Solar installers in Highland, California

Most installs here are in San Bernardino County.

Who installs the most solar in Highland?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Highland are Sunrun (257), SunPower (46) and Tesla Energy Operations (formerly SolarCity) (39). They account for 342 of the 706 residential solar installs interconnected there in that window.

In all, 4,313 homes in Highland have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 107 installers with installs in this window. 9 installs in the window were self-installed or had no installer recorded.

1Sunrun257631
2SunPower46326
3Tesla Energy Operations (formerly SolarCity)39280
4V3 Electric3967
5BRIGHT OPS3248
6FREEDOM FOREVER LLC32134
7Current Home1780
8LIFESTYLE SOLAR ELECTRIC1515
9LIFESTYLE SOLAR INC1414
10BRYTON POWER LLC99
11SolarMax Renewable Energy Provider, Inc978
12Complete Solar882
13Semper Solaris Construction Inc863
14BETTER EARTH ELECTRIC INC623
15ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING681
16Solar Optimum Inc.619
17DEMAND CONSTRUCTION56
18POWER UP SOLUTIONS LLC55
19Powur PBC (Powur Home)530
20EXO Energy45
21GRID Alternatives419
22LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC411
23MMC ELECTRIC INC44
24SOLAR PRICE DISCOVERY INC DBA SOLAR DISCOVERY45
25A P ELECTRICAL39

Most installs, all time

1Sunrun631631
2SunPower326326
3Tesla Energy Operations (formerly SolarCity)280280
4Vivint Solar Developer, LLC226226
5Horizon Solar Power177177
6Bright Planet Solar142142
7FREEDOM FOREVER LLC134134
8Complete Solar8282
9ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING8181
10Current Home8080

Installs by year

YearInstalls interconnectedWith battery storage
202252545
202364486
2024377251
2025363304
2026 (through Aug 31, 2026)216167

Under the Net Billing Tariff (NEM 3.0)

860 of the 4,313 residential solar installs in Highland (19.9% of the 4,313 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.0% of those include battery storage. The latest was approved Aug 26, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Highland

1Sunrun31129093.2%
2BRIGHT OPS484389.6%
3FREEDOM FOREVER LLC444397.7%
4V3 Electric4242100.0%
5Tesla Energy Operations (formerly SolarCity)383694.7%
6Bright Planet Solar26830.8%
7Current Home2424100.0%
8ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING161062.5%
9LIFESTYLE SOLAR ELECTRIC1500.0%
10LIFESTYLE SOLAR INC1100.0%
11Semper Solaris Construction Inc1111100.0%
12SunPower11545.5%
13BETTER EARTH ELECTRIC INC1010100.0%
14BRYTON POWER LLC99100.0%
15LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC9666.7%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 699 of Highland’s 706 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (343, 49.1%) used modules recorded as Qcells.

In the last 24 months, 706 of Highland’s 706 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (316, 44.8%) used inverters recorded as Enphase.

In the last 24 months, 559 of Highland’s 706 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (304, 54.4%) used batteries recorded as Tesla.

931 of 960 battery-paired PG&E and SCE installs (97.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3431,058
JA Solar94254
LONGi81365
Silfab49not in top list
Canadian Solar43332
Inverter makerEnphase3161,561
Tesla261336
SolarEdge1681,454
SunPower13369
Delta Electronics10not in top list
Battery makerTesla304428
Enphase155218
SolarEdge81138
FranklinWH1423
LG4110

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,633 of 4,313 installs, inverters on 4,312. See the methodology and the equipment index.

ZIP codes in Highland

ZIP codes with their own page where the utilities recorded Highland on at least 10% of the ZIP’s installs, through Aug 31, 2026.

923464,2814,311713

SGIP battery storage projects in Highland

The SGIP report lists 128 battery storage projects with the city Highland, 61 with the status Paid ($418,093 in current incentive allocations, 878 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid61878$418,093
PBI in Process45,348$3,817,359
Reserved13631$249,317
Pending Reservation10780$178,010
Waitlist340$70,406
Cancelled362,714$2,133,420
RRF Rejected19$1,354

Installers named on the most SGIP storage projects in Highland

InstallerProjectsPaid
Sunrun1914
Semper Solaris Construction Inc1512
SolarMax Renewable Energy Provider, Inc94
Tesla83
Citadel Roofing and Solar70
Solar Optimum Inc.61
PetersenDean54
SOLAR 4 AMERICA54
SUNERGY CONSTRUCTION INC55
GRID Alternatives43

7 of the 128 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Highland is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
4,313
Last 24 months
706
Capacity
31.2 MW DC
Median system size
6.6 kW DC
With battery storage
22.3% all time; 80.0% last 24 months
Third-party owned
45.8% where reported
Ownership types recorded
PPA 1,437, lease 324, prepaid lease 2, other 104
Median battery size
13.5 kWh
Earliest install in data
Feb 21, 2001

Common questions

How many homes in Highland have solar?

4,313 residential solar systems in Highland were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 706 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Highland?

107 installer names have at least one install interconnected in Highland in the last 24 months, and 459 appear in the full record.

How common are batteries with new solar in Highland?

22.3% of the solar installs interconnected in Highland include battery storage across all years, and 80.0% in the last 24 months (565 of 706).

How many solar installs in Highland are under NEM 3.0?

860 of the 4,313 residential solar installs in Highland (19.9% of the 4,313 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.