NLITN energy solutions

How many solar installs has NLITN energy solutions done in California, and which license number is on its installs?

NLITN energy solutions has 91 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Feb 3, 2025 to Aug 31, 2026), most of them in Orange County (54), Los Angeles County (13) and Riverside County (11). CSLB lists license 1131582 (NLITN ENERGY SOLUTIONS LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
91
Last 24 months
91
Total capacity
786.5 kW DC
Median system size
7.3 kW DC
With battery storage
83.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 83.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
47.3% of 91 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
90 installs, latest Aug 31, 2026
Ownership types recorded
PPA 41, prepaid lease 2
Median battery size
13.5 kWh (59 installs list a capacity)
First install
Feb 3, 2025
Latest install
Aug 31, 2026
Counties
5
Utilities
SCE 71, SDGE 20
CSLB license
1131582

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
20252212
2026 (through Aug 31, 2026)6947

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

90 of its 91 interconnected installs (98.9% of the 91 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.9% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011.1%1 (100.0%)
Net Billing Tariff9098.9%58 (82.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 43 of NLITN energy solutions’s installs the utility recorded a third-party ownership type: PPA 41, lease 0, prepaid lease 2, other 0. No residential system in the file lists a third-party owner name that matches NLITN energy solutions exactly.

Third-party owner named on its installsInstalls
Goodleap LLC16
NLITN Energy Solutio6
LightReach5
Goodleap TPO3
Wheelhouse3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 88 of NLITN energy solutions’ 91 installs name a module maker in the “Generator Manufacturer” fields, and most of those (50, 56.8%) used modules recorded as Qcells.

In the last 24 months, 91 of NLITN energy solutions’ 91 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (52, 57.1%) used inverters recorded as Tesla.

In the last 24 months, 59 of NLITN energy solutions’ 91 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (42, 71.2%) used batteries recorded as Tesla.

59 of 59 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells5050
Hyundai1616
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.88
JA Solar77
Silfab22
Inverter makerTesla5252
Enphase4141
ABB11
SolarEdge11
SunPower11
Battery makerTesla4242
Enphase1616
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 88 of 91 installs, inverters on 91. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1131582NLITN ENERGY SOLUTIONS LLC (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJan 13, 2025Jan 31, 202791

License numbers are the ones the utilities recorded on the interconnection applications (91 of 91 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1131582. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list NLITN energy solutions’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2025Total
unincorporated San Diego County113158211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange54
Los Angeles13
Riverside11
San Diego7
San Bernardino6

Top cities

CityInstalls
Huntington Beach6
Laguna Niguel6
Corona5
Lake Forest5
Newport Beach5
San Clemente5
Santa Ana5
Costa Mesa3
Mission Viejo3
San Bernardino3
Trabuco Canyon3
Corona del Mar2
Orange2
Perris2
Placentia2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NLITN ENERGY SOLUTIONS LLC71
NLITN energy solutions20

Common questions

Where does NLITN energy solutions install solar?

Its installs are spread across 5 counties. The most are in Orange County (54 installs), followed by Los Angeles County (13).

How often does NLITN energy solutions install batteries with solar?

83.1% of its interconnected solar installs include battery storage across all years, and 83.1% in the last 24 months (59 of 71). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many NLITN energy solutions installs are under NEM 3.0 (the Net Billing Tariff)?

90 of its 91 interconnected installs (98.9% of the 91 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.