DEMAND CONSTRUCTION

How many solar installs has DEMAND CONSTRUCTION done in California, and which license number is on its installs?

DEMAND CONSTRUCTION has 515 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Dec 26, 2023 to Aug 27, 2026), most of them in San Bernardino County (83), Los Angeles County (76) and Ventura County (70). The license number recorded on most of its installs, 1071038, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
515
Last 24 months
399
Total capacity
3,693.2 kW DC
Median system size
6.4 kW DC
With battery storage
96.1% all time; 96.2% last 24 months
Third-party owned
73.4% of 515 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
507 installs, latest Aug 27, 2026
Ownership types recorded
PPA 369, lease 9
Median battery size
10 kWh (383 installs list a capacity)
First install
Dec 26, 2023
Latest install
Aug 27, 2026
Counties
24
Utilities
SCE 362, PGE 153
CSLB license
1071038, 1128994

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
202311
2024272261
2025223214
2026 (through Aug 31, 2026)1919

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

507 of its 515 interconnected installs (98.4% of the 515 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.081.6%8 (100.0%)
Net Billing Tariff50798.4%487 (96.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 378 of DEMAND CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 369, lease 9, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches DEMAND CONSTRUCTION exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
LightReach256
Light Reach56
Goodleap26
Palmetto Solar, LLC, DBA LightReach16
EverBright8

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 393 of DEMAND CONSTRUCTION’s 399 installs name a module maker in the “Generator Manufacturer” fields, and most of those (253, 64.4%) used modules recorded as Hyundai.

In the last 24 months, 399 of DEMAND CONSTRUCTION’s 399 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (323, 81.0%) used inverters recorded as Enphase.

In the last 24 months, 376 of DEMAND CONSTRUCTION’s 399 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (296, 78.7%) used batteries recorded as Enphase.

487 of 495 battery-paired PG&E and SCE installs (98.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai253296
REC7379
Qcells2480
JA Solar2121
SEG Solar1717
Inverter makerEnphase323438
Tesla5050
SolarEdge3335
Fronius33
Delta Electronics1not in top list
Battery makerEnphase296397
Tesla5362
SolarEdge2525
FranklinWH22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 509 of 515 installs, inverters on 515. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names DEMAND CONSTRUCTION as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 26 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jun 5, 2025 to Jun 5, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Pending Reservation126$31,849

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU126$31,8490$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1071038Not found in the CSLB License Master file pulled Nov 4, 2026416
1128994Not found in the CSLB License Master file pulled Nov 4, 202699

License numbers are the ones the utilities recorded on the interconnection applications (515 of 515 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list DEMAND CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20232024Total
unincorporated San Diego County1071038729

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino83
Los Angeles76
Ventura70
Kern63
Tulare46
Riverside37
Alameda24
Fresno24
Orange19
Santa Clara19
San Mateo14
Kings13
Contra Costa6
Solano6
Monterey2
Placer2
San Luis Obispo2
Santa Barbara2
Santa Cruz2
Butte1
Mariposa1
San Francisco1
San Joaquin1
Tehama1

Top cities

CityInstalls
Bakersfield44
San Bernardino35
Visalia27
Simi Valley20
Fresno17
Hanford13
Camarillo12
Tulare12
Fontana10
San Jose10
Santa Paula10
Delano8
Fremont7
Hayward7
Fillmore6

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DEMAND CONSTRUCTION417
DEMAND CONSTRUCTION INC98

Common questions

Where does DEMAND CONSTRUCTION install solar?

Its installs are spread across 24 counties. The most are in San Bernardino County (83 installs), followed by Los Angeles County (76).

How often does DEMAND CONSTRUCTION install batteries with solar?

96.1% of its interconnected solar installs include battery storage across all years, and 96.2% in the last 24 months (384 of 399).

How many DEMAND CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

507 of its 515 interconnected installs (98.4% of the 515 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.