ADVANCED ENERGY SERVICES INC

How many solar installs has ADVANCED ENERGY SERVICES INC done in California, and which license number is on its installs?

ADVANCED ENERGY SERVICES INC has 542 residential solar installs interconnected in California, active in the records from 2022 through 2025 (Jul 17, 2022 to Jul 17, 2025), most of them in San Diego County (163), Fresno County (78) and Riverside County (74). The license number recorded on most of its installs, 904259, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
542
Last 24 months
14
Total capacity
3,928.1 kW DC
Median system size
6.6 kW DC
With battery storage
1.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 42.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 542 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
108 installs, latest Jul 17, 2025
Ownership types recorded
none recorded
Median battery size
13.5 kWh (1 installs list a capacity)
First install
Jul 17, 2022
Latest install
Jul 17, 2025
Counties
15
Utilities
SCE 249, SDGE 170, PGE 123
CSLB license
904259, 1096696

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
20221290
20233191
2024870
202573
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

108 of its 542 interconnected installs (19.9% of the 542 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 18.8% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 17, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.043480.1%1 (0.3%)
Net Billing Tariff10819.9%3 (18.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ADVANCED ENERGY SERVICES INC’s installs. No residential system in the file lists a third-party owner name that matches ADVANCED ENERGY SERVICES INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of ADVANCED ENERGY SERVICES INC’s 14 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 40.0%) used modules recorded as Canadian Solar.

In the last 24 months, 14 of ADVANCED ENERGY SERVICES INC’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 92.9%) used inverters recorded as Enphase.

In the last 24 months, 3 of ADVANCED ENERGY SERVICES INC’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as Enphase.

4 of 4 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar4232
JinkoSolar2126
LONGi139
Mission Solar1not in top list
Qcells118
Inverter makerEnphase13324
SMA1not in top list
SolarEdge1188
Solis (Ginlong)1not in top list
SunPower140
Battery makerEnphase33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 445 of 542 installs, inverters on 542. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
904259Not found in the CSLB License Master file pulled Nov 4, 2026376
1096696Not found in the CSLB License Master file pulled Nov 4, 2026165

License numbers are the ones the utilities recorded on the interconnection applications (542 of 542 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
San Diego163
Fresno78
Riverside74
Tulare65
Kern53
San Bernardino45
Orange20
Kings17
Los Angeles10
Madera7
Merced4
Placer2
San Joaquin2
Sutter1
Ventura1

Top cities

CityInstalls
Fresno41
San Diego40
Delano34
Chula Vista20
El Cajon20
Escondido20
Tulare16
Visalia16
Hemet14
Moreno Valley14
Riverside13
Highland11
Bakersfield10
Beaumont10
Hanford10

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ADVANCED ENERGY SERVICES INC542

Common questions

Where does ADVANCED ENERGY SERVICES INC install solar?

Its installs are spread across 15 counties. The most are in San Diego County (163 installs), followed by Fresno County (78).

How often does ADVANCED ENERGY SERVICES INC install batteries with solar?

1.1% of its interconnected solar installs include battery storage across all years, and 42.9% in the last 24 months (3 of 7). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ADVANCED ENERGY SERVICES INC installs are under NEM 3.0 (the Net Billing Tariff)?

108 of its 542 interconnected installs (19.9% of the 542 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 18.8% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.