Alltech Solar

How many solar installs has Alltech Solar done in California, and which license number is on its installs?

Alltech Solar has 937 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Oct 8, 2010 to Aug 10, 2026), most of them in San Diego County (897), Orange County (19) and Riverside County (8). CSLB lists license 713479 (ALLTECH SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
937
Last 24 months
106
Total capacity
5,881.1 kW DC
Median system size
5.6 kW DC
With battery storage
69.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 919 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
102 installs, latest Jul 16, 2026
Ownership types recorded
none recorded
Median battery size
27 kWh (18 installs list a capacity)
First install
Oct 8, 2010
Latest install
Aug 10, 2026
Counties
6
Utilities
SDGE 911, SCE 26
CSLB license
713479

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201040
201150
201250
201330
201410
201570
2016130
2017170
2018480
2019890
2020780
20211370
20221870
20231960
2024600
20256412
2026 (through Aug 31, 2026)236

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

102 of its 937 interconnected installs (10.9% of the 937 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0303.2%not counted
NEM 2.080585.9%0 (0.0%)
Net Billing Tariff10210.9%18 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Alltech Solar’s installs. No residential system in the file lists a third-party owner name that matches Alltech Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 84 of Alltech Solar’s 106 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (38, 45.2%) used modules recorded as REC.

In the last 24 months, 106 of Alltech Solar’s 106 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (53, 50.0%) used inverters recorded as Enphase.

In the last 24 months, 18 of Alltech Solar’s 106 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (13, 72.2%) used batteries recorded as Tesla.

18 of 18 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC3841
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.1919
Panasonic16456
Aptos Solar2not in top list
Qcells2not in top list
Inverter makerEnphase53737
Tesla5354
SolarEdge4136
SMA111
SunPower1not in top list
Battery makerTesla1313
FranklinWH44
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 875 of 937 installs, inverters on 925. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Alltech Solar as developer on 6 battery storage projects and as installer on 5 (5 name it as both), 6 projects in all with 100 kWh of storage. 3 have the status Paid, with $7,356 in current incentive allocations. Applications were received from Feb 14, 2023 to Dec 26, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid343$7,356
Reserved226$56,900
Waitlist130$26,554

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209356$83,4550$0
Small Residential Storage229$4,2152$4,215
Large-Scale Storage114$3,1411$3,141

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
713479ALLTECH SOLAR INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorOct 6, 1995Apr 30, 2028899

License numbers are the ones the utilities recorded on the interconnection applications (908 of 937 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 713479. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Alltech Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
unincorporated San Diego County7134791714101421111211110

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego897
Orange19
Riverside8
Los Angeles6
San Bernardino6
Ventura1

Top cities

CityInstalls
San Diego448
Chula Vista63
Escondido47
Carlsbad42
Oceanside31
La Mesa28
El Cajon26
Encinitas24
San Marcos23
Poway19
La Jolla17
Vista17
Santee16
Spring Valley16
Fallbrook9

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Alltech Solar912
ALLTECH SOLAR INC25

Common questions

Where does Alltech Solar install solar?

Its installs are spread across 6 counties. The most are in San Diego County (897 installs), followed by Orange County (19).

How often does Alltech Solar install batteries with solar?

69.2% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (18 of 18). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Alltech Solar installs are under NEM 3.0 (the Net Billing Tariff)?

102 of its 937 interconnected installs (10.9% of the 937 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.