Current Home

How many solar installs has Current Home done in California, and which license number is on its installs?

Current Home has 4,838 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Feb 7, 2019 to Aug 31, 2026), most of them in Riverside County (2,712), San Bernardino County (1,414) and San Diego County (470). CSLB lists license 1045016 (CURRENT HOME SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
4,838
Last 24 months
940
Total capacity
39,115 kW DC
Median system size
7.5 kW DC
With battery storage
29.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 98.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
97.9% of 4,838 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1,218 installs, latest Aug 31, 2026
Ownership types recorded
PPA 641, lease 138, prepaid lease 3, other 3,955
Median battery size
13.5 kWh (1,291 installs list a capacity)
First install
Feb 7, 2019
Latest install
Aug 31, 2026
Counties
7
Utilities
SCE 4,312, SDGE 526
CSLB license
1045016

Is Current Home still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (457 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
20191693
20203898
20216479
20221,35234
20231,061114
2024467415
2025427411
2026 (through Aug 31, 2026)326297

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1,218 of its 4,838 interconnected installs (25.2% of the 4,838 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03,62074.8%142 (4.5%)
Net Billing Tariff1,21825.2%1,149 (98.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 4,737 of Current Home’s installs the utility recorded a third-party ownership type: PPA 641, lease 138, prepaid lease 3, other 3,955. Across all installers, 1,512 residential systems list a third-party owner name that matches Current Home exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova1,594
CURRENT HOME INC DBA CURRENT HOME SOLAR1,503
Sunrun389
Sunlight259
Goodleap197

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 940 of Current Home’s 940 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (400, 42.6%) used modules recorded as Qcells.

In the last 24 months, 940 of Current Home’s 940 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (733, 78.0%) used inverters recorded as Tesla.

In the last 24 months, 856 of Current Home’s 940 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (705, 82.4%) used batteries recorded as Tesla.

1,255 of 1,291 battery-paired PG&E and SCE installs (97.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4001,421
JA Solar295770
SEG Solar68not in top list
Canadian Solar58811
Elin Energy49not in top list
Inverter makerTesla7331,104
SolarEdge1091,412
Enphase791,743
Qcells4141
SunPower12456
Battery makerTesla7051,060
SolarEdge8888
Enphase4451
Qcells1010
FranklinWH4not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,582 of 4,838 installs, inverters on 4,838. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Current Home as developer on 14 battery storage projects and as installer on 16 (14 name it as both), 16 projects in all with 284 kWh of storage. 2 have the status Paid, with $16,112 in current incentive allocations. Applications were received from Sep 4, 2019 to Jun 24, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid233$16,112
Cancelled14251$177,511

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency8172$171,6001$13,200
Small Residential Storage8112$22,0231$2,912

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1045016CURRENT HOME SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing Contractor; C-46 Solar ContractorSep 28, 2018Sep 30, 20284,837

License numbers are the ones the utilities recorded on the interconnection applications (4,838 of 4,838 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1045016. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Current Home’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222023202420252026Total
unincorporated San Diego County104501621262160258319183

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside2,712
San Bernardino1,414
San Diego470
Los Angeles127
Orange110
Ventura3
Kern2

Top cities

CityInstalls
Hemet291
Murrieta266
Temecula210
Moreno Valley180
Beaumont179
San Bernardino178
Yucaipa170
Corona154
Menifee151
Lake Elsinore147
San Jacinto124
Victorville120
Perris112
Winchester99
Wildomar93

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CURRENT HOME INC DBA CURRENT HOME SOLAR3,861
Current Home527
CURRENT HOME INC447
Current Home Inc.2
Current Home Inc1

Common questions

Where does Current Home install solar?

Its installs are spread across 7 counties. The most are in Riverside County (2,712 installs), followed by San Bernardino County (1,414).

How often does Current Home install batteries with solar?

29.9% of its interconnected solar installs include battery storage across all years, and 98.9% in the last 24 months (886 of 896). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Current Home installs are under NEM 3.0 (the Net Billing Tariff)?

1,218 of its 4,838 interconnected installs (25.2% of the 4,838 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.