers have at least one install here. 56 more installs were by 40 installer names without a page in this index. 43 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 92841 | Last 24 months |
|---|---|---|
| Tesla Energy Operations (formerly SolarCity) | 140 | 5 |
| SWSS ELECTRICAL | 105 | 18 |
| Sunrun | 89 | 28 |
| ECOSOLAR USA ELECTRICAL LLC | 64 | 19 |
| Southwest Sun Solar | 53 | 0 |
| US BUILDER GROUP INC DBA SOLARTIME ELECTRICAL SERVICES | 29 | 3 |
| Vivint Solar Developer, LLC | 28 | 0 |
| FREEDOM FOREVER LLC | 25 | 6 |
| Verengo | 25 | 0 |
| Bright Planet Solar | 23 | 0 |
City and county recorded for 92841
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Garden Grove | 1,192 |
| County: Orange County | 1,195 |
1 other city value on 3 installs, each under 1% of this ZIP’s installs, are not listed.
Common questions
How common are home batteries with solar in 92841?
15.0% of the residential solar installs here include battery storage across all years (179 of 1,195). In the last 24 months the share was 47.7% (95 of 199).
How many solar installs in 92841 are under NEM 3.0?
267 of the 1,195 installs here with a tariff recorded (22.3%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 92841?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (140), SWSS ELECTRICAL (105), Sunrun (89). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.